Monumental Energy Corp. · TSXV:MNRG

Monumental Energy — Investor Presentation (September 2026)

17 slides from Monumental Energy's investor presentation, September 2026

  1. Slide 1: New Energy. New Zealand

    SEPTEMEBER 2026 NEW ENERGY . NEW ZEALAND TS X-V: M N R G | F S E : Z A 6 | OTC Q B : M N M R F

  2. Slide 2: Forward Looking Statements

    Forward Looking About Project Investment Summary Contact us Forward Looking Statements Statements This presentation contains certain forward-looking statements and forward-looking information (collectively referred to herein as “forward looking statements”) within the meaning of applicable securitie

  3. Slide 3: Directors & Management Team

    About Project Investment Summary Contact us Directors & Management Team Maximilian Sali Ryan Cheung Bill Treuren Chris Mackay Michelle DeCecco CEO, Director & Founder CFO & Director Lead Technical Director Director Director Maximilian Sali is a capital Ryan Cheung, CPA, CA, Bill Treuren brings more

  4. Slide 4: The New Zealand Oil & Gas Play

    The New Zealand The Waihapa production station Oil & Gas Play IN PARTNERSHIP WITH NEW ZEALAND ENERGY CORP. (TSXV: NZ) Expanding portfolio to include long-term royalty with oil and gas infrastructure to support stable cash flow and shareholder returns. 25% Royalty Agreement on multiple wells within t

  5. Slide 5: Ngaere-1 and Ngaere-2

    Ngaere-1 Delivered flush production of 3,000 barrels and is currently producing at an unstimulated flow rate of 120 BOPD. Perforations targeted a bypassed pay zone in the the Mount Messenger Formation, located within 100M of surface Encountered 30 meters of pay in the Mount Messenger formation (same

  6. Slide 6: Waihapa H1

    Waihapa H1 Exceeded expectations with 568 BOPD stable, unstimulated production of 36-40° API oil 3,000-barrel initial flush production following perforation program Low-cost perforations were initiated across 7 intervals (6 meters each) Rapid return to production with all 7 perforations successful a

  7. Slide 7: The Copper Moki 1 & 2 Oil and Gas Wells

    About Project Investment Summary Contact us The Copper Moki 1 & 2 Oil and Gas Wells Assets with maintained infrastructure 3 KM gas line tied into the Waihapa Production facility Almost 1M barrels produced at Copper Moki before the wells were shut in due to mechanical issues. Both well online est. 10

  8. Slide 8: Current Project Pipeline

    Current Project Pipeline Current and Near-Term Revenue Generating Projects Project by PRODUCTI COST PROJECT STATUS PAYBACK TERMS TIMING completion ON Est. (MNRG) Moki 100 Completed & 25% royalty after 75% A $440k Finished 1+2 BOE/day Online cost recovery 120 Completed & 25% royalty after 75% Ngaere

  9. Slide 9: Blue Sky: Extended Exploration & Production Strategy

    Blue Sky: Extended Exploration & Production Strategy Strategic Goal: Monumental is positioned to acquire undervalued assets through farm-ins, distressed sales, and open acreage, while leveraging the Waihapa/Ngaere infrastructure to accelerate revenue generation. Balanced portfolio: near-term cashflo

  10. Slide 10: Tirua Point Accepted Application

    Tirua Point Accepted Application Application has been accepted over the application prospect is located onshore and offshore in the Northern Taranaki It is a Mangahewa Formation Sandstone play with a resource potential of 200 BCF & 12MMBO (recoverable) ~2000m Deeper Taniwha Fm Cretaceous play-multi

  11. Slide 11: Composite Log Plot

    Composite Log Plot MANGAHEWA FORMATION Net 50m 1185 overpressure Exceptional reservoir thickness and pressure in the Phi 0.93 Sw 0.94 gradient 1.409psi/m basin’s primary deep gas play Vcl 0.08 Mangahewa is the main deep gas reservoir in Taranaki Strong overpressure supports deliverability and recove

  12. Slide 12: The Infrastructure: Near Term Gas Production in New Zealand

    About Project Investment Summary Contact us The Infrastructure The Waihapa Production Station and associated Near Term Gas infrastructure includes (NZEC 50% interest): Production in New 45 mmcf/d gas processing, gas compression and LPG extraction facility (“TAWN facility”). Zealand 51-km 8-inch gas

  13. Slide 13: Near Term Gas Production and Storage Project

    About Project Investment Summary Contact us Near Term Gas Production and Storage Project New Zealand receives $10-15 USD per MCF of natural gas which is sold immediately to the local market, a massive premium to natural gas prices in North America. Lack of any new gas projects has left big energy co

  14. Slide 14: Investment Opportunity

    About Project Investment Summary Contact us Investment Opportunity Monumental Energy currently owns 1M Previous gas production of 50 Billion free trading shares. Square Cubic Feet (BSCF) with the potential to add between 17-20 BSCF 30M $NZ in tax losses to offset potential (100% basis) with the Tari

  15. Slide 15: Government Announces Funding & Partnerships

    About Project Investment Summary Contact us Government Announces Funding & Partnerships May 2025 The newly elected governments resources Minister, Shane Jones, announced funds of $200 million for Crown co- investment in new domestic gas field developments in the 2025 budget. The new initiative could

  16. Slide 16: Share Structure

    About Project Investment Summary Contact us Share Structure 112,638,290 Significant Insider Holdings Issued & Outstanding 4,530,000 | Maximilian Sali 67,115,077 CUSIP 61534M108 Warrants @ .08, .15, .175, .25, .30 ISIN CA61534M1086 10,075,000 Stock Options @ .05, .10, .13 Transfer agent Computershare

  17. Slide 17: Contact Us

    TS X-V: M N R G | F S E : Z A 6 | OTC Q B : M N M R F Contact Us Maximilian Sali, Chief Executive Officer, Director and Founder max@monumental.energy max@monumental.energy 604-367-8117 Vancouver Office New Plymouth Office, NZ #228- 1122 Mainland #11 Young St. New Plymouth Central, Vancouver, BC Cana

Monumental Energy — Investor Presentation (September 2026) on 6ix