Escalera Resources — Double Eagle Petroleum — Investor Presentation (June 2004)
31 slides from Escalera Resources's investor presentation, Jun 9, 2004
Slide 1: 2003 Financial & Operating Highlights
Double Eagle Petroleum 2003 Financial & Operating Highlights
Slide 2: Disclaimer
DISCLAIMER This presentation may contain projections and other forward-looking statements within the meaning of Section 21 E of the Securities Exchange Act of 1934, as amended. Any such projections or statements reflect the Company’s current views with respect to future events and financial performa
Slide 3: 2003 Accomplishments
Double Eagle Petroleum 2003 Accomplishments Increased Reserves Increased Production Reestablished Profitability Completed $12.5 million Private Placement Eliminated Long Term Debt Strengthened WI Position in CBM Play
Slide 4: Proven Reserves
Double Eagle Proven Reserves Gas — BCFE 25 20 15 10 5 0 2000 2001 2002 2002(a) 2003
Slide 5: Proven Producing and PUD Reserves
Double Eagle Proven Producing PUD BCFE PP BCFE 25 20 15 10 5 0 2000 2001 2002 2002(a) 2003
Slide 6: Replacing Reserves
Double Eagle Replacing Reserves Prod mmcfe New mmcfe 8000 7000 6000 5000 4000 3000 2000 1000 0 2000 2001 2002 2003
Slide 7: Production By Quarter
Double Eagle Production By Quarter -MMCFE 500 450 400 350 300 250 200 150 100 50 0 1Q 02 2Q 02 3Q 02 4Q 02 1Q 03 2Q 03 3Q 03 4Q 03 1Q 04
Slide 8: Operating Costs
Double Eagle Operating Costs LOE Per MCFE Tax/$MCFE Cost/$MCFE 1.4 1.2 1 0.8 0.6 0.4 0.2 0 0.35 0.48 2000 0.49 0.78 2001 0.27 0.59 2002 0.30 0.56 9/02-12/02 0.51 0.71 2003 0.59 0.63 1Q 2004
Slide 9: Capital Spending
Double Eagle Petroleum Capital Spending 12 10 8 6 4 2 0 2.2 2000 2.7 2001 5.1 2002 10.1 2003 2.7 1Q 2004 $ Millions
Slide 10: 2003 Capital Spending
Double Eagle 2003 Capital Spending Development Spending $7.6 Million (75%) Leasehold Exploration Development
Slide 11: 2003 Drilling Activity
Double Eagle 2003 Drilling Activity Producing Wells Oil - Gross Oil - Net Gas - Gross Gas - net Total Gross Total Net 8/31/02 New Wells 4 mos. 12/31/02 12 mos. 12-31-03 12/31/03 109 6.3 0 0 2 .04 111 6.4 271 16.0 4 .01 35 5.4 310 21.4 390 4 37 421 22.3 .01 5.44 27.8
Slide 12: Finding Costs
Double Eagle Finding Costs 1.2 1 0.8 0.6 0.4 0.2 0 2001 0.82 1.15 2002 1.01 2003 $ MCFE
Slide 13: Operating Cash Flow
Double Eagle Operating CF $(000’s) 2001 2002 2003 Revenue 2,581 2,270 6,138 935 1,012 1,989 Operating Costs G & A, Interest, 889 947 1,425 Net Cash Flow 757 311 2,724
Slide 14: Debt to Equity
Double Eagle Debt to Equity $ Millions 20 18 16 14 12 10 8 6 4 2 0 2000 2001 2002 2003 Debt Equity
Slide 15: Debt to Equity Ratio
Double Eagle Debt to Equity Ratio 35 30 25 20 15 10 5 0 0 2000 2001 18 35 2002 0 2003 %
Slide 16: G&A Per MCFE
Double Eagle Petroleum G & A Per MCFE 1.4 1.2 1 0.8 0.6 0.4 0.2 0 0.81 2000 1.21 2001 0.81 2002 0.67 9/02-12/02 0.86 2003 1Q 2004 $ MCFE
Slide 17: Eastern Washakie and Pinedale Anticline
Double Eagle Petroleum Co. Eastern Washakie Pinedale Anticline
Slide 18: Atlantic Rim Area Blowup
¢ Atlantic Rim Area Blowup
Slide 19: CCU 11-7 Washakie Basin Mesaverde Coal Bed Well
CCU 11-7 WYOMING WASHAKIE BASIN MESAVERDE COAL BED WELL 950 mcfpd, 1000 bwpd, 370 psi flowing casing pressure (up 5 1/2”) Cow Creek Uint #11-17 To MEASAVERDE
Slide 20: Arbitrary Line Cross Section
Arbitary Line SW NE 1100 1200 1300 1400 1500 1600 1700 1800 1900 2000 2100 2200 2300 238 07 4737 5238 6679 7509 6610 18606 13002 16926 17125 20228 19858 19830 20998 23199 22021 23193 24377 23255 27333 287113 2848 34222 354 Frontier Nowry Dakota Nugget Tensleep Madison
Slide 21: Cow Creek and Sun Dog Units
R92W R91W 2 1 18-1 6 5 4 3 8 1 44-1 24-8 41-11 41-18 33-12 11-7 12-12 22-16 42-12 22-7 12 13-7 3-12 34-18 44-12 14-2 22-13 2-18 COW CREEK UNIT 11 14 23 13 18 24 19 20 21 SUN DOG UNIT 12-3 10-3 14-3 16-6 1-18 17 10-17 16-17 5500 5700 6000 6300 9 10 16 15 21-2 T16N COW CREEK 0 0.5 1.0 miles
Slide 22: Cow Creek Water and Gas
Cow Creek water avg water well #wells avg gas well gas
Slide 23: Gas Recovery: Conventional vs. Coalbed
GAS RECOVERY CONVENTIONAL VS. COALBED Gas Filled Porosity Sand Grain Butt Cleat Face Cleat Matrix Blocks Containing Micropores Gas Rate Producing Time Gas Rate Producing Time
Slide 24: Productive Stages of a Coal Bed Methane Well
PRODUCTIVE STAGES OF A COAL BED METHANE WELL Volume (1) Dewatering Stage (2) Stable Producing Stage (3) Decline Stage Gas Water Time
Slide 25: Drunkard's Wash Average of First Three Wells
Drunkard’s Wash Average of First Three Wells mcfpd 1000 100 10 bwpd 1000 100 10 Months 1 4 7 10 13 16 19 22 25 28 31 34 37 40 43 46 49 52 55 58 61 64 67 70 Gas Water
Slide 26: Drunkard's Wash Versus Cow Creek 42-12
Drunkard’s Wash Versus Cow Creek 42-12 (Post Frac) MCFPD 10000 1000 100 10 BWPD 10000 1000 100 10 MONTHS 1 4 7 10 13 16 19 22 25 28 31 34 37 40 43 46 49 52 55 58 61 64 67 70
Slide 27: Atlantic Rim Area Isopach of Almond Coals
Atlantic Rim Area Isopach of Almond Coals
Slide 28: Atlantic Rim Regional Cross Section
Atlantic Rim Regional Cross Section
Slide 29: Eastern Washakie Basin Units
Eastern Washakie Basin Units
Slide 30: Pinedale Anticline Downspacing
Pinedale Anticline Downspacing to 20 acres Deeper Test Back in at the Mesa “C”
Slide 31: Monthly Production
MONTHLY PRODUCTION 200,000 150,000 100,000 50,000 0 2001 2002 2003 2004 Cow Creek Mesa Unit Other
Double Eagle Petroleum — Investor Presentation (June 2004) on 6ix