Archer Materials Limited · ASX:AXE

Archer Materials — Archer Exploration — Shareholder Meeting (November 2014)

28 slides from Archer Materials's shareholder meeting presentation, Nov 5, 2014

  1. Slide 1: 2014 Annual General Meeting

    For personal use only ARCHER EXPLORATION LIMITED 2014 Annual General Meeting 5th November 2014 Gerard Anderson Managing Director

  2. Slide 2: Disclaimer

    Disclaimer Competent persons statement For personal use only The exploration results and Exploration Target reported herein, insofar as they relate to mineralisation, are based on information compiled by Mr Wade Bollenhagen, Exploration Manager of Archer Exploration Limited. Mr Bollenhagen is a Memb

  3. Slide 3: Presentation outline

    Presentation outline  Project locations For personal use only  Eyre Peninsula Graphite Project  JORC 2012 Graphite Resource  Mine approvals process  Baseline studies  Environment Impact Assessment  Visual amenity  MLP progress  Proposed Campoona Shaft mine  Proposed Sugarloaf processing fa

  4. Slide 4: Project locations

    Project locations Portfolio of high quality assets For personal use only Eyre Peninsula Graphite Project 4

  5. Slide 5: Eyre Peninsula Graphite Project

    Eyre Peninsula Graphite Project Significant graphite tenements For personal use only  Substantial tenement position (2,154km2) in graphite province  Waddikee EL4662 purchased on 23rd July 2014  Key projects include Campoona Shaft, Central Campoona, and Wilclo South  There are an additional 10 gr

  6. Slide 6: JORC 2012 graphite Resource

    JORC 2012 graphite Resource Australia’s largest combined JORC 2012 graphite resource For personal use only 8.55Mt @ 9.0 Cg% (lower cut-off grade of 5% Cg)* Resource Tonnes Graphite Contained Graphite Area Category (Mt) (% Cg) (tonnes) Measured 0.32 12.7 40,600 Campoona Shaft Indicated 0.78 8.2 64,00

  7. Slide 7: Mine approvals process

    For personal use only Mine approvals process 7

  8. Slide 8: Baseline studies

    For personal use only Baseline studies 8

  9. Slide 9: Eyre Peninsula graphite project

    For personal use only Eyre Peninsula graphite project 9

  10. Slide 10: Eyre Peninsula graphite project - visual amenity

    For personal use only Eyre Peninsula graphite project - visual amenity 10

  11. Slide 11: Eyre Peninsula graphite project – MLP progress

    Eyre Peninsula graphite project – MLP progress Campoona Mining Lease Proposal to be submitted in Q1 calendar 2015 For personal use only Task Work undertaken to date Work in progress Spring & Winter baseline surveys  Completed Ecology Impact assessment  Completed Air quality Project reviewed & GAP

  12. Slide 12: Proposed Campoona Shaft mine

    For personal use only Proposed Campoona Shaft mine Noise bund Waste rock dump Isometric view of open cut layout looking north showing the deposit geologic block model (ore disposition) within the pit. Open pit is shown in brown (10.2Ha), the waste rock noise bund to the right of the open pit (2.6Ha)

  13. Slide 13: Proposed Sugarloaf processing facility

    Proposed Sugarloaf processing facility • Compact site. For personal use only • Original position near existing buildings moved to the south to minimise visual impact. • Existing shed used as warehouse. • Process involves: Crushing – Blunging – Rougher Flotation – Concentrate Milling - Cleaner/Reclea

  14. Slide 14: Sugarloaf process water

    Sugarloaf process water • Saline groundwater For personal use only located at Pindari near the junction of Ross Ramsay and Carrapee Hill Road. • Water quality - ≈ 22,500ppm TDS. • SA Water potable water allocation of 40ML/yr rising to 80ML/yr if required. 14

  15. Slide 15: Campoona Shaft graphite products

    Campoona Shaft graphite products Campoona: high grade, fine flake graphite For personal use only  Bulk flotation tests provided concentrates grading 92 – 98% Cg  acid cleaning upgrades concentrates up to 98% Cg – 99.7% Cg  Archer has opportunity to enter the higher value end of the graphite marke

  16. Slide 16: Graphite demand and market focus

    Graphite demand and market focus Macro environment: a growing market with a bright future For personal use only  Chinese supply (~70% of market) is declining due to mine closures, increasing costs and environmental challenges  Emerging production capacity especially in Africa & Australia  Graphit

  17. Slide 17: Infrastructure

    Infrastructure Access to critical infrastructure Eyre Peninsula Project For personal use only  Electricity at Darke Peak for Sugarloaf, poles and wires for Campoona mine site  Various port options  Good road network  Company owns land at Sugarloaf and Campoona Shaft, and has a binding HoA over t

  18. Slide 18: Land

    Land Archer owns the land needed for mining and mineral processing For personal use only  Campoona Shaft and Sugarloaf both occur on freehold pastoral land  Archer owns Sugarloaf (1,403 acres) and has binding HoA over sufficient land at Campoona Shaft for mining to proceed  Early land purchases h

  19. Slide 19: Waddikee flake graphite

    Waddikee flake graphite Waddikee: acquisition added flake graphite and trebled JORC Resources For personal use only  Recently completed acquisition of neighbouring EL4662 from Monax Mining Limited  JORC 2012 Indicated Resource at Wilclo South of 6.4Mt grading 8.8% Cg (561,400t of contained graphit

  20. Slide 20: Wilclo South flake graphite

    Wilclo South flake graphite In the oxide zone 42% - 55% of the graphite is recoverable into marketable flake products For personal use only >75µm Fine Flake >125µm Fine Flake >180µm Large Flake >300µm (+50 mesh) Extra Large Flake >425µm (+32 mesh) Extra Large - Jumbo Flake Graphite size (µm) Graphit

  21. Slide 21: Waddikee – flake

    Waddikee – flake Argent has very large flake potential For personal use only  Very coarse 1-5mm crystalline graphite in surface float  Previous petrology recorded flake graphite 1-2mm in length.  Notices of Entry served, waivers signed and awaiting DRD EWA approval.  Expect to commence drilling

  22. Slide 22: Additional graphite targets

    Additional graphite targets Waddikee : strong likelihood for further Resource growth For personal use only  High quality electromagnetic database outlines >30kms of distinct linear conductive bodies that remain to be fully drill tested.  7 known graphite prospects all coincident with EM conductors

  23. Slide 23: Additional graphite targets

    Additional graphite targets Waddikee: EM provides excellent predictive vectoring tool for exploration for flake graphite For personal use only asset Wilclo South open to the north Wilclo South Resource of 6.38Mt grading 8.8% Cg over 1.2kms is open to the north and south for several kilometres. Wilcl

  24. Slide 24: Graphite: Research & Development

    Graphite: Research & Development Two-year research program with University of Adelaide into graphite and graphene For personal use only related products. Early work closing in on “proof of concept” agricultural application. Graphite Prepared Semi- Prepared Archer Graphene Materials products Products

  25. Slide 25: Eyre Peninsula Graphite Project - summary

    Eyre Peninsula Graphite Project - summary Australia’s largest JORC 2012 graphite Resource For personal use only  Archer has assembled a portfolio of tenements covering 2,154km2 near Cleve-Darke Large Position in a Peak-Kimba on Eyre Peninsula, South Australia 1 Premium Graphite  The Eyre Peninsula

  26. Slide 26: Leigh Creek magnesite

    Leigh Creek magnesite Archer Exploration owns the world’s largest cryptocrystalline magnesite deposit For personal use only  100% interest in Leigh Creek deposit – world’s largest cryptocrystalline magnesite deposit  JORC Resource of 453Mt grading 41.4% MgO – almost 50% of the world’s known crypto

  27. Slide 27: Precious metals & manganese

    Precious metals & manganese Broad range of high quality copper and gold exploration prospects in SA For personal use only Gold  Wildhorse Plain – several km epithermal gold anomaly at Bartel  early exploration with best intercept of 29m @ 0.57g/t Au  Napoleon’s Hat & Watervale – early stage targe

  28. Slide 28: Archer's strategic priorities

    Archer’s strategic priorities Progress graphite prospects and unlock magnesite potential For personal use only  Market engagement commenced for Campoona graphite for off-take and/or JV partners – steady progress  Drill out of graphite deposits and prospects to identify the key prospects to take fo

Archer Exploration — Shareholder Meeting (November 2014) on 6ix