Eve Health Group Limited · ASX:EVE

Eve Health — Energy Ventures — Australian Uranium Conference 2012

17 slides from Eve Health's conference presentation, Jul 18, 2012

  1. Slide 1: Clarifying Announcement

    LEVEL ONE 8COLINSTREET WEST PERTH WA 6005 For personal use only POBOX886 WEST PERTH WA 6872 TEL:+61 8 6465 5500 FAX:+61 8 6465 5599 ABN 89 106 523 611 18 July 2012 The Manager ASX Market Announcements ASX Limited Exchange Centre, 20 Bridge Street SYDNEY NSW 2000 via electronic lodgement CLARIFYI

  2. Slide 2: JORC Code and Competent Person statement

    The Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (the ‘JORC Code’) sets out minimum standards, recommendations and guidelines for Public Reporting in Australasia of Exploration Results, Mineral Resources and Ore Reserves. The information contained in thi

  3. Slide 3: Energy Ventures Ltd - Aurora Uranium Project, USA

    Energy Ventures Ltd For personal use only Aurora Uranium Project, USA Australian Uranium Conference, 18th July 2012

  4. Slide 4: Disclaimer

    Disclaimer For personal use only This presentation has been prepared by and issued by Energy Ventures Limited (“Energy Ventures”, “EVE” or the “Company”) to assist it in informing interested parties about the Company and its progress. It should not be considered as an offer or invitation to subscrib

  5. Slide 5: Company snapshot

    Company snapshot For personal use only Established ASX‐listed company with experienced management team. Focus is uranium projects in the USA. Key asset is the Aurora uranium project in southeast Oregon. Working towards feasibility study. Simultaneously advancing technical evaluation, environmental b

  6. Slide 6: Corporate structure & management

    Corporate structure & management For personal use only Capital Structure (ASX:EVE) Board of Directors Ordinary Shares: 384,274,425 Alasdair Cooke, Executive Chairman Options: 7,650,000 Lachlan Reynolds, Managing Director Market Cap: A$7.5 million Bill Fry, Executive Director Cash & Liquid assets: A$

  7. Slide 7: USA strategic advantages

    USA strategic advantages For personal use only 104 operational nuclear reactors, capacity 100 GWe, ~20% of the US energy supply. US EIA forecast 11% increase in nuclear power generation by 2035, including 10 GWe new capacity and additional reactor uprates. Huge federal loan guarantees, increased R&D

  8. Slide 8: Aurora project location

    Aurora project location For personal use only Australian Uranium Conference July 2012

  9. Slide 9: Aurora uranium project

    Aurora uranium project For personal use only Volcanic hosted uranium deposit in southeast Oregon, USA. Discovered 1979, more than 550 drill holes completed. Well defined resource base of 38 Mlb U3O8 at 248 ppm eU3O8 Higher grade zone of 18 Mlb at 444 ppm eU3O8 Near surface, flat‐lying geometry amena

  10. Slide 10: Local access and infrastructure

    Local access and infrastructure For personal use only Company base at McDermitt, NV. Strong local relationships. Excellent infrastructure. 272 federal lode claims (unpatented). ~1,000 acres development area. Historical mining area. Mainly federal lands administered by BLM, some State land. Australia

  11. Slide 11: Project overview

    Project overview For personal use only Australian Uranium Conference July 2012

  12. Slide 12: Long section and geology

    Long section and geology For personal use only Australian Uranium Conference July 2012

  13. Slide 13: Drilling status

    Drilling status For personal use only 32 diamond drill holes completed for >3,000 m PQ drilling. Uranium grades and continuity confirmed. Near surface mineralisation in flat‐lying zones amenable to open pit mine. Significant widths suggest potential for low stripping ratios. Representative samples c

  14. Slide 14: Proposed development

    Proposed development For personal use only Conventional open pit mine: Preliminary design in progress On‐site processing plant: ~2 Mlb/a U3O8 production Tailings impoundment: Staged valley fill design Progressive reclamation Existing infrastructure simplifies access. 8 – 12 years project life. Recla

  15. Slide 15: Project development status

    Project development status For personal use only Diamond drilling program has confirmed resource grade and continuity, and provided new metallurgical samples. Resource update in progress, incorporating recent EVE diamond drilling and recently acquired historical data (>100 drill holes). Preliminary

  16. Slide 16: Aurora project outlook

    Aurora project outlook For personal use only Favourable operating environment. Low cost mining possible due to soft sedimentary rock overburden and low stripping ratio. Simple ore scrubbing beneficiation process to upgrade mineralisation. Expectation of low crushing and grinding costs, with majority

  17. Slide 17: Thank-you

    For personal use only Thank‐you For more information, please visit www.energyventures.com.au

Energy Ventures — Australian Uranium Conference 2012 on 6ix