Synergia Energy Ltd · LSE:SYN

Synergia Energy — Oilex — Investor Presentation (July 2012)

37 slides from Synergia Energy's investor presentation, July 2012

  1. Slide 1: Investor Presentation July 2012

    Investor Presentation July 2012

  2. Slide 2: Disclaimer

    DISCLAIMER The presentation in this projected form and as verbally presented (Presentation) is provided on the basis that none of the Company nor its respective officers, shareholders, related bodies corporate, partners, affiliates, employees, representatives and advisers make any representation or

  3. Slide 3: Contents

    CONTENTS  Investment Proposition  Cambay Current Status  Cambay Forward Plan  Exploration  Conclusion Appendices Cambay-76H work over rig operations 3

  4. Slide 4: Investment Proposition

    OILEX LTO INVESTMENT PROPOSITION

  5. Slide 5: Company Overview

    COMPANY OVERVIEW Oilex Ltd  Listed on AIM and ASX  Flagship project is the Cambay Project onshore Gujarat, India  45% interest and Operator  Partner - Gujarat State Petroleum Corporation Ltd  Transferring US “shale gas” technology to large tight reservoirs  Attractive exploration target offsho

  6. Slide 6: Cambay Tight Reservoir Project Summary

    CAMBAY TIGHT RESERVOIR PROJECT SUMMARY  Large acreage position ~40,000 acres SUBSTANTIAL  Independent assessment by Netherland Sewell & Associates Inc. (Oct 2011) RESOURCE  222 BCF gas and 37 MMbbl oil Unrisked Contingent Resources (2C net OEX)  Substantial prospective resource upside in deeper

  7. Slide 7: Market and Infrastructure

    MARKET AND INFRASTRUCTURE Gujarat - Oil and Gas Hub of India India’s Natural Gas Deficit Cambay Project  Indian gas market is one of the fastest growing in the world Source: international Energy Agency  Gas demand to increase at 5.4% per annum over  1,400km integrated gas grid operated on an open

  8. Slide 8: Cambay Project

    CAMBAY PROJECT NSAI Independent Resource Assessment Unrisked Contingent Resources (Net OEX 45%) 1C 2C 3C Natural Gas (BCF) 80 222 482 Oil (MMbbls) 14 37 80 Unrisked Prospective Resources (Net OEX 45%) Low Best High Natural Gas (BCF) 116 420 1,634 Oil (MMbbls) 16 63 248  Assessment based on extensiv

  9. Slide 9: Cambay Project stratigraphic subdivision

    CAMBAY PROJECT Stratigraphic Subdivision  Well tests from vertical wells confirm productivity of X + Y zones  Limited well intersections in prospective resources zones– substantial upside to be evaluated C‐20 5.20 km C‐40 C‐76H Depth m msl Top X Contingent Top Y Resources Top Z NSAI 180-200 Top 18

  10. Slide 10: Cambay Current Status

    CAMBAY CURRENT STATUS DRILLING COMPLETION STIMULATION OPERATIONS WELL RESULTS

  11. Slide 11: Cambay-76H Well

    CAMBAY-76H WELL Tight Reservoir Technology Transfer  Long reach horizontal well with large scale fracture stimulation - first in India  Applied modern North American technologies (SBM, LWD, rotary steerable system)  Drilled, completed and stimulated successfully in 37 days  All 8 stimulation sta

  12. Slide 12: Cambay-76H Well: Formation Over Pressure

    CAMBAY-76H WELL Formation Over Pressure  Unexpected abnormal overpressure C76H Formation Pressure Uncertainty experienced Drilling Mud Weight  High pressure is normally advantageous for tight reservoir exploitation Injection Tests  Milling operations disrupted – well Well Control Operations succe

  13. Slide 13: Cambay-76H Well: Operational Issues

    CAMBAY-76H WELL Operational Issues  Coil tubing milling assembly stuck  Down hole obstructions required milling  Operations suspended while fishing equipment manufactured and mobilised  Well control issues - gas flared  Drill pipe integrity issues  Value proposition intact 13

  14. Slide 14: Cambay-76H Well: Positive Well Results to Date

    CAMBAY-76H WELL Positive Well Results to Date  Hydrocarbons flow to surface  Sustained formation over-pressure  Micro-seismic interpretation  Stimulated rock volume comparable to North American tight reservoir analogues  Target fracture lengths (av. ~112m) achieved  Revised production models i

  15. Slide 15: Cambay-73 Y Zone Production and Flow Data

    CAMBAY-73 Y Zone Production and Flow Data  Vertical well drilled and completed in 2008  Small scale fracture stimulation (86 tonnes)  10 metres active perforations in Y Zone  Geologically representative of Cambay-76H section  Liquids rich gas composition  Flow back, production and test started

  16. Slide 16: Cambay Forward Plan

    CAMBAY FORWARD PLAN OFFSET WELL APPRAISAL & DEVELOPMENT OPERATIONAL CAPABILITY

  17. Slide 17: Offset Well

    OFFSET WELL Offset Well  Propose to drill into Cambay-76H stimulated rock volume C76H New  Production test Horizontal  Technical well design studies using identified North American drilling experts  Comprehensive subsurface analysis of Access to Stimulated offset well test results – integrate wi

  18. Slide 18: Cambay Project Indicative Forward Work Programme

    CAMBAY PROJECT Indicative Forward Work Programme D Location  Pilot development project • Vertical Pilot + Horizontal • Core and log data to correlate C76H production test for early production and • Optimised well + completion design • Book X + Y zone reserves + early production potential cash flow

  19. Slide 19: Cambay Project Indicative Project Schedule

    CAMBAY PROJECT Indicative Project Schedule  Propose to drill Offset Well, 3 vertical + 2 horizontal wells in the next 18 – 24 months 2012 2013 Production Offset Well test result Vertical Wells D, G, A wells Core & Log Analysis Book contingent resources Horizontal Wells (D + G) D, G wells Production

  20. Slide 20: Exploration

    EXPLORATION TIMOR SEA JPDA PROSPECT

  21. Slide 21: Timor Sea Exploration

    TIMOR SEA EXPLORATION Joint Petroleum Development Area JPDA 06‐103 Oilex:10%, Operator  2 prospects identified  Bazartete prospect  70.8 million barrels of oil Mean Prospective Resources (unrisked 100% basis)  23% chance of success. Key risk - charge  Discussions for exploration well and rig sl

  22. Slide 22: Timor Sea Exploration: PSDM Interpretation

    TIMOR SEA EXPLORATION Joint Petroleum Development Area  Recent PSDM processing provided breakthrough in upgrading Bazartete structure PSDM Interpretation Bazartete Map Area 73 sq. km LCC 3470 mss Depth Range 3300 – 3470 m Bazartete B Original PSTM LCC 3470 m Interpretation Map Area 15.9 sq. km Baza

  23. Slide 23: The Opportunity

    OILEXLTD THE OPPORTUNITY

  24. Slide 24: Conclusion

    CONCLUSION The opportunity to invest in…  Approaching production test to assess the commerciality of the significant Cambay Project – Substantial independently verified resource base – Strong energy market fundamentals – Strategic location – hub of Indian distribution network – Near term production

  25. Slide 25: Appendix

    APPENDIX CORPORATE CAMBAY BASIN INDIA GAS MARKET TIGHT OIL AND GAS RESERVOIRS NORTH AMERICAN COMPARISON

  26. Slide 26: Corporate Overview

    CORPORATE OVERVIEW Share Price Performance Capital Structure (at 20 July 2012) Market Listing AIM:OEX ASX:OEX Shares issued 253.3 million Options and performance rights 31.75 million Share price $0.095 £0.059 Market capitalisation $24.1 million £14.9 million 12 months share price range $0.09 - $0.43

  27. Slide 27: Board of Directors and Management

    BOARD OF DIRECTORS AND MANAGEMENT Max Cozijn (Non-Executive Chairman), BComm, CPA MAICD  Chairman since the Company listed on the ASX in 2003, Mr Cozijn has over 31 years experience in the administration of listed mining and industrial companies. He is a Non-Executive Director of Carbon Energy Limi

  28. Slide 28: Cambay Project History and Location

    CAMBAY PROJECT Project History Project Location 1957 • Field discovered by ONGC • 50 BCF produced from Oligocene shallow 1957-92 reservoirs • 63 wells drilled (36 into deeper Eocene) 1994 • PSC awarded to Niko and GSPC • Oilex farms in (45%, Operator) 2005-06 • 3D seismic acquired over contract area

  29. Slide 29: Cambay Basin

    CAMBAY BASIN N – S Section along Basin Axis 29

  30. Slide 30: NSAI's Assessment of Hydrocarbons In-Place

    CAMBAY PROJECT NSAI’s Assessment of Hydrocarbons In-Place Discovered In-Place Volume Estimate Low Best High Zone Oil MMbbl Gas BCF Oil MMbbl Gas BCF Oil MMbbl Gas BCF X 309 311 667 654 1,170 1,110 Y 522 360 965 660 1,718 1,186 Total – Gross 831 672 1,633 1,314 2,887 2,296 Total – Net to Oilex 374 30

  31. Slide 31: Cambay Project Well Tests

    CAMBAY PROJECT Well Tests Cambay-11  16 historical wells with Cambay-63 Y – flowed trace oil and gas Y – produced little oil evidence of oil /gas Cambay-05 Cambay-20 X – 0.20 MMscfgd + 157 bcpd Y – 3.8 MMscfgd + 125 bcpd Y – 4.1 MMscfgd + 170 bcpd  Short term tests from Cambay-73 Cambay-19z Y – 1

  32. Slide 32: Cambay Project Log Interpretation

    CAMBAY PROJECT Log Interpretation NuTech Payzones  Large number of well penetrations – X zone – 41 wells X Zone Pay is not interpreted – Y zone – 39 wells by conventional ?? X Zone analysis – Deeper Zones – up to 29 wells  Log responses Y Zone Pay is similar to indicative of Y Zone conventional pr

  33. Slide 33: Indicative Work Program – Modular Early Production System

    CAMBAY PROJECT Indicative Work Program – Modular Early Production System  Modular system application for ramp up production  Indicative EPS production rate up to 20 MMscf/d $millions / mmscfd  Produce Cambay 76H and future delineation wells on success through EPS  Unit of capacity cost reduces a

  34. Slide 34: Cambay Project – PSC Terms

    CAMBAY PROJECT – PSC TERMS  One of first PSCs in India  No relinquishment requirement  Maximum government share is 35% (recent PSC’s government share as high as 85%) 34

  35. Slide 35: Strong Domestic Demand for Natural Gas

    STRONG DOMESTIC DEMAND FOR NATURAL GAS Primary Energy Composition India’s Natural Gas Deficit 2,500 BCF 500 India World Average 442 444 408 394 2,000 400 339 15% 1,500 300 31% 32% 37% 1,000 200 23% 500 100 6% - - 1990 2007 2008 2009 2010 26% 30% Nature Gas Production Nature Gas Consumption Coal Oil

  36. Slide 36: Unconventional Gas Industry Overview

    UNCONVENTIONAL GAS INDUSTRY OVERVIEW Horizontal Drilling and Hydraulic Fracturing Shale Gas Production in the USA 3,500 3,110 3,000 2,500 2,116 2,000 1,500 1,293 1,000 1,000 800 700 500 ‐ 2004 2005 2006 2007 2008 2009  USA Tight/Shale Oil and Gas production has increased substantially over the last

  37. Slide 37: North American Tight Reservoirs

    NORTH AMERICAN TIGHT RESERVOIRS Cambay Eocene - North American Comparison Basin / Block Barnett Fayetteville Eagle Ford Cambay* Haynesville Marcellus Woodford Antrim New Albany X + Y Zones Estimated Basin 5,000 9,000 12,000 4,000 9,000 95,000 11,000 12,000 43,500 Area, sq miles Depth, ft 6, 500-8,50

Oilex — Investor Presentation (July 2012) on 6ix