NorthWestern Energy Group, Inc. · NASDAQ:NWE
NorthWestern Energy — Technical Presentation (January 2021)
118 slides from NorthWestern Energy's technical presentation, Jan 6, 2021
Slide 1: Thompson Falls Hydroelectric Project Proposed Study Plan Meeting
Thompson Falls Hydroelectric Project No. 1869 Proposed Study Plan Meeting January 6, 2021
Slide 2: Guidelines for Today's Zoom Meeting
Guidelines for Today’s Zoom Meeting • Video and Audio: Keep OFF, unless you are speaking as a presenter or called on to ask a question. • Phone controls for participants – *6 – to toggle mute/unmute. • Asking a Question: During the Q&A – click on the “Chat” icon and type your question or click on th
Slide 3: Schedule
Schedule Evening Meeting January 6, 2021 Start Time Topic 6:00 PM Introduction and Zoom Tips, FERC Process 6:15 PM Operations Study Tailrace Fish Behavior and Hydraulic Conditions 6:45 PM Studies 6:55 PM Downstream Transport of Bull Trout & Westslope Cutthroat Trout Genetics Studies 7:15 PM Water Qu
Slide 4: Introductions
Introductions • Introductions • NorthWestern representatives and consultants representing engineering, operations, legal, hydro license compliance (including biologists, water quality experts and cultural, land and recreation specialists) • FERC representatives • We will be recording attendance and
Slide 5: Thompson Falls Hydroelectric Project
Thompson Falls Hydroelectric Project
Slide 6: Licensed by the Federal Energy Regulatory Commission (FERC)
Licensed by the Federal Energy Regulatory Commission (FERC) 1938 – Original License 1979 – License was renewed for 40 years 1990 – Major Modification to the License for additional powerhouse 2025 – License expires
Slide 7: ILP Process and Opportunity for Input: Completed Steps
ILP Process and Opportunity for Input Date Completed Relicensing Steps Jul 1, 2020 NorthWestern filed PAD/NOI Aug 28, 2020 FERC issued notice the relicensing is commencing and SD1 Oct 27, 2020 Comments on the PAD/SD1 and study requests were due (*) Dec 9, 2020 FERC issued SD2 Dec 11, 2020 NorthWeste
Slide 8: ILP Process and Opportunity for Input: Future Steps
ILP Process and Opportunity for Input Date Future Relicensing Steps Mar 11, 2021 Comments on the PSP are due to FERC Apr 12, 2021 NorthWestern files Revised Study Plan (RSP) Apr 27, 2021 Comments on the RSP due to FERC May 12, 2021 FERC Study Plan Determination (*) NorthWestern conducts first season
Slide 9: Study Plan Meeting Purpose
Study Plan Meeting Purpose NorthWestern Energy’s Proposed Studies Studies will provide the information on potential effects of the project which FERC needs to complete its Environmental Assessment and to make an informed decision on the License Application.
Slide 10: Proposed Study 1 – Operations Study
Proposed Study 1 – Operations Study
Slide 11: Operations Study Background
Proposed Study 1 – Operations Study Background • Flexible Capacity • Required to maintain grid stability by balancing electrical inputs and outputs on our system. • Load (consumption) changes throughout the day and seasons. • Generation changes dynamically due to intermittent resources and plant ava
Slide 12: Variable Generation
Proposed Study 1 – Operations Study Variable Generation
Slide 13: Operations Study Goals
Proposed Study 1 – Operations Study Study Goals Operations Study Goals Are Twofold: 1. Validate and quantify flexible capacity capability and benefits of the plant under multiple operational scenarios. 2. Evaluate the effects of flexible capacity operations and possible impacts on project resources.
Slide 14: Summary of 2019 Operations Test
Proposed Study 1 – Operations Study Summary of 2019 Operations Test • Operations Test was conducted in October of 2019. • Test was a single operation event increasing generation to maximum plant output and maintaining maximum plant output until the top 4 feet of reservoir volume was utilized. • Test
Slide 15: Study Objectives and Description
Proposed Study 1 – Operations Study Study Objectives and Description • Study Objectives • To simulate operational scenarios of flexible capacity at the project to determine plant generation outputs, rate, and degree of reservoir elevation changes. • Study Description • This study will simulate opera
Slide 16: Methods
Proposed Study 1 – Operations Study Methods • Test will be conducted in three separate phases • Phase 1 – low flexible capacity (20 MW) • Phase 2 – moderate flexible capacity (40 MW) • Phase 3 – maximum flexible capacity (max available) • Each phase will be 7 days long. • Minimum of 2 weeks break wi
Slide 17: Example Reservoir Elevations
Proposed Study 1 – Operations Study Example Reservoir Elevations Example of potential reservoir elevations during Phase 1
Slide 18: Resources to be Evaluated
Proposed Study 1 – Operations Study Resources to be Evaluated • Resource areas to be evaluated • Operations • Shoreline Stability • Fisheries • Recreation & Aesthetics • Public Safety • Water Quality • Wetland/Riparian Habitats • Cultural Resources
Slide 19: Objectives
Proposed Study 1 – Operations Study Objectives • Operations • Simulate flexible capacity scenarios to determine plant generation outputs, rate, and degree of reservoir elevation changes. • Shoreline Stability • Determine effects of operations on shoreline stability around the reservoir. • Fisheries
Slide 20: Objectives (cont.)
Proposed Study 1 – Operations Study Objectives (cont.) • Public Safety • Determine potential effects of project operations on public safety including changing water levels in the reservoir and below the powerhouse. • Water Quality • Evaluate any potential changes in water quality related to the proj
Slide 21: Shoreline Stability Study Area
Proposed Study 1 – Operations Study Shoreline Stability Study Area • Study includes shorelines extending from the dams upstream to the mouth of the Thompson River. • Includes the majority of developed lands in the project boundary. • Shorelines and embankments upstream of Thompson River and downstre
Slide 22: Shoreline Stability Study Methods
Proposed Study 1 – Operations Study Shoreline Stability Study Methods • Nine established reference points representing a diversity of soil types, slope, aspect, vegetation, and land use. • Visual observations made on a 300-foot reach at each reference point during each site visit during the study. •
Slide 23: Fisheries Study Area
Proposed Study 1 – Operations Study Fisheries Study Area • Fish Stranding: Exposed islands and shoreline habitats in Thompson Falls Reservoir below Cherry Creek and near the islands above Thompson River. • Habitat condition observations at the mouth of the Thompson River and Cherry Creek. • Conditio
Slide 24: Fisheries Study Methods
Proposed Study 1 – Operations Study Fisheries Study Methods • Establish 200-foot transects in shallow habitats less than 2.5 feet deep at full pool (fluctuation zone). • Three transects on exposed mid-channel island areas and three transects along exposed shoreline habitats below Cherry Creek and ne
Slide 25: Recreation & Aesthetics Study Area
Proposed Study 1 – Operations Study Recreation & Aesthetics Study Area • Focus on shoreline facilities from the dam upstream to the mouth of the Thompson River and Sandy Beach dispersed recreation site.
Slide 26: Recreation & Aesthetics Study Methods
Proposed Study 1 – Operations Study Recreation & Aesthetics Study Methods • Reference points established at boat launches, docks, and public viewing areas. • Reservoir divided into four sections to identify subset of 40 representative docks: • Boat barrier upstream to Steamboat Island • Steamboat Is
Slide 27: Public Safety
Proposed Study 1 – Operations Study Public Safety • Study Area • Sandy Beach dispersed recreation site below original powerhouse. • High traffic areas in Thompson Falls Reservoir. • Methods • Monitoring and observation of shallow water areas during static hold times for each Phase. • Assess the publ
Slide 28: Water Quality Study Area
Proposed Study 1 – Operations Study Water Quality Study Area • Water Quality Instruments • Water level (stage) recorders • Upstream of Dry Channel Dam • Islands above Thompson River • Birdland Bay Bridge • Mouth of Thompson River • Downstream of Powerhouses
Slide 29: Water Quality Study Methods
Proposed Study 1 – Operations Study Water Quality Study Methods • Water level recorders will be set to record water stage on 5-minute intervals to evaluate reservoir elevation change throughout the project. • Instruments will be deployed and programed to record water quality parameters every 15 minu
Slide 30: Wetland/Riparian Habitats Study Area
Proposed Study 1 – Operations Study Wetland/Riparian Habitats Study Area • In Thompson Falls Reservoir focusing on known wetland habitats near Steamboat Island and upstream of the Thompson River. • Wetlands identified using Montana Spatial Data Infrastructure Wetlands Framework.
Slide 31: Wetland/Riparian Habitats Study Methods
Proposed Study 1 – Operations Study Wetland/Riparian Habitats Study Methods • Measurement of changes in water level with level loggers and/or piezometers. • Visual observations of identified Wetland and Riparian areas. • Risk to each wetland and riparian area ranked as high, medium, or low by evalua
Slide 32: Cultural
Proposed Study 1 – Operations Study Cultural • Study area consists of the locations of known archaeological properties at or near the reservoir high water line. • 3 known properties • Salish House • Prehistoric and historic artifact scatter • Chinese railroad encampment • Methods • Effects of reserv
Slide 33: Schedule
Proposed Study 1 – Operations Study Schedule • Preparatory work prior to the FERC Study Plan Determination • Identifying baseline conditions • Establishing reference points • Identifying sampling sites • Preparing maps • First Study Season • All three phases will be scheduled when inflows are below
Slide 34: Reporting
Proposed Study 1 – Operations Study Reporting • NorthWestern will develop a Final Study Report which will include: • Data summaries • Assessments of observations • Photo documentation • Conclusions from resource evaluations • Data compilation, analysis, and drafting of report will take place after P
Slide 35: Any Questions?
Any Questions? • Guidelines for Asking a Question • Click on the “Chat” icon and type your question; once recognized, please unmute yourself, introduce yourself, and ask your question. • Click on the “Raise Your Hand” icon to be recognized; once recognized, please unmute yourself, introduce yourself
Slide 36: Proposed Study 4 – Hydraulic Conditions
Proposed Study 4 – Hydraulic Conditions
Slide 37: Study Description
Proposed Study 4 – Hydraulic Conditions Study Description • A scientific review panel recommended a hydraulics study in the near field downstream of the project and a fish behavior study. • Flow modeling results will be compared to fish behavior data to provide information on effectiveness of passag
Slide 38: Study Area
Proposed Study 4 – Hydraulic Conditions Study Area • Combine a bathymetric survey and available LiDAR data to develop a digital elevation model from the Main Channel Dam downstream to the High Bridge.
Slide 39: Methods – Two-Phased Approach
Proposed Study 4 – Hydraulic Conditions Methods – Two-Phased Approach Phase 1: 2D simulation to provide overview of hydraulics and a wider range of flow rates. • Overview of river channel hydraulics to identify areas to focus and refine modeling • Up to 4 flow rate simulations • Flow depth and depth
Slide 40: Methods – Two-Phased Approach (cont.)
Proposed Study 4 – Hydraulic Conditions Methods - Two-Phased Approach (cont.) Phase 2: 3D simulation at key identified flow rates and locations based on 2D findings. • Further refine model in key areas such as fish passage entrance and falls area. • 2 flow rate simulations. • Flow depth, vertical ve
Slide 41: Schedule
Proposed Study 4 – Hydraulic Conditions Schedule 41
Slide 42: Proposed Study 5 – Fish Behavior
Proposed Study 5 – Fish Behavior
Slide 43: Goals & Objectives
Proposed Study 5 – Fish Behavior Goals & Objectives • Evaluate fish movement through the Zone of Passage (ZOP). • Assess the effectiveness of upstream fish passage and residual Project influences. • The scientific review panel recommended a fish behavior study using radio telemetry to evaluate fish
Slide 44: Study Description
Proposed Study 5 – Fish Behavior Study Description • The telemetry monitoring efforts will focus on assessing fish movement, including • Travel time from the far field to the near field. • Movement patterns (e.g., left bank, right bank) in the near field (Main Channel Dam area). • Travel time from t
Slide 45: Study Area
Proposed Study 5 – Fish Behavior Study Area
Slide 46: Study Area (ZOP)
Proposed Study 5 – Fish Behavior Study Area (ZOP)
Slide 47: Methods
Proposed Study 5 – Fish Behavior Methods • Radio and PIT tag 50 Brown Trout and 50 Rainbow Trout captured from Thompson River. • Depth and activity tag sensors. • Assumed some level of upstream motivation. • Information for these species and as a surrogate for Bull Trout.
Slide 48: Methods (cont.)
Proposed Study 5 – Fish Behavior Methods (cont.) Release radio tagged fish at Flat Iron boat launch (4 miles downstream).
Slide 49: Methods – Fixed Receiver System
Proposed Study 5 – Fish Behavior Methods – Fixed Receiver System 49
Slide 50: Methods
Proposed Study 5 – Fish Behavior Methods • Combining the behavioral data and hydraulic modeling data to help identify potential project influences (e.g., velocity fields) in the near field that may affect conditions for upstream fish passage. • Complete a literature review of the relative swimming c
Slide 51: Schedule
Proposed Study 5 – Fish Behavior Schedule Brown Trout movement Rainbow Trout movement
Slide 52: Any Questions?
Any Questions? • Guidelines for Asking a Question • Click on the “Chat” icon and type your question; once recognized, please unmute yourself, introduce yourself, and ask your question. • Click on the “Raise Your Hand” icon to be recognized; once recognized, please unmute yourself, introduce yourself
Slide 53: Proposed Study 6 – Downstream Transport of Bull Trout
Proposed Study 6 – Downstream Transport of Bull Trout
Slide 54: Goals & Objectives
Proposed Study 6 – Downstream Transport of Bull Trout Goals & Objectives • Evaluate the feasibility of collecting and transporting juvenile Bull Trout from Thompson River tributaries to Lake Pend Oreille. • Determine the most efficient and effective capture methods, location, and seasonal timing of
Slide 55: Study Description
Proposed Study 6 – Downstream Transport of Bull Trout Study Description • Outmigrating juvenile Bull Trout from Thompson River may reside in Noxon Rapids Reservoir. As adults, they can migrate upstream to their natal stream using the fish passage facility at Thompson Falls Dam. • Alternatively, they
Slide 56: Study Area
Proposed Study 6 – Downstream Transport of Bull Trout Study Area 56
Slide 57: Methods
Proposed Study 6 – Downstream Transport of Bull Trout Methods • Electrofish and picket weir traps operated during October and November. • Lower sections of Fishtrap and West Fork Thompson River. • PIT tag up to 200 Bull Trout, 120- 250mm and transport 75% downstream to Lake Pend Oreille, release 25%
Slide 58: Schedule
Proposed Study 6 – Downstream Transport of Bull Trout Schedule
Slide 59: Any Questions?
Any Questions? • Guidelines for Asking a Question • Click on the “Chat” icon and type your question; once recognized, please unmute yourself, introduce yourself, and ask your question. • Click on the “Raise Your Hand” icon to be recognized; once recognized, please unmute yourself, introduce yourself
Slide 60: Proposed Study 9 – Westslope Cutthroat Trout Genetics Study
Proposed Study 9- Westslope Cutthroat Trout Genetics Study
Slide 61: Goals & Objectives
Proposed Study 9 – Westslope Cutthroat Trout Genetics Study Goals & Objectives • Standardize approach to phenotypically identify Westslope Cutthroat Trout (WCT) and hybrids captured at passage facility. • Take a genetic sample for WCT and hybrids to determine level of purity or hybridization of indi
Slide 62: Study Description
Proposed Study 9 – Westslope Cutthroat Trout Genetics Study Study Description • Mainstem dams have fragmented habitats and WCT populations. • Since 2011 over 2,000 WCT, Rainbow Trout, and hybrids have been passed at upstream fish passage facility. • Can we correctly identify WCT or hybrids captured
Slide 63: Study Area
Proposed Study 9 – Westslope Cutthroat Trout Genetics Study Study Area
Slide 64: Methods
Proposed Study 9 – Westslope Cutthroat Trout Genetics Study Methods • Develop standardized phenotypic approach to identify WCT at the upstream passage facility. • Use photographs of pure WCT as guides. • Slash intensity, body spotting, anal fin spotting, and coloration as key characteristics.
Slide 65: Methods
Proposed Study 9 – Westslope Cutthroat Trout Genetics Study Methods • Genetic sample from WCT and hybrids to determine levels of hybridization and accuracy of observer identification. • Range of 14 - 48 visually identified WCT captured at the facility per year.
Slide 66: Study Schedule
Proposed Study 9 – Westslope Cutthroat Trout Genetics Study Study Schedule • March-October 2021 - Collections at upstream fish passageway • October 2021 - February 2022 - Laboratory analysis • May 2022 - Final report
Slide 67: Any Questions?
Any Questions? • Guidelines for Asking a Question • Click on the “Chat” icon and type your question; once recognized, please unmute yourself, introduce yourself, and ask your question. • Click on the “Raise Your Hand” icon to be recognized; once recognized, please unmute yourself, introduce yourself
Slide 68: Proposed Study 2 – Total Dissolved Gas
Proposed Study 2 – Total Dissolved Gas
Slide 69: Purpose
Proposed Study 2 – Total Dissolved Gas (TDG) Purpose • Purpose of the Study: • Collect background (incoming) TDG concentrations in the Clark Fork River upstream of the dams. • Collect downstream (outgoing) TDG concentrations in the Clark Fork River below the main dam and at Birdland Bay Bridge. • TD
Slide 70: Slide 70
Slide 71: Study Area & Description
Proposed Study 2 – Total Dissolved Gas (TDG) Study Area & Description • TDG is measured in three locations: • Above the powerhouse • Below the main dam • Birdland Bay Bridge • Hydrolab instruments provide dissolved gas readings at 30-minute intervals.
Slide 72: nnel Dam
. 7 nnel Dam Main Cha ui ] a 4 J pry Channel Dam a iz =: ie Old Powerhouse : r be fs :.% 5 ~” , a - 43 ~ Birdland Bay Bridge
Slide 73: Thompson Falls Total Dissolved Gas Concentrations (TDG)
Total Dissolved Gas Concentration % Thompson Falls Total Dissolved Gas Concentrations (TDG) 140% 100000 130% |} 120% 110% | 100% |} } 70000 90% | 80% | } Total How (cts) 70% | + 50000 © Below Main 0am i @ Birdland Bay Bridge 60% | | apo00 ®@ Above Dam sox | | 30000 0% | 30% | } } 20000 20% | } 10000
Slide 74: Schedule
Proposed Study 2 – Total Dissolved Gas (TDG) Schedule • Deploy monitoring equipment in April 2021. • Conduct monitoring and bi-weekly maintenance on equipment through July 2021. • Analyze data collected and prepare summary report for May 2022. • Conduct additional monitoring in 2022 for a final repo
Slide 75: Proposed Study 3 – Water Quality
Proposed Study 3 – Water Quality
Slide 76: Goals & Objectives
Proposed Study 3 – Water Quality Goals & Objectives • The purpose of this study is to collect water quality data to characterize the existing water quality conditions at the Thompson Falls Hydroelectric Project. • Data from this study will supplement water quality data collected in 2019 and 2020. •
Slide 77: Study Area
Proposed Study 3 – Water Quality Study Area
Slide 78: Methods
Proposed Study 3 – Water Quality Methods • Water quality samples consist of a depth-integrated sample, and where possible, width-integrated sample. • Several samples are collected at each site and composited into one representative sample for the site. • Each sample is analyzed for nutrients, metals
Slide 79: Slide 79
Slide 80: Schedule
Proposed Study 3 – Water Quality Schedule • Conduct quarterly water chemistry monitoring in March, June, September, and December 2021. • Analyze data collected and prepare summary report for May 2022. • Conduct additional quarterly monitoring in 2022 for a final report in May 2023.
Slide 81: Any Questions?
Any Questions? • Guidelines for Asking a Question • Click on the “Chat” icon and type your question; once recognized, please unmute yourself, introduce yourself, and ask your question. • Click on the “Raise Your Hand” icon to be recognized; once recognized, please unmute yourself, introduce yourself
Slide 82: Proposed Study 7 – Visitor Survey
Proposed Study 7 – Visitor Survey
Slide 83: Goals & Objectives
Proposed Study 7 – Visitor Survey Goals & Objectives • A recreation visitor survey is proposed in the Project area from Memorial Day weekend through Labor Day weekend 2021 to obtain current information from recreationists about their use of recreation sites, facilities, and opportunities during the
Slide 84: Study Description
Proposed Study 7 – Visitor Survey Study Description Information will be sought regarding: Previous Site Use Recreation Activities at Site Current Site Use Problems Encountered at Site (if any) Reasons for Visiting Site Use of Trails and Satisfaction Opinions about Site Facilities Visitor Geographic
Slide 85: Cherry Creek Boat Launch
Proposed Study 7 – Visitor Survey Cherry Creek Boat Launch
Slide 86: North Shore Dispersed Use Area
Proposed Study 7 – Visitor Survey North Shore Dispersed Use Area
Slide 87: Wild Goose Landing Park
Proposed Study 7 – Visitor Survey Wild Goose Landing Park
Slide 88: North Shore Boat Restraint
Proposed Study 7 – Visitor Survey North Shore Boat Restraint
Slide 89: Island Park
Proposed Study 7 – Visitor Survey Island Park
Slide 90: South Shore Dispersed Recreation Area
Proposed Study 7 – Visitor Survey South Shore Dispersed Recreation Area
Slide 91: Power Park
Proposed Study 7 – Visitor Survey Power Park
Slide 92: Sandy Beach
Proposed Study 7 – Visitor Survey Sandy Beach
Slide 93: Powerhouse Loop Trail
Proposed Study 7 – Visitor Survey Powerhouse Loop Trail
Slide 94: Study Area
Proposed Study 7 – Visitor Survey Study Area Recreation sites associated with the Thompson Falls Project offer facilities and opportunities to participate in a variety of activities: •Picnic facilities •Boat ramps and launching docks •Facilities for visitor conveniences •Shoreline access •Trail-base
Slide 95: Proposed Study Plan 7 – Visitor Use Survey
Proposed Study Plan 7 – Visitor Use Survey
Slide 96: Proposed Study Plan 7 – Visitor Use Survey
Proposed Study Plan 7 – Visitor Use Survey
Slide 97: Proposed Study Plan 7 – Visitor Use Survey
Proposed Study Plan 7 – Visitor Use Survey
Slide 98: Proposed Study Plan 7 – Visitor Use Survey
Proposed Study Plan 7 – Visitor Use Survey
Slide 99: Proposed Study Plan 7 – Visitor Use Survey
Proposed Study Plan 7 – Visitor Use Survey
Slide 100: Proposed Study Plan 7 – Visitor Use Survey
Proposed Study Plan 7 – Visitor Use Survey
Slide 101: Proposed Study Plan 7 – Visitor Use Survey
Proposed Study Plan 7 – Visitor Use Survey
Slide 102: Proposed Study Plan 7 – Visitor Use Survey
Proposed Study Plan 7 – Visitor Use Survey
Slide 103: Proposed Study Plan 7 – Visitor Use Survey
Proposed Study Plan 7 – Visitor Use Survey
Slide 104: Proposed Study Plan 7 – Visitor Use Survey
Proposed Study Plan 7 – Visitor Use Survey
Slide 105: Proposed Study Plan 7 – Visitor Use Survey
Proposed Study Plan 7 – Visitor Use Survey
Slide 106: Proposed Study Plan 7 – Visitor Use Survey
Proposed Study Plan 7 – Visitor Use Survey
Slide 107: Proposed Study Plan 7 – Visitor Use Survey
Proposed Study Plan 7 – Visitor Use Survey
Slide 108: Methods & Schedule
Proposed Study 7 – Visitor Survey Methods & Schedule • 60 sampling days will be randomly selected during the sampling timeframe between May 28 and September 6, 2021. Sampling will be dispersed throughout the days of the week and hours of the day to arrive at a sampling schedule that is representativ
Slide 109: Any Questions?
Any Questions? • Guidelines for Asking a Question • Click on the “Chat” icon and type your question; once recognized, please unmute yourself, introduce yourself, and ask your question. • Click on the “Raise Your Hand” icon to be recognized; once recognized, please unmute yourself, introduce yourself
Slide 110: Proposed Study 8 – Cultural Resources Inventory, Evaluation, and Examination of Potential Effects
Proposed Study 8 – Cultural Resources Inventory, Evaluation, and Examination of Potential Effects
Slide 111: Cultural Resources Inventory and National Register Evaluation
Proposed Study 8 – Cultural Resources Cultural Resources Inventory and National Register Evaluation • Update inventory of Historic Architectural and Engineering Properties. • Develop high probability model for Prehistoric and Historic Archaeological Properties. • Field inventory identified high prob
Slide 112: Goals & Objectives
Proposed Study 8 – Cultural Resources Goals & Objectives • Collect and analyze baseline resource data to gauge any current and anticipated Project effects on cultural properties. • Develop Historic Properties Management Plan under new License.
Slide 113: Study Description
Proposed Study 8 – Cultural Resources Study Description • Update inventory and evaluation of historic architectural and engineering elements of Thompson Falls Hydroelectric Dam Historic District. • Expand record of known prehistoric and historic archaeological properties through systematic inventory
Slide 114: Methods
Proposed Study 8 – Cultural Resources Methods For Historic Architectural and Engineering Properties: • Re-Inventory Thompson Falls Hydroelectric Dam Historic District and update 1986 National Register of Historic Places listing.
Slide 115: Methods
Proposed Study 8 – Cultural Resources Methods For Previously-unknown Prehistoric and Historic Archaeological Properties • Develop and field test high probability model to predict where previously-unknown prehistoric and historic archaeological properties mostly likely exist within project. • Invento
Slide 116: Schedule
Proposed Study 8 – Cultural Resources Schedule Timing Activity May 2021–Feb 2022 Update inventory of Thompson Falls Hydroelectric Dam Historic District May–Sept 2021 Develop and refine high prehistoric and historic archaeological properties probability model; submit to reviewers Oct 2021 Review peri
Slide 117: Any Questions?
Any Questions? • Guidelines for Asking a Question • Click on the “Chat” icon and type your question; once recognized, please unmute yourself, introduce yourself, and ask your question. • Click on the “Raise Your Hand” icon to be recognized; once recognized, please unmute yourself, introduce yourself
Slide 118: Delivering a bright future
delivering a bright future
NorthWestern Energy — Technical Presentation (January 2021) on 6ix