Impact Minerals Limited · ASX:IPT

Impact Minerals — AMEC 2007 National Mining Congress

22 slides from Impact Minerals's conference presentation, Jun 14, 2007

  1. Slide 1: Presentation to AMEC 2007 National Mining Congress

    IMPACT MINERALS LIMITED ANNOUNCEMENT 14t June 2007 The Companies Announcement Office Australian Securities Exchange Level 10 Exchange Centre 20 Bond Street SYDNEY NSW 2000 Dear Sirs, Presentation AMEC’s 2007 National Mining Congress Please find attached the presentation provided to delegates at the

  2. Slide 2: Impact Minerals Limited

    Ss SS S@ IMPACT MINERALS LIMITED

  3. Slide 3: $5 million raised by IPO

    $5 million raised by IPO: e Uranium, Go'c and Nicke! Explorer and Producer; ¢ Explore 6 projects, all with potential for significant mineral deposits; and ¢ Explore and develop a uranium resource. Leverage through: * partnerships with CITIC Resources, Liontown Resources and Straits Resources; * vigo

  4. Slide 4: Capital Structure

    Capital Structure 63.3 million shares and ~0.5 million employee options Top 20 Remainder 70% 30% Management and Founders 38% Vendors Other 5% Stats 22% Three institutions: Singapore, UK and US

  5. Slide 5: The Team

    The Team IMPACT MINERALS LIMITED Chairman Peter Unsworth Director: Business Development © Dr Rod Fripp Managing Director” Dr Mike Jones -Business Administr: Trish Hollow Senior Project Geolog: Project Geologist. Project Geologist Dr.Gavin England ~~ Amy Tizzard / Dr Dave Wood

  6. Slide 6: Seven Key Projects

    Seven Key Projects Drummond West coe Drummond East {Clermont oi Yarrabubb: Be Junction South %* Impact Minerals Project Locations AN — 1000 km

  7. Slide 7: Getting Results

    Getting Results DRILLING ADVANCED TARGETS EXPLORATION Drummond Eas and Drummond West PROJECT GENERATION

  8. Slide 8: Impact 100%

    é IMPACT MINERALS LIMITED Impact 100% Impact 100%

  9. Slide 9: Drummond Basin: Queensland | Clermont Project (100%)

    Drummond Basin: Queensland | Clermont Project (100%) ssratn me Gold mineralised trend defined by drilling Soil Responses SH} Moderate to strong zine ZZ Nooterate gold Weak to moderate polymetalic. | so0000 mn oO Probable Drill Targets 4 < 7445500 mt 4 : a > Boundary of Soil geochemisiry PAN 7442000

  10. Slide 10: Quinns Lake, Yarrabubba and Junction South Projects

    « IMPACT MINERALS LIMITED Quinns Lake Project Impact 100% Yarrabubba Project Impact 20%, CITIC Resources 60%, Others 20% Junction South Project Impact 40%: Liontown Resources 60% Drilling Q3 2007

  11. Slide 11: Sudbury

    Sudbury DEPOSIT TYPES Contact | Footwaill | Offset Sublayer |Position |Dyke Position Position (50% of ore) Cu (%) 0.8 Ni (%) 1.2 PGM 0.7 (git) =. The major deposits are oe ; outside the Contact Sublayer in the Footwall and Offset Dyke positions.

  12. Slide 12: Quinns Lake and Yarrabubba Projects

    é IMPACT MINERALS LIMITED Quinns Lake Project Impact 100% Yarrabubba Project Impact 20%, CITIC 60%, Others 20%

  13. Slide 13: Yarrabubba Project

    Quinns Lake -Yarrabubba Uranium PROJECT 0 ay 10 km 660 000 mE i 680 000 mE ! Cogla Downs U © Uranium prospect YARRABUBBA | 7000 000 mN 4 700 000 mE ! Approx. 40% of the Nowthanna U Deposit: 1,800 t U308 (4 million Ibs) Four other uranium prospects discovered in 1970’s and 1990’s;

  14. Slide 14: Nowthanna Uranium Deposit

    Quinns Lake -Yarrabubba Uranium Nowthanna Uranium Deposit Total Inferred Resource Cut-off Tonnage Grade | eU308 [eU308] kg/t tonnes kg/t tonnes 0.75 780,000 1.30 1,000 0.5 2,370,000 0.85 2,000 0.3 6,200,000 0.57 3,500 0.2 10,370,000 0.45 4,600

  15. Slide 15: Mineralisation and mining characteristics

    Quinns Lake -Yarrabubba Uranium 1. Mineralisation 1 m to 20 m below surface. 2. Soft rock - cheap mining. 3. Metallurgical studies (1998): readily extracted by alkaline leach.

  16. Slide 16: Check the drill spacing BEFORE you invest!

    Quinns Lake -Yarrabubba Uranium Check the drill spacing BEFORE you invest!

  17. Slide 17: Quinns Lake -Yarrabubba Uranium

    Quinns Lake -Yarrabubba Uranium

  18. Slide 18: Maximum eU3O8

    Quinns Lake -Yarrabubba Uranium Maximum eU308 %& 1,000to 3,540 (60) FP 500to 1,000 (119) Sv 100to 500 (212) % «10to 100 (99)

  19. Slide 19: Quinns Lake and Yarrabubba Projects Explanation

    Quinns Lake -Yarrabubba Uranium EXPLANATION QUINNS LAKE PROJECT YARRABUBBA PROJECT © Soil sample location S . oO Maximum downhole 2. (MPACT 20 %) Uranium oxide (eppm) a : @A&, 1000 eppm contour U308 ia, 200 eppm contour U308 Geology Playa lake Areas of elevated | uranium values 0 yd 8 km of untested

  20. Slide 20: Resource increase by

    Quinns Lake -Yarrabubba Uranium Resource increase by: * Infill and step-out drilling; » JV/acquisition of contiguous resources (~6 Mlb) for Total 10 Mib. Exploration: * four prospects partly drilled in 70’s and 90’s. = Explore 15 km of untested strike extensions. New radiometric survey: = 70 km of e

  21. Slide 21: Pebble Creek Uranium

    Pebble Creek Uranium Two Target Mineralisation Styles 1. Hydrothermal and structurally controlled uranium-phosphate-REE Previous work: P-U-REE enriched narrow unit over 100 km of strike Channel samples up to 0.1% U308 2. Remobilisation into overlying Cainozoic Cover: Beverley and Honeymoon Analogues

  22. Slide 22: Getting Results

    Getting Results : Drilling June 2007 ane : Airborne magnetic survey June-July, follow up soil geochemistry and drilling, 2008. NICKEL * Quins Lake-Yerracupbe: Airborne EM Survey: Late June: drilling Q4 2007. » Jumetion South: Drilling of ground EM anomalies mid 2007 (Liontown). URANIUM * Guinns Lake

Impact Minerals — AMEC 2007 National Mining Congress on 6ix