Chaparral Energy Inc

Chaparral Energy — Debt Investor Presentation (November 2012)

28 slides from Chaparral Energy's debt investor presentation, Nov 2, 2012

  1. Slide 1: $150mm Senior Notes Add-On

    $150mm Senior Notes Add-On November 2012 $150mm Senior Notes Add-On November 2012 Exhibit 99.1

  2. Slide 2: Forward-looking statements

    2 2 2 This presentation contains "forward-looking statements" within the meaning of Section 27A of the Securities Act of 1933, as amended, and Section 21E of the Securities Exchange Act of 1934, as amended. These forward-looking statements are subject to certain risks, trends and uncertainties that

  3. Slide 3: Presenters

    3 Presenters Presenters Mark Fischer, Chief Executive Officer & President Joe Evans, Chief Financial Officer & Executive Vice President

  4. Slide 4: Chaparral Overview and Company Statistics

    Chaparral Overview Company Statistics 4 Chaparral Overview Founded in 1988, Based in Oklahoma City Core areas — Mid-Continent (Oklahoma) and Permian Basin (W. Texas) Oil-weighted producer (64% oil; 36% gas); R/P ratio 18.6 years Second largest oil producer in Oklahoma Stable 1P base with large poten

  5. Slide 5: Operating Areas

    Operating Areas 5 Company Total December 2011 proved reserves – 156.3 MMBoe 2011 average daily production – 23.7 MBoe/d Acreage (gross / net): 1,178,489 / 590,324 North Texas Reserves: 3.9 MMBoe, 3% of total Production: 0.5 Mboe/d, 2% of total Permian Basin Reserves: 19.3 MMBoe, 12% of total Product

  6. Slide 6: Strong Record of Reserve and Production Growth

    Strong Record of Reserve and Production Growth 6 6 Strong Record of Reserve and Production Growth 2003 – 2011 CAGR = 15% 2003 – 2011 CAGR = 16% 1) Reserves as of December 31 for each year calculated using flat SEC pricing per the following: Year-End SEC Reserves (MMBoe) (1) Annual Production (MMBoe)

  7. Slide 7: Current Production - 2012

    Current Production - 2012 7 7 Current Production - 2012 Production by Quarter In the 3 rd Quarter Chaparral increased production by 13.4% over the previous quarter

  8. Slide 8: Financial Position to Execute Strategy

    Financial Position to Execute Strategy 8 Financial Position to Execute Strategy *Pro-Forma for $150mm Senior Notes Add-On and Increased Borrowing Base Current Maturity Profile ($mm) Liquidity ($mm) Net Debt / EBITDA Strong Financial Position No senior note maturities before 2020 Hedge positions in p

  9. Slide 9: 2012 Capital Budget

    2012 Capital Budget ($ millions) Key Drilling Areas Total $201 9 EOR Field Total $168 Component 2008 2009 2010 2011 2012 Budget 2012 Expanded Budget 2012 % Total $339 $154 $344 $336 $330 $460 100% 2012 Capital Budget ($ millions) Northern OK Mississippi Horizontal $73 Anadarko Cleveland Sand Anadark

  10. Slide 10: Well Positioned for Near-Term and Long-Term Growth

    10 Chaparral is Well Positioned for Near–Term and Long–Term Growth NOMP CO 2 -EOR Fields Conventional drilling (IRR: 50% - 75%) Anadarko Granite Wash Anadarko Cleveland Sand Unconventional resource play drilling (IRR: 35% - 75%) Northern Oklahoma Mississippi Play (“NOMP”): 260,000 net acres Panhandl

  11. Slide 11: Northern Oklahoma Mississippi Play

    Northern Oklahoma Mississippi Play 11 The Northern Oklahoma Mississippi Play (“NOMP”) is a key near–term focus area for Chaparral. Chaparral acreage over 260,000 net acres in the NOMP. Over 132 MMBoe of potential. 1,600 unrisked drilling well inventory. Chaparral Acreage Overview NOMP Asset Map NOMP

  12. Slide 12: NOMP: Recent Results

    12 NOMP: Recent Results NOMP: Recent Results Current Net Production – 4,000 Boepd Capital - $73 mm NOMP Core (93,000 Net Acres) Significant industry activity in the play Drilled or participated in 34 wells to date (18 operated); 2 WOCU 3-5 additional wells in 2012 Average IP ~600 Boepd; Average EUR

  13. Slide 13: Marmaton Shelf Play

    Marmaton Shelf Play 13 Marmaton Shelf Play Marmaton Production Chaparral Acreage Net Acreage 48,000 EUR/well (Mboe) Cost per Well (MM$) $3.6 Johnston 1H-24 IP +300 Boepd Leatherman 1H-14 2012 Location Lamaster 1H-23 Flowing back Buy Area Ochiltree Co, Tx Cornell 1H-30 2012 Location Jay 1H-1098 Flowi

  14. Slide 14: Chaparral: A Growing Mid-Continent CO2 EOR Company

    Chaparral: A Growing Mid-Continent CO 2 EOR Company 14 Chaparral: A Growing Mid-Continent CO EOR Company

  15. Slide 15: Chaparral is a Leader in the CO2-EOR Industry

    15 8 Chaparral is a Leader in the CO2-EOR Industry # of Active Producer CO 2 -EOR Projects Total Source: April 2012 Oil & Gas Journal Note: Chaparral projects include the North Burbank Unit Chaparral is the third most active CO2-EOR producer in the U.S. Chaparral is a Leader in the CO2-EOR Industry

  16. Slide 16: CO2 EOR Focused Areas

    CO 2 EOR Focused Areas 16 CO EOR Focused Areas CO Project Inventory 74 units with 1P, 2P & 3P EOR reserves 8 units with proved reserves 8 units with CO injection CO Infrastructure – Miles 318 miles of active line 68 miles under construction 87 miles of inactive line CO Supply 47 MMscf/D of existing

  17. Slide 17: EOR 2012 Capital Budget

    EOR 2012 Capital Budget (1) 17 EOR 2012 Capital Budget (1) Budget by Category ($mm) Actual Budget Expanded Budget Infrastructure / Pipelines Drilling Enhancements / CO Purchases Total $86 $127 $168 Panhandle Area Permian Basin Central Oklahoma Area Burbank Area (1) Does not include Capitalized G&A 2

  18. Slide 18: North Burbank Unit – Overview

    North Burbank Unit – Overview 18 Burbank Area: Net Potential: 100 MMBoe, 51% of total North Burbank Unit – Overview Chaparral’s North Burbank Unit is its largest EOR field and plans to introduce CO injection into the North Burbank Unit in 1Q 2013 Chaparral anticipates that it will spend $800 million

  19. Slide 19: Burbank in Perspective

    Burbank in Perspective 19 Burbank in Perspective Secondary Development Primary Development Tertiary Development 110 Years “CO 2 EOR” +8000 BOPD “Waterflood”

  20. Slide 20: Coffeyville CO2 System

    Coffeyville CO 2 System 20 Coffeyville CO System The Coffeyville CO System $84 million of total capital expenditures 23,500 HP compression facility 68.3-mile 8-inch pipeline with potential capacity of approximately 60 MMcf/d. CO is sourced from the CVR Partners fertilizer plant in Coffeyville, KS. O

  21. Slide 21: Monthly Incremental EOR from Active CO2 Projects

    Monthly Incremental EOR from Active CO 2 Projects 21

  22. Slide 22: Potential in Excess of 40 MMBoe

    22 Potential in Excess of 740 MMBoe Potential in Excess of 740 MMBoe Near-term + Long-term strategy yields significant value increase ~ 70% Oil De-risk play, unlock value Production growth Low-risk production upside Long-life, stable production * Woodford, Bone Spring, Avalon, Cleveland Sand, Granit

  23. Slide 23: Financial Performance, Projections, and Credit Statistics

    Financial Performance, Projections, and Credit Statistics 23 Financial Performance, Projections, and Credit Statistics

  24. Slide 24: Financial Summary

    24 Financial Summary 2009 2010 2011 1H 2012 Price Production (MMBoe) 7.6 8.1 8.7 4.2 Financial Data ($mm) Financial Summary Oil & NGL – Wellhead ($/Bbl) $55.04 $74.53 $87.52 $84.12 Gas – Wellhead ($/Mcf) $3.51 $4.36 $4.08 $2.21 Oil & NGL (MMBbls) 3.9 4.1 5.0 2.6 Gas (Bcf) 22.6 23.7 21.6 9.4 Operatin

  25. Slide 25: Strong Financial Performance

    Strong Financial Performance 25 Strong Financial Performance Production (MMBoe) Adjusted EBITDA ($mm) Total Leverage Capital Expenditures ($mm) Includes oil & gas capex and capitalized G&A Total Debt to EBITDA 7.6 8.1 8.7 7.0 7.5 8.0 8.5 9.0 $154 $344 $336 $0 $100 $200 $300 $400 5.3x 3.3x 3.3x - 1.0

  26. Slide 26: 2011 Results and 2012 Updated Guidance

    Operating Statistics 2011 Results and 2012 Updated Guidance 26 2011 Results Updated Guidance Capital Expenditures $336 million $460 million Production 8.7 MMBoe 8.8 - 9.0 MMBoe General and Administrative $4.86/Boe $5.75 - $6.25/Boe Lease Operating Expense $14.03/Boe $14.25 - $14.75/Boe 2011 Results

  27. Slide 27: Hedge Portfolio

    27 Hedge Portfolio $4.44 $4.31 $3.95 $94.45 $102.45 $ 108.79 $96.28 $73.85 $ 114.26 $99.94 $77.88 $ 107.84 $95.24 $77.50 Note: Dollars represent average strike price of hedges (includes all derivative instruments) Gas Basis Hedges YR Price % TP ’12 $ 0.23 78% ’13 $ 0.20 75% ’14 $ 0.23 66% % of Total

  28. Slide 28: Question & Answer

    Question & Answer 28 Question & Answer

Chaparral Energy — Debt Investor Presentation (November 2012) on 6ix