Xcel Energy Inc. · NASDAQ:XEL
Xcel Energy — Corporate Update (December 2011)
63 slides from Xcel Energy's corporate update, Dec 1, 2011
Slide 1: Colorado DSM Roundtable Discussion
Xcel Energy Colorado DSM Roundtable Discussion December 1, 2011 1:00pm to 4:00pm 1800 Larimer, Room 03G01
Slide 2: Welcome and Introductions
Welcome and Introductions Contact ContactInfo: Info: Suzanne SuzanneDoyle Doyle Manager, Manager,DSM DSMRegulatory RegulatoryStrategy Strategy&&Planning Planning Office OfficePhone: Phone: 612-330-5518 612-330-5518 Cell CellPhone: Phone: 612-599-5785 612-599-5785 E-mail: E-mail: suzanne.galster@xcel
Slide 3: Agenda
Agenda 1:00 – 1:05 Welcome, Introductions (Doyle) 1:05 – 1:15 Program Evaluations Updates (Doyle) 1:15 – 1:45 Regulatory Updates (Cowan) 1:45 – 2:15 DSM Program Highlights (White, Warman, Hueser) 2:15 – 2:30 Break 2:30 – 3:00 EEBC Presentation 3:00 – 3:30 Product Development (Schwain, Goggin) 3:30 –
Slide 4: Program Evaluations Update
Program Evaluations Update Presented By: Suzanne Doyle 4
Slide 5: DSM Process & Impact Evaluations 2011
DSM Process & Impact Evaluations 2011 Final report revisions are currently underway for all four Residential and Business evaluation reports. Targeted final draft completion dates are as follows. Business - Conducted by Tetra Tech MA, Inc. Heating Efficiency: 11/23/2011 Self Direct Custom Effi
Slide 6: DSM Program Evaluations – 2012/2013
DSM Program Evaluations – 2012/2013 2012: Residential – Home Performance Residential – High Efficiency AC Business – Process Efficiency 2013: Residential – Low Income Energy Savings Kits Business – Compressed Air Business - Segment Efficiency Notes: Swap Home Performance and Low Inco
Slide 7: Regulatory Update
Regulatory Update Presented by: Neil Cowan Compliance Complianceinformation informationisisavailable available at atXcel XcelEnergy’s Energy’sDSM DSMWebsite: Website: http://www.xcelenergy.com/About_Us/Rates_&_Regulations/Regulatory_Filings/CO_DSM http://www.xcelenergy.com/About_Us/Rates_&_Regulatio
Slide 8: 2011 60/90-Day Notices
2011 60/90-Day Notices Notification Date Product Type of Notice Feb. 4, 2011 ENERGY STAR Retailer Incentive Pilot Product Changes Feb. 8, 2011 Energy Management Systems Product Changes Mar. 30, 2011 ENERGY STAR New Homes Informational Mar. 31, 2011 Insulation Rebates Informational Apr. 22, 2011 Comp
Slide 9: Timeline of Recent Filings
Timeline of Recent Filings August August25, 25,2011 October 2011 October5,5,2011 2011 November November16, 16,2011 2011 August August31, 31,2011 October 2011 October13, 13,2011 2011 2012/2013 2012/2013DSM DSMPlan Plan 2013/2013 Biennial Settlement 2013/2013DSM DSMPlan Plan 2012/2013 2012/2013DSM DSM
Slide 10: 2012/2013 DSM Plan Settlement Docket No. 11A-631EG
2012/2013 DSM Plan Settlement Docket No. 11A-631EG Energy Savings Incremental Demand Proposed Products Expenditures ($) (Gen kWh or Dth) Savings (Gen kW) 2012 Electric Efficiency 57,024,322 320,049,336 57,748 Saver’s Switch 13,326,964 697,183 20,865 Electric Indirect and Pilots 6,902,097 8,560,821 6
Slide 11: 2012/2013 DSM Plan Settlement Docket No. 11A-631EG
2012/2013 DSM Plan Settlement Docket No. 11A-631EG Energy Savings Incremental Demand Proposed Products Expenditures ($) (Gen kWh or Dth) Savings (Gen kW) 2013 Electric Conservation 61,763,841 327,423,334 65,755 Saver’s Switch 14,075,362 697,183 20,865 ISOC Marketing and Admin. 32,581 0 1,300 0 0 0 T
Slide 12: 2012/2013 DSM Plan Settlement: Program Specific Changes and Additions
2012/2013 DSM Plan Settlement Docket No. 11A-631EG Program Specific Changes and Additions Insulation Rebate Program Home Performance with Energy Star Residential Home Lighting Electric Vehicles Energy Efficiency Financing Energy Star New Homes Waste to Energy Projects 12
Slide 13: 2012/2013 DSM Plan Settlement: Plan Modifications to Address Shortfall
2012/2013 DSM Plan Settlement Docket No. 11A-631EG Plan Modifications to Address Shortfall 2013 Energy Feedback Pilot Showerhead Program Refrigerator Recycling RFP for Innovative Technology Low Income Single Family Weatherization Air Conditioner Tune-Ups 13
Slide 14: DSM Program Highlights
DSM Program Highlights Presented By: Shawn White Kate Warman David Hueser 14
Slide 15: DSM Program Overview
DSM Program Overview Shawn White 15
Slide 16: Portfolio Overview
Portfolio Overview Electric 221.52 GWh YTD (86.6% of Y/E Target) $38.9 M (56.8% of Budget) Gas 340,743 Dth (92.5% of Y/E Target) $12.0 M (76.2% of Budget) 16
Slide 17: 2010/2011 Comparison
2010/2011 Comparison DSM 2010/2011 Comparison 250,000,000 200,000,000 150,000,000 2010 100,000,000 2011 50,000,000 - Q1 Q2 Q3 Quarter 17
Slide 18: Residential and Low-Income Program Highlights
Residential and Low-Income Program Highlights Kate Warman 18
Slide 19: Portfolio Overview
Portfolio Overview Electric 102.63 GWh YTD (131% of Y/E Target) $13.3 M (55% of Budget) Gas 295,396 Dth (119% of Y/E Target) $8.7 M (91% of Budget) 19
Slide 20: High Efficiency Air Conditioning
High Efficiency Air Conditioning 30% more installs over 2010 Marketing and advertising enhancements Audit recommendations Increased contractor participation Customers asking about rebates Using rebates as sales leverage Quality Installation improving Customers asking about Xcel Energ
Slide 21: Home Lighting
Home Lighting Achieved filed goal of 55.7 GWh in July Achievement through 9/30/11: 81 GWh, $2.4 million spent, 1.7 million bulbs sold Launched LED test in September to determine prospective rebate amounts, education needed and sales potential. LED bulbs are still very costly, priced $25 -
Slide 22: Refrigerator Recycling
Refrigerator Recycling Increased Participation Radio General awareness campaigns Word of mouth Incentive Increase From $35 to $50 2012-2015 RFP 22
Slide 23: Non-Profit Weatherization
Non-Profit Weatherization Achievements Made goal in Q3 735,674 kWh 27 projects through Q3 (14 in Q3) Doubled the number of projects in 2010 Participation Process improvements Average project increase 23
Slide 24: Business Energy Efficiency Program Highlights
Business Energy Efficiency Program Highlights David Hueser 24
Slide 25: Product Updates
Product Updates Cooling Efficiency – New Measures Added Product modification – via 60-Day Notice effective August 28, 2011 – expands available prescriptive rebates Plate & Frame Heat Exchangers (PFHE) on chillers Variable Speed Drive (VSD) retrofits for existing chillers PSCo targets busin
Slide 26: Plate & Frame Heat Exchanger
Plate & Frame Heat Exchanger Retrofit to existing chiller systems without air side economizers This type of heat exchanger uses metal plates to transfer heat between two fluids. Well-suited for transferring heat Schematic conceptual diagram An interchangeable plate heat between medium- and of
Slide 27: Variable Speed Drive (VSD)
Variable Speed Drive (VSD) Add prescriptive rebates for retrofitting centrifugal chillers with a VSD Rebate is $1.50 per IPLV 0.01 kW/ton improvement over the chiller’s IPLV without the VSD Applicable to all states within our service territory Key customer benefit: ease of participation with
Slide 28: Product Update: Recommissioning
Product Update Recommissioning Expected to achieve electric goal and already exceeded gas goal Study provider interest in the program has increased New list of required measures is helping to identify more savings for the customer Our recommissioning calculator tool has been adopted positi
Slide 29: Product Update: Energy Management Systems (EMS)
Product Update Energy Management Systems (EMS) Successfully implemented SWEEP’s suggestion around rebates - Marketed as a rebate bonus. Essentially achieved its full year kWh goal (98%), and is on track to achieve 160% of its full year Dth goal. Has achieved 350% of its kW goal, as we are fi
Slide 30: Break
Break 30
Slide 31: Energy Efficiency Business Coalition Energy Modeling Committee
energy efficiency business coalition energy modeling committee {Xcel roundtable 12.1.2011} 31
Slide 32: About the EEBC
Founded in 2007 with the goal of increasing the Business Potential of the Energy Efficiency Industry EEBC serves as the coherent voice of the industry at: Colorado Public Utilities Commission Colorado Governor’s Energy Office The General Assembly and Legislators Xcel Energy, and other Colorado utili
Slide 33: About the Energy Modeling Committee
{about the energy modeling committee} • Formed in November 2010 in partnership with the EEBC • Prior committee partnered with SWEEP • Represents 9 Colorado energy engineering firms • Represent approximately 340 Colorado employees • Represent approximately $52 million in annual revenue in Colorado 33
Slide 34: New Construction Rebate Summary
{new construction rebate summary} EEB Program EDA Program Self Direct Program Incentives < 50,000 sf >50,000 sf > 2 MW load per kW $400 $400 Either $525 per kWh $0 $0.04 Or $0.10 per Dth $7 $7 $0 modeling provided? no yes no 34
Slide 35: Reasons for Request
{reasons for request} • EDA recently received increased incentive thereby giving EEB a disadvantage • There are inefficiencies and duplication in the process when going through EDA • There is more free ridership in the EDA than in the EEB • There is potential for a conflict of interest through selli
Slide 36: Revisions Requested
{revisions requested} •Eliminate the recommended maximum square footage parameters for consumers to participate in EEB •Increase the rebate/incentive to participants in the EEB product to the equivalent $/kW as the Self‐ Direct Product, if the participant brings in a consultant in the design phase o
Slide 37: Benefits of Revisions
{benefits of revisions} • Increase overall participants in the New Construction Product • More modeling of smaller buildings may encourage better accuracy and innovation • Reduced inefficiency and duplication in the consulting process • Significantly reduced free‐ridership • The program would reflec
Slide 38: Example Projects
{example projects} Example Projects: Total Rebate & Modeling Costs Under Each Program Project Size (Sq. Ft.) EDA Program EEB - Current EEB – Enhanced Metro State Center for Student Success 152,000 $198,170 $136,062 $168,812 Byron G. Rogers Federal Office Building 494,000 $581,192 $440,383 $548,758 C
Slide 39: Example Calculations
{example calculations} Calculations: Denver of Nature Science – Education & Collections Facility Building Size: 123,137 sq. ft. EDA Program EEB - Current EEB - Enhanced Electric Demand Incentive $400 $400 $525 Electric Usage Incentive $/kWh $0.04 $- $- Gas Usage Incentive $/Dth $7 $7 $7 Electric Dem
Slide 40: Energy Efficiency Business Coalition Energy Modeling Committee
energy efficiency business coalition energy modeling committee 40
Slide 41: DSM Product Development Update
DSM Product Development Update Presented by: Kevin Schwain and Pat Goggin DSM DSMWebsite Websiteprovides providesprogram programidea ideasubmission submissionforms formsat: at: http://www.xcelenergy.com/About_Us/Rates_&_Regulations/Regulatory_Filings/CO_DSM_Plan http://www.xcelenergy.com/About_Us/Ra
Slide 42: Product Development Team
Product Development Team 10 Resources able to flex across across 4 Platforms Energy Efficiency Renewable Energy Load Management Customer Choice Manager: Kevin Schwain, 612-330-5961 Energy Efficiency Lead: Pat Goggin, 303-294-2370 42
Slide 43: Product Development Process
Product Development Process Comprehensive review and alignment of EE and Non-EE PD processes PD Process Overview Clearer definition of stages and gates by PD platform Prioritized list of EE ideas Framing list more focused Process more in-line with industry best practices 43
Slide 44: Why Prioritize?
Why Prioritize? Opportunity Prioritization Concept Filing & Launch # of Approval Approval Approval Approval Ideas Concept Development Launch Opportunity Framing Evaluation Identification Concept Development Launch Opportunity Framing Evaluation Identification Level of Effort 44
Slide 45: Prioritization Results
Prioritization Results ID Product Developer Status Idea Inital Look Product-1 New Framing Active MN AM Pref CO AM Pref NM AM Pref PM Support External Lead Juris Lead Filing Filing Due Quadrant Research Customer & Market Insights Score Advocacy Date Deliverables 712 Nathan Huso Framing MN Residential
Slide 46: Net Impacts
High Priority Potential Map Idea 1 Idea 10 Idea 9 > 5 GWh Idea 11 Idea 2 Net Impacts Idea 8 Idea 6 2‐5 GWh Idea 3 Idea 5 Idea 7 <2 GWh Idea 4 Long Medium Short Time to Development High Priority Development Opportunities ‐ Framing 46
Slide 47: CO Settlement Work for PD
CO Settlement Work for PD Settlement Task Deliverable Time Period Energy Feedback Determine pilot cost effectiveness and add 50,000 Q1-Q4, 2012 customers to the pilot Refrigerator Recycling 60 Day Notice to add in first quarter, 2012 Q1, 2012 RFP for Innovative Technology RFP for innovative programs
Slide 48: DSM Roundtable Ideation Submissions – 3rd Quarter
DSM Roundtable Ideation Submissions – 3rd Quarter Received request June 29, 2011 - T.J. Aubin, American Mechanical Services Economizer Optimization and Adjustment, provide for the inspection and testing for proper operation of rooftop units (RTUs) On-Bill Financing, offer low interest financin
Slide 49: Economizer Optimization and Adjustment
Economizer Optimization and Adjustment Product Description Provide for the inspection and testing for proper operation of rooftop units (RTUs) Include the following services Quality assurance check of refrigerant charge Recalibration of economizer Recalibration of thermostat schedules an
Slide 50: Economizer Optimization and Adjustment
Economizer Optimization and Adjustment Situation Analysis Field studies found that more than half of outside air economizers on RTUs are not providing optimal savings due to Failed dampers or controls Incorrect settings for changeover Improper type of controls installed Puget Sound Energ
Slide 51: Economizer Optimization and Adjustment
Economizer Optimization and Adjustment Cost Benefit Analysis Assumptions Inspection and repair – $300 (3 hours work at $100/hr) 25% energy savings Rebate at 50% of incremental cost ($150) Simple payback before rebate: 2.4 months MTRC = 1.28 Next Steps: Market research and framing pri
Slide 52: On Bill Financing
On Bill Financing Product Description Provide On Bill Financing (OBF) through Xcel Energy for energy efficient upgrades for buildings less than 200,000 SF with a max of 200 kW demand for up to $100,000 at 0% interest. 52
Slide 53: On Bill Financing
On Bill Financing Energy Efficiency Financing is addressed in the Stipulation and Settlement Agreement for the CO 2012-2013 DSM Biennial Plan: “The Company agrees it will work with interested stakeholders between now and June 1, 2012 to develop a program to support financing of energy efficiency
Slide 54: Plan B RTUs
Plan B RTUs 2011 CO Settlement Requirement … the Company agrees to evaluate options for including an Early Replacement retrofit product in its portfolio. As part of that evaluation the Company shall consider the applicability of its residential replacement product for business customers… Xcel Ener
Slide 55: Plan B RTUs
Plan B RTUs Assumptions 7 year measure life Baseline equipment cost based on RTU purchased 7 years in the future in today’s dollars Rebate at 50% of incremental cost Simple payback before rebate: 1.9 years MTRC = 3.08 Next Steps: Continue PD process 55
Slide 56: New Products in Development: Commercial
New Products in Development for potential 60-day Notice or 2012/2013 Filing Commercial Status Potential Filing Computer Efficiency Launched Plate & Frame Heat Exchangers Launched LED Wall Pack fixtures Development 2012 60 Day Commercial Food Service Equipment Development 2012 60 Day Lighting Fixture
Slide 57: New Products in Development: Industrial
New Products in Development for potential 60-day Notice or 2012/2013 Filing Industrial Status Potential Filing Plan A VSD Air Compressors Launched VSDs on Chillers Launched Efficient Small Motors - ECMs Development 2012/2013 Biennial Turn Key Services Development 2012 60 Day Low loss filters (mist e
Slide 58: New Products in Development: Residential
New Products in Development for potential 60-day Notice or 2012/2013 Settlement Residential Status Potential Filing A/C Tune-Up Residential/Small RFP Pending (Settlement) 2012 60 Day Commercial EC motors for furnaces Concept Evaluation 2012 60 Day Residential Multi-family Concept Evaluation 2012 60
Slide 59: Savings Have Ramped up Quickly
Savings Have Ramped up Quickly 59
Slide 60: Measurable Savings from Both Print and Email Participants
Measurable Savings from Both Print and Email Participants 60
Slide 61: New Ideas?
New Ideas? CO Roundtable Ideas Submit complete Roundtable Idea Form at least 90 days prior to a CO Roundtable Meeting in order for an analysis to be presented at that meeting. Incomplete Idea Forms will be returned to submitter for completion 90 Day window starts when form is complete Roun
Slide 62: Wrap-up / Open Discussion
Wrap-up / Open Discussion Upcoming UpcomingRoundtable RoundtableSchedule: Schedule: Q4: Q4:February February16, 16,2012 2012 62
Slide 63: Xcel Energy: Responsible by Nature
Qe Xcel Energy’ RESPONSIBLE BY NATURE™