Melbana Energy Limited · ASX:MAY

Melbana Energy — MEO Australia — Investor Presentation (April 2007)

17 slides from Melbana Energy's investor presentation, April 2007

  1. Slide 1: International Investor Update April 2007

    International Investor Update April 2007

  2. Slide 2: Presentation Disclaimer

    MEO Australia Limited Presentation Disclaimer This presentation contains includes certain forward-looking statements that have been based on current expectations about future acts, events and circumstances. These forward-looking statements are, however, subject to risks, uncertainties and assumption

  3. Slide 3: MEO Capital Structure, Directors, Major Shareholders

    MEO Capital Structure, Directors, Major Shareholders ASX Code MEO Latest Price* $ 0.67 Security Class Millions Substantial Shareholders % Ordinary shares 223.5 Cambrian Oil & Gas Plc+ 21.7% Options (Ex price/Expiry) Albers Group 9.8% $0.25, 30-Apr-07 51.0 Santos Limited 9.2% $0.50, 30-Nov-09 6.9 Dir

  4. Slide 4: MEO Australia Assets

    MEO Australia Assets Key GTL Projects • Timor Sea LNG (100%) ¾ Uses low CO2 gas • Tassie Shoal Methanol (50%) ¾ Uses High CO2 gas NT/P68 (100%) • Untested gas discovery 11 Tcf GIP (Est.) in two horizons - Heron-1 (1972) • Independent studies indicate high gas liquids and low CO2 in one horizon (Darw

  5. Slide 5: GTL Projects - Unique Real Estate

    GTL PROJECTS - UNIQUE REAL ESTATE Tassie Shoal has Commonwealth Environmental approvals for 3 globally competitive GTL projects MEO Australia energy for the future MEO Australia Limited

  6. Slide 6: Building an integrated GTL company

    Building an integrated GTL company (3 Mtpa LNG & 3.5 Mtpa Methanol) MEO Australia energy for the future MEO Australia Limited

  7. Slide 7: Established Technical Solutions

    Established Technical Solutions Proven LNG & methanol process technologies (Davy & APCI) Exxon Adriatic LNG Production ACE Re-gas terminal for TSLNG plant Similar design to TSMP Similar to Hang Tuah Vietnam (Conoco) MEO Australia energy for the future MEO Australia Limited

  8. Slide 8: Gas & LNG Development Schedule

    Gas & LNG Development Schedule 2006 2007 2008 2009 2010 2011 2012 Component Oct Nov Dec Mar Jun Sep Dec Mar Jun Sep Dec Cyear Cyear Cyear Cyear Seismic 3D acquisition 3D processing 3D interpretation 2D acquisition 2D processing 2D interpretation Epenarra outfill 3D Drilling H-2, B-1, H-3 Appraisal d

  9. Slide 9: NT/P68 Activity Update

    NT/P68 Activity Update • 600 km 2D infill over Blackwood acquired • Blackwood mapping nearing completion • 505 sq km 3D over Epenarra acquired • Initial 3D interpretation completed • Wells engineered • West Atlas jack-up rig secured to drill wells September 2007: Heron-2 & Blackwood-1 MEO Australia

  10. Slide 10: Heron-2 to target 50m gas column in Darwin Fm.

    Heron-2 to target 50m gas column in Darwin Fm. Heron-1 Logs Total Gas GR Resistivity Epenarra MEO Australia energy for the future MEO Australia Resistivity Log Limited

  11. Slide 11: MEO Australia Limited

    MEO Australia energy for the future MEO Australia Limited

  12. Slide 12: Flat Event is Direct Hydrocarbon Indicator

    Flat Event is Direct Hydrocarbon Indicator for possible Gas-Water Contact Equivalent Impedance Section Heron-1 well 3D Seismic data location Epenarra Darwin Fm Heron Nth ian U/ C Heron Sth Ti t ho n oir l an g reserv Top E Flat Event MEO Australia energy for the future MEO Australia Limited

  13. Slide 13: Heron-1 well TD'd in Top Elang - Heron South

    Heron-1 well TD’d in Top Elang - Heron South Elang/Plover gas column confirmed Gas in Darwin Fm. sandstone Gas in MEO Australia Elang/Plover Heron-1 Gamma Evans Shoal-2 energy for the future Ray & Sonic logs GammaMEO Ray Australia Limited

  14. Slide 14: West Atlas rig secured to drill Heron-2

    West Atlas rig secured to drill Heron-2 to appraise 11 Tcf GIP in 2 horizons MEO Australia energy for the future MEO Australia Limited

  15. Slide 15: 3D Phase Attribute Analysis - Epenarra

    3D Phase Attribute Analysis - Epenarra Heron-1 well Possible Heron-2 location Base Darwin Fm. Possible Intense Fracturing MEO Australia energy for the future MEO Australia Limited

  16. Slide 16: Project Summary

    Project Summary Activity Upstream Downstream Interests Interests Seismic NT/P68 (100%) LNG Project Methanol Projects: 50% (APCI) W Heron-2 100% Stage I Stage II e Epenarra and Heron 3+ mtpa 1.8 mtpa 5,000 t/d l Nth Appraisal US$1b US$872m 1.8 mtpa l 5.6 & 5.5 Tcf NPV* $1547M NPV* US$456M Superior #

  17. Slide 17: MEO Australia Future

    MEO Australia Future • Scope for significant, strategic gas and rapid commercialization path via approved GTL projects • Heron-2 well will test two targets from single location – Epenarra: Darwin Fm. 5.6 Tcf of wet gas – Heron North: Plover Fm. 5.5 Tcf • Blackwood-1 well: Plover Fm. 1-3 Tcf • Positi

MEO Australia — Investor Presentation (April 2007) on 6ix