Ivanhoe Mines Ltd. Class A · TSX:IVN
Ivanhoe Mines Ltd. Class A — Investor Presentation (November 2026)
44 slides from Ivanhoe Mines Ltd. Class A's investor presentation, Nov 11, 2026

Slide 1: Investor Presentation
TSX: IVN | OTCQX: IVPAF INVESTOR PRESENTATION November 2026

Slide 2: Disclaimer and Forward-Looking Statements
DISCLAIMER AND FORWARD-LOOKING STATEMENTS The information contained in this presentation and other information furnished by or on behalf of Ivanhoe Mines Ltd. (“Ivanhoe”) has been prepared to assist the reader in understanding the business and financial results of Ivanhoe for the periods indicated a

Slide 3: Ivanhoe at a Glance
IVANHOE AT A GLANCE CORPORATE INFORMATION TSX: IVN LISTINGS OTCQX: IVPAF SHARE PRICE(1) C$8.08 / share MARKET CAP(1) US$8.08 billion SHARES, OPTIONS, RSUs, Basic Shares: 1,426.5 million PSUs & DSUs(2) Diluted Shares: 1,432.9 million NET DEBT POSITION(3) US$797 million CITIC Metal 21.2% Zijin Mining

Slide 4: A Leading Producer, Developer and Explorer
A LEADING PRODUCER, DEVELOPER AND EXPLORER OWNERSHIP: Operating Mines Exploration Projects KAMOA-KAKULA Ivanhoe Mines (39.6%) Zijin Mining Group (39.6%) Government of DRC (20%) Crystal River Global (0.8%) KAZAKHSTAN: Copper Copper OWNERSHIP: KIPUSHI Ivanhoe Mines (62%) Gécamines (38%) WESTERN FORELA

Slide 5: Growing Mining Success in the DRC
GROWING MINING SUCCESS IN THE DRC The DRC is the 2nd largest global copper exporter; 40% of Congolese GDP is directly from the mining industry(1) Copper production in DRC has increased by >300% in the past 10 years cementing position as world’s second largest producer 7% year-on-year increase in cop

Slide 6: Kamoa-Kakula
On-site Direct-to-Blister Smelter at Kamoa-Kakula KAMOA-KAKULA The world’s highest grade and greenest major copper complex 6

Slide 7: Kamoa-Kakula Quarterly Production
KAMOA-KAKULA QUARTERLY PRODUCTION (Figures shown on 100% basis for Kamoa-Kakula) Total ore tonnes milled (‘000’s tonnes)(1) / Milling rates at 12-month high, equivalent to Combined copper ore grade processed (%) 14 Mtpa; driven by improved mining rates at both Kamoa and Kakula 2.47% 2.35% 2.32% 2.39

Slide 8: Study the Future of Kamoa-Kakula
STUDY THE FUTURE SLIDE… OF KAMOA-KAKULA Fully integrated, flexible and de-risked top-tier copper producer Life-of-mine plans introduce high-grade, shallow open pit mining to complement underground mines Refreshed operating plan introduces significantly de-risked and flexible ore mix and reduces over

Slide 9: Unlocking Production Flexibility at Kamoa-Kakula
UNLOCKING PRODUCTION FLEXIBILITY AT KAMOA-KAKULA Kamoa-Kakula will introduce shallow, high- Copper Production Range grade open pits add mining from open pits 290kt 300kt - 350kt 400kt - 450kt to support underground operations Mill Feed Ore by Source and Head Grades 20 Pre-stripping of Kamoa open pit

Slide 10: Kamoa Open Pits Introduction
STUDY SLIDE… OF KAMOA OPEN PITS INTRODUCTION Approx. 3.5 million tonnes of sulphide ore at an average grade of 2.5% expected from open pits by end of 2028 Open pits add a scalable ore source, helping Kamoa rebuild stockpiles and improve operational flexibility Isometric view of the planned starter o

Slide 11: Open Pits to Be Among Highest-Grade Globally
OPEN PITS TO BE AMONG HIGHEST-GRADE GLOBALLY Steady state open pit Global Open Pit Copper Mines (>50kt Production) ore tonnes targeting 3.0% ~40% of feed post Phase 4 expansion 2.5% Potential Kamoa open pit production Multiple shallow open 2.0% Copper Grade pit footprints provides production flexibi

Slide 12: 2029 & Beyond: Phase 4 Provides Pathway to 500 ktpa
2029 & BEYOND: PHASE 4 PROVIDES PATHWAY TO 500 KTPA Pre-completed for Phase 4 Phase 4 footprint Phase 3 design anticipated a similarly sized Phase 4 Synergies with existing Phase 3 crushing circuit and pre-completed earthworks reduce Phase 4 capital Phase 4 expansion is expected to add an additional

Slide 13: 500,000-Tonne-Per-Annum Smelter at 60% Capacity
500,000-TONNE-PER-ANNUM SMELTER AT 60% CAPACITY On-site smelter is the largest copper in Africa, operating at ~60% of capacity since mid-February Kamoa-Kakula produced 76,401 tonnes of copper in saleable products(1) in Q3 2026 Kamoa-Kakula had approx. 43,000 tonnes of unsold copper in inventory at t

Slide 14: 60 MW of Continuous Baseload Solar Power
60 MW OF CONTINUOUS BASELOAD SOLAR POWER On-site hybrid solar (PV) facility with battery backup, fully ramped up delivering 60 MW of baseload power to Kamoa-Kakula operations Two PPAs signed to increase on-site solar power capacity with battery storage to 120 MW by end of 2027 and additional 30 MW b

Slide 15: Margins Boosted by Kamoa-Kakula Smelter
MARGINS BOOSTED BY KAMOA-KAKULA SMELTER (Figures shown on 100% basis for Kamoa-Kakula) At 60% capacity, the smelter delivers ~$0.47/lb. in cost savings At full capacity, smelter fixed costs will be spread over a higher production volume Cash Cost (C1) waterfall between H2 2025 and YTD 2026 (US$/lb.)

Slide 16: Kamoa-Kakula Diesel Impact on Cash Cost (C1)
KAMOA-KAKULA DIESEL IMPACT ON CASH COST (C1) $0.16/lb. quarterly increase in cash cost (C1), 2026 Cash Cost (C1) Guidance vs. of which $0.09/lb. from higher diesel prices 2027 & 2028 onwards ($/lb.) On-site 60 MW significantly reduces diesel $3.00 $3.00 consumption, generating savings of $0.10 - $0.

Slide 17: Sulphuric Acid Sales Benefiting from High Prices
SULPHURIC ACID SALES BENEFITING FROM HIGH PRICES Production rates of high-strength sulphuric acid from Kamoa-Kakula smelter averaging 40,000 tonnes per month; 60% capacity on 700kt per annum Sulphuric acid & sulphur market remains tight in DRC due to reduced supply of sulphur passing through the Str

Slide 18: Increasing Diversification of Power Sources
INCREASING DIVERSIFICATION OF POWER SOURCES Dec 25 Dec 26 Dec 27 Dec 28 INCREASING RENEWABLE GENERATION SNEL (national grid) MW 110 180 210 210 178 MW of refurbishment hydropower from Turbine #5 Inga II completed Third party purchases MW 100 100 100 40 60 MW of on-site solar from Q3 2026, (Imports)

Slide 19: Western Forelands Exploration Project
WESTERN FORELANDS EXPLORATION PROJECT The next great copper frontier… 19

Slide 20: Western Forelands Overview
WESTERN FORELANDS OVERVIEW Same underlying geology as licence area; Kamoa-Kakula ~5x larger than Kamoa-Kakula’s mining rights Western Forelands’ licences majority owned by Ivanhoe Mines; maximum ownership 80%, with 20% DRC / local Over 55 million tonnes of copper discovered by Ivanhoe geologists sin

Slide 21: The Most Important Sedimentary-Hosted Copper Basin
THE MOST IMPORTANT SEDIMENTARY-HOSTED COPPER BASIN The largest copper system discovered of the past 30+ years, with over 55 million tonnes of copper discovered by Ivanhoe geologists since 2008 Top 50 largest copper deposits globally (bubbles sized by 2025 production rate) 3.5% Kakula Kamoa Discovery

Slide 22: Largest & Highest-Grade Copper Discovery of Past Decade
LARGEST & HIGHEST-GRADE COPPER DISCOVERY OF PAST DECADE 2026 Mineral Resource update increases contained copper by 30% Top-10 Copper Discoveries of the Past Decade 14.0 3.00% 2018 Contained Copper Resources (Mt) Contained, M&I Copper Grade in Resources (%) 12.0 Contained, Inferred 2.50% 10.0 Grade,

Slide 23: Makoko Continues to Prove Its Exceptional Prospectivity
MAKOKO CONTINUES TO PROVE ITS EXCEPTIONAL PROSPECTIVITY +245% in contained copper; +78% increase in copper price greatly increases Makoko’s value $8,167 / t 78% increase in copper price $14,530 / t Nov 3, 2023 Sept 7, 2026 14 2026 (3) Exploration meters drilled (km) 12 400 Copper Endowment (Mt) 2025

Slide 24: Copper Projects Are Increasingly Difficult to Find
COPPER PROJECTS ARE INCREASINGLY DIFFICULT TO FIND The rate of copper discoveries has been declining over the past 30 years; Ivanhoe Mines has consistently been the world leader in major copper discoveries. 20 OYU TOLGOI Number of copper discoveries made per year 17 15 KAMOA 13 12 12 12 11 MAKOKO &

Slide 25: Western Forelands Growth Story Continues
2024 WORK WESTERN PLAN FORELANDS GROWTH STORY CONTINUES… 60,000 metres of drilling not included in the 2026 Mineral Resource estimate 43,000-metre drill program planned for Makoko growth drilling across Western Forelands in 2027 3 Three focus areas: Testing thick, +3% Cu zone down dip 2 1 of Makoko

Slide 26: Major, Phased Infill Drill Campaign Planned
MAJOR, PHASED INFILL DRILL CAMPAIGN PLANNED 63,000 metres planned focusing on shallow sub Phase 1a Phase 2a cropping mineralization Phase 2b Phase 3 <200m depth potentially Phase 1b amenable to open pit mining 106,000 metres planned focusing on shallow high-grade <600m depth mineralization potential

Slide 27: Drilling Continues on New Horizons
DRILLING CONTINUES ON NEW HORIZONS North-Western Province Chu-Sarysu Basin JV Zambia (100%-owned) Kazakhstan (20%-owned)* Drill testing of geophysical targets 17,528 metres drilled through Q3 2026, of a progressing well in Q3 2026, with 5,961 40,000-metre programme metres completed Notable int

Slide 28: Kipushi
KIPUSHI World’s highest-grade, lowest-carbon major zinc mine Kipushi’s 800ktpa concentrator, with Shaft P5 in the background 28

Slide 29: Kipushi Set for a Record Year
KIPUSHI SET FOR A RECORD YEAR (Figures shown on 100% basis for Kipushi) Kipushi produced a record 77,147 tonnes of Ore tonnes milled (‘000’s tonnes) zinc in Q3 2026 / Zinc ore grade processed (%) 41.6% 37.8% 37.0% 38.7% 36.2% Kipushi milled 193,581 tonnes of ore in Q3 at a record average grade of 41

Slide 30: Kipushi Record EBITDA and Cost Discipline
KIPUSHI RECORD EBITDA AND COST DISCIPLINE (Figures shown on 100% basis for Kipushi, US$ million) EBITDA ($ million) / EBITDA Margin (%) Kipushi generated a record $255 million in 43% revenue and $108 million in EBITDA in Q3 at a 36% 35% margin of 43% 32% 21% Year-to-date operating cash flow of $155

Slide 31: Kipushi Taking Advantage of Zinc Market Tightness
KIPUSHI TAKING ADVANTAGE OF ZINC MARKET TIGHTNESS (Figures shown on 100% basis for Kipushi) Zinc price chart since first production, with actual and Zinc prices trading above 4-year forecast cash costs ($ per pound of payable zinc) highs, hovering near $1.65/lb. 2.00 First feed of Zinc Price on Nov

Slide 32: Platreef Mine
PLATREEF MINE The right time for the world’s best new producer of platinum, palladium, rhodium & gold 32

Slide 33: Platreef Platinum-Palladium-Nickel-Rhodium-Copper-Gold Mine
PLATREEF PLATINUM-PALLADIUM-NICKEL-RHODIUM-COPPER-GOLD MINE Multi-generational resource with significant exploration upside Set to be one of the largest and highest margin primary PGM mines PGM Diversified commodity basket of precious metals, nickel and copper Ni Cu Phase 1 ramping up; Phase 2 devel

Slide 34: Platreef: What Makes the Flatreef Orebody Unique?
PLATREEF: WHAT MAKES THE FLATREEF OREBODY UNIQUE? Platreef Underground Mine Khomanani Mine, Rustenburg Deposit Merensky Reef / UG2 Flatreef(1) Bushveld Location Western / Eastern Limb Northern Limb Underground: narrow-reef, manual, Underground: efficient mechanised, Mining Method labour intensive lo

Slide 35: Platreef: Optimized, Phased Plan for Phase 2 & 3
PLATREEF: OPTIMIZED, PHASED PLAN FOR PHASE 2 & 3 35

Slide 36: Platreef Advancing to Commercial Production
PLATREEF ADVANCING TO COMMERCIAL PRODUCTION Dry Stack TSF Solar Facility Shaft #2 Shaft #3 Shaft #3 is ramping up; expands hoisting Shaft #1 capacity to fully unlock the Phase 1 concentrator and future Phase 2 expansion Phase 1 Concentrator Phase 1 concentrator set to reach nameplate milling capacit

Slide 37: Platreef: Lowest Cost = Profit Through the Cycle
PLATREEF: LOWEST COST = PROFIT THROUGH THE CYCLE Global primary PGM producer total cash cost + sustaining capital curve Quartile 1 Quartile 2 Quartile 3 Quartile 4 2,000 Total cash cost + sustaining capital 1,750 1,500 ($ per oz of 3PE+Au) 1,250 1,000 750 10.7 Mtpa(2) 4.1 Mtpa (1) 500 Platreef Platr

Slide 38: Investment Highlights
29 Cu Three long-life, world-class Robust, experienced Committed support from key Strong balance sheet with 2026 production guidance mines with low costs, low management team with an partners CITIC, Zijin & QIA cash & cash equivalents of of ~290kt of salable capital intensity and established track r

Slide 39: Capital Expenditure Guidance
CAPITAL EXPENDITURE GUIDANCE (Figures shown on 100% basis, US$ millions) YTD 2026 2026 2027 Upper end of Kamoa-Kakula’s Capital Expenditure Actual Guidance Guidance 2026 capex guidance range Kamoa-Kakula lowered by $200m and deferred to 2027 Expansion capital(1,3) 413 600 – 675 500 – 650 Sustaining

Slide 40: Strong Treasury and Liquidity Maintained
STRONG TREASURY AND LIQUIDITY MAINTAINED Figures as at September 30, 2026; all values in US$ million Ivanhoe Mines Ivanhoe Mines Pro-Rata Net Debt to Cash and cash equivalents Pro-rata net debt Adj. EBITDA (TTM) $1,691 $1,474 2.48x 2.26x $635 $643 Q2 2026 Q3 2026 Q2 2026 Q3 2026 Q2 2026 Q3 2026 $750

Slide 41: World-Class Mineral Resource Base Intact
WORLD-CLASS MINERAL RESOURCE BASE INTACT Kamoa-Kakula Remains a World Class Copper Deposit1 Contained Copper in Mineral Resources (Mt) 150 M&I Cont. Cu 3.0% 36.8 33.8 2024 2025 Inf. Cont. Cu 125 2.5% Contained Copper (Mt) M&I Grade Copper Grade (%) Inf. Grade 100 2.0% 75 1.5% 50 1.0% 5.2 6.1 25 0.5%

Slide 42: Mineral Reserve Reconciliation
MINERAL RESERVE RECONCILIATION Figures for Kamoa-Kakula shown on 100%-basis Removal of old Kakula Mine from Mineral Reserve; of which some is 20 1a 1 excluded as Mature Extraction Zone Cont. Copper in Reserves (Mt) 1b 1.9 2 (a); some is reclassified to Inferred (b) 15 0.9 5 4.4 3 4 Increased pillar

Slide 43: "Resetting" Kakula 2.0 Mine Strategy
“RESETTING” KAKULA 2.0 MINE STRATEGY Outline of area LEGEND reclassified to Inferred 8% copper stope Stoping Develop safe long-term access Resource classification blocks 5% copper stope around the orebody periphery Kakula North 3% copper stope Portal 2% copper stope 1.5% copper stope Stability pilla

Slide 44: Appendix I: Technical Information
APPENDIX I: Technical Information APPENDIX III: Mineral Reserves The scientific and technical information contained in this presentation has been reviewed and approved by by Steve Amos, BSc Category Tonnage (Mt Ore) Copper Grade (%) Cont. Copper (Mt Cu) (Hons), MSc (Eng), FSAIMM (703500) and Simon
Source: company website
More decks from Ivanhoe Mines Ltd. Class A
Q3 2026 Earnings Presentation39 slides · Nov 4, 2026
Investor Presentation (October 2026)45 slides · Oct 16, 2026
Investor Presentation (September 2026)45 slides · Sep 21, 2026
Q2 2026 Earnings Presentation31 slides · Jul 30, 2026
Q1 2026 Earnings Presentation29 slides · May 7, 2026
Q1 2026 Earnings Presentation46 slides · May 6, 2026