Axiant Resources Limited · ASX:AXR
Axiant Resources — Shareholder Meeting (November 2026)
13 slides from Axiant Resources's shareholder meeting presentation, Nov 26, 2026

Slide 1: Unlocking the Pine Creek Goldfield
UNLOCKING THE PINE CREEK GOLDFIELD al use only Exploring a drill-confirmed shallow gold system and district- scale exploration portfolio in the Pine Creek Orogen, N.T. AGM UPDATE | NOVEMBER 2026 ASX CODE ASX : AXR JURISDICTION NORTHERN TERRITORY, AUSTRALIA INVESTOR PRESENTATION| July 2026

Slide 2: Forward Looking Statements and Disclaimer
FORWARD LOOKING STATEMENTS AND DISCLAIMER • Nature of Document: Information in this presentation remains subject to change without notice. The Company has no responsibility or obligation to inform you of any matter arising or coming to its notice, after the date of this document, which may affect an

Slide 3: Investment Highlights | Axiant
INVESTMENT HIGHLIGHTS | AXIANT 01 02 03 04 05 Drill-confirmed District-scale Proven, highly Clear targets Highly al use only shallow gold exploration active Pine and drilling leveraged to system upside Creek address pipeline drill success Gold-in-soil anomaly of Axiant holds >800km2 of Mt Shoobridge

Slide 4: The Pine Creek Orogen
THE PINE CREEK OROGEN Home to confirmed multi DARWIN Axiant Tenure million-ounce gold deposits. Gold Occurrence Major Gold Deposit Current Resource al use only Agnico Eagle (world's 3rd largest gold miner) holds a Gold Plant combined 3.0 Moz Au of Mineral Resources(1) across its adjacent Pine Creek

Slide 5: Leadership | Board of Directors and Capital Structure
LEADERSHIP | BOARD OF DIRECTORS AND CAPITAL STRUCTURE Proven track record in discovery, capital markets and resource company management. Greg English | Non-Executive Chairman Capital Structure Extensive Chair experience Co-founder and former Chair of Core Lithium – oversaw its growth from junior exp

Slide 6: Shoobridge Project | IP Survey Completed
SHOOBRIDGE PROJECT | IP SURVEY COMPLETED IP SURVEY • Gradient array (GAIP) and pole-dipole (PDIP) induced polarisation (IP) surveys completed al use only September / October • GAIP results define a continuous central low- resistivity, elevated-chargeability trend located along the main Shoobridge go

Slide 7: Shoobridge Project | Drilling Targets
SHOOBRIDGE PROJECT | DRILLING TARGETS Mt Shoobridge Initial Planned Drilling Approx. 4,000m of RC drilling(1) to test: Prospect 1. Extensions of gold mineralisation at depth al use only ~800m zone and along strike through step-out holes Drill confirmed of RC drilling 2. Central conductor at depth be

Slide 8: Shoobridge Project | Further Regional Growth Targets
SHOOBRIDGE PROJECT | FURTHER REGIONAL GROWTH TARGETS Exploration is planned Regional-Scale to include prospect- Structural Targets Several large features identified to al use only scale drilling at Mt target the best prospects first Shoobridge with EXPLORATION MODEL High Grade Gold regional corridor

Slide 9: Finniss Project | A Potential Gold Discovery in a Li Dataset
FINNISS PROJECT | A POTENTIAL GOLD DISCOVERY IN A LI DATASET Large geochemical corridors, AXIANT GOLD RIGHTS AT 9 FINNISS EXPLORATION LICENCES multiple vein-hosted PROJECT FOOTPRINT prospects and low-cost 575km 2 al use only opportunity to assay more SURFACE SAMPLES ASSAYED Au than 10 years of lithi

Slide 10: Key Activity and Exploration Newsflow Pipeline
KEY ACTIVITY AND EXPLORATION NEWSFLOW PIPELINE SEP 2026 SEP–OCT 2026 Q4 2026 Q4 2026 / Q1 2027 Shoobridge Shoobridge Shoobridge Shoobridge Field reconnaissance and Targeted Gravity Assisted Initiate RC drilling - 5 holes Initial drilling assay results logistics for targeted Induced Polarisation for

Slide 11: al use only
al use only Michael Fechner Managing Director and CEO admin@axiant.com.au

Slide 12: Pine Creek Orogen – Neighbouring Mineral Resources
PINE CREEK OROGEN – NEIGHBOURING MINERAL RESOURCES M E A S U R E D I N D I C A T E D I N F E R R E D T O T A L Ticker Tonnes Grade Contained Tonnes Grade Contained Tonnes Grade Contained Tonnes Grade Contained Company Project Au (koz) Project Stage (Exchange) (Mt) (g/t) Au (koz) (Mt) (g/t) Au (koz)

Slide 13: Neighbouring Mineral Resources – Source Information
NEIGHBOURING MINERAL RESOURCES – SOURCE INFORMATION Ticker Company Name Project Source PC Gold's ASX announcement dated 21 July 2026, reporting an interim Mineral Resource Estimate of 43.6Mt @ 1.10 g/t Au for 1.51Moz at a 0.5 ASX:PC2 PC Gold Spring Hill al use only g/t cut-off (JORC-2012) Vista Gold
Source: ASX announcement, Nov 26, 2026

