Filo Mining — Investor Presentation (September 2019)
23 slides from Filo Mining's investor presentation, September 2019
Slide 1: Corporate Presentation – September 2019
Corporate Presentation – September 2019 Advancing the Filo del Sol Copper-Gold-Silver Project in South America TSX-V: FIL Nasdaq First Growth Market: FIL www.filo-mining.com 1
Slide 2: Cautionary Statement
CAUTIONARY STATEMENT Certain statements made and information contained in this presentation constitutes “forward-looking information” and “forward-looking statements” within the meaning of applicable securities legislation (collectively, “forward-looking information”). The forward-looking informatio
Slide 3: Filo Mining Corp. Company Profile
FILO MINING CORP. COMPANY PROFILE ➢ Flagship Project – Filo de Sol (100% interest) ➢ South American Advanced Exploration Company ➢ Current Indicated Resource of : ➢ 4.4m Ounces of Gold / 147m Ounces of Silver / 3.1b Pounds of Copper ➢ Lundin Group Company Capital Structure Share Ownership FIL TSX-V,
Slide 4: Filo del Sol Project
FILO DEL SOL PROJECT ➢100% Interest ➢Border of San Juan Argentina & Chile ➢ Pro-mining jurisdictions ➢ Mining Integration and Complementation Treaty ➢ Prolific Cu-Au region ➢Positive PFS Released January 2019 ➢ Incorporated oxide portion of resource only ➢ Nearby water source identified ➢Successful
Slide 5: Filo del Sol Project
FILO DEL SOL PROJECT ➢Successful 2018/19 drill campaign ➢ Extended depth of mineralization 530m to 1,025m ➢ Continuous mineralization 3km N-S distance, and deposit remains open in both direction beyond this ➢ Indications that the hydrothermal system continues well beyond the northern boundary of the
Slide 6: Filo del Sol Deposit Mineral Resource Estimate
Table 6: Filo del Sol Deposit Mineral Resource Estimate Tonnes cu Ag | Ibs Cu oz Au Oz Ag Zone Cutoff Category (millions) | (%) (g/t) [ (millions) (thousands) (thousands) Indicated 141,364 Oxide | *see notes Inferred ; 29,067 Indicated Sulphide | 0.30% CuEq Inferred Indicated 146,738 Total Inferred
Slide 7: Indicated and Inferred Resource
INDICATED AND INFERRED RESOURCE Cu Ag 146.9 3.1 Million oz Billion lbs (indicated) (indicated) Au 4.4 Cu Million oz Ag 1.0 (indicated) 34.8 Billion lbs Million oz (Inferred) (inferred) Au 1.8 Million oz (inferred) Refer to slide 8 for additional details regarding the reporting of the Filo del Sol re
Slide 8: Mineral Resource
MINERAL RESOURCE Total Resource Tonnes Cu Au Ag lbs Cu Ounces Au Ounces Ag Zone Cutoff Category (millions (%) (g/t) (g/t) (millions) (thousands) (thousands) Indicated 49.9 0.04 0.42 3.0 45 679 4,810 AuOx 0.20 g/t Au Inferred 20.8 0.08 0.34 2.4 35 226 1,580 Indicated 259.2 0.38 0.29 2.7 2,166 2,385 2
Slide 9: Positive PFS January 2019
POSITIVE PFS January 2019
Slide 10: Pre-Feasibility Results
PRE-FEASIBILITY RESULTS PFS Results (January 13, 2019) $1.86 billion NPV Pre-Tax NPV (8%) & IRR 27% IRR $1.28 billion NPV After-Tax NPV (8%) & IRR 23% IRR Undiscounted After-Tax Cash Flow (LOM) $3.23 billion Payback Period from start of processing 3.4 Years (undiscounted, after-tax cash flow) $3.00/
Slide 11: Metal Production Profiles
METAL PRODUCTION PROFILES UNIQUE TO HAVE THIS LEVEL OF COPPER, GOLD AND SILVER PRODUCED Annual Metal Production (based on 12-year LOM) ➢ 67,000 t Cu ➢ 159,0000 oz Au ➢ 8,653,000 oz Ag A National Instrument 43-101 – Standards of Disclosure for Mineral Projects (“NI 43-101”) Technical Report, entitled
Slide 12: Probable Mineral Reserves
PROBABLE MINERAL RESERVES Filo del Sol Mineral Reserve Statement (@ 0.01 $/t NVPT cut-off) Tonnage Grade Contained Metal Category (all domains) (Mt) Cu (%) Au (g/t) Ag (g/t) NVPT ($/t) Cu (M lbs) Au (K oz) Ag (K oz) Proven _ _ _ _ _ _ _ _ Probable 259.1 0.39 0.33 15.1 25.30 2,226 2,764 126,028 Total
Slide 13: Exploration
EXPLORATION
Slide 14: 2018/2019 Drill Results
2018/2019 DRILL RESULTS MINERALIZED ALL THE WAY ➢~4,700 m program ➢ 7 holes drilled ➢ 6 out of 7 ending in mineralization ➢ Resource remains open North to South and at depth ➢ Continuous mineralization of a 3km North to South distance and 900m East to West ➢ Extended depth of mineralization 530m dee
Slide 15: 2018/2019 Drilling Results – First Holes
2018/2019 DRILLING RESULTS First 2 Holes – March 18, 2019 • FSDH025 & FSDH026 HOLE-ID From (m) To (m) Length (m) Cu % Au g/t Ag g/t FSDH025 0.0 1025.0 1025.0 0.30 0.22 1.6 incl. 334.0 466.0 132.0 0.48 0.30 1.2 FSDH026 0.0 613.9 613.9 0.39 0.34 1.6 incl. 14.0 474.0 460.0 0.45 0.34 1.6 and incl. 14.0
Slide 16: 2018/2019 Drilling Results – Second Holes
2018/2019 DRILLING RESULTS Second 2 Holes – May 23, 2019 • FSDH027 & FSDH028 HOLE-ID From (m) To (m) Length (m) Cu % Au g/t Ag g/t FSDH027 0.0 545.4 545.4 0.22 0.28 1.8 incl 318.0 422.0 104.0 0.37 0.34 3.5 FSDH028 16.0 563.5 547.5 0.40 0.78 8.0 incl 155.0 164.0 9.0 0.18 22.04 15.2 and incl 390.0 563
Slide 17: 2018/2019 Drilling Results – Final Holes
2018/2019 DRILLING RESULTS Final 3 Holes – May 28, 2019 • FSDH029, FSDH030 & FSDH031 HOLE-ID From (m) To (m) Length (m) Cu % Au g/t Ag g/t FSDH029 0.0 800.1 800.1 0.24 0.26 1.8 incl 6.0 42.0 36.0 0.78 0.20 3.1 FSDH030 134.0 512.0 378.0 0.44 0.89 42.5 incl 190.0 244.0 54.0 1.05 0.83 1.4 and incl 262.
Slide 18: Next Steps
NEXT STEPS • Ongoing environmental studies and data collection in support of project permitting • Initiate flotation metallurgical testwork on transition zone material • Embarking on 2019/2020 field season • Plan to drill 10,000m+ • 4 Rigs turning starting in November
Slide 19: Potential to Extend Resource
POTENTIAL TO EXTEND RESOURCE HOLE 25 TO VRC093 IS 3KM AND REPRESENTS AN UNTESTED TARGET AT DEPTH 0 1000m 500 m FSDH029 FSDH027 FSDH026 FSDH025 FSDH028 FSDH030 VRC093 Plus 800.1m 545.4m 613.9 m 1025m 563.5m 512m 0.24 Cu% 0.22 Cu% 0.39 Cu% 0.30 Cu% 0.40 Cu% 0.44 Cu% 26m 14m 0.26 g/t Au 0.28 g/t Au 0.3
Slide 20: Experienced Management Team
EXPERIENCED MANAGEMENT TEAM EXPERTISE IN EXPLORATION, PROJECT STUDIES, FINANCING Adam Lundin, President and CEO Wojtek Wodzicki, Technical Consultant • See biography on next slide (Board of Directors) • See biography on next slide (Board of Directors) Jamie Beck, Vice President Corporate Development
Slide 21: Strong & Reputable Board
STRONG & REPUTABLE BOARD EXPERTISE IN EXPLORATION, PROJECT STUDIES, FINANCING, M&A TRANSACTIONS Lukas Lundin, Chairman (non-executive) Paul McRae • Successful entrepreneur focused on natural resources. • Distinguished global reputation in project and • Has led numerous companies through successful c
Slide 22: A Lundin Group Company
A LUNDIN GROUP COMPANY CREATING VALUE FOR SHAREHOLDERS The Lundin Group of Companies has a record of creating substantial value for shareholders. Past projects have generated some $15.8 billion. Shareholder Return on Investment* 1757% 1041% 1091% 961% 850% 558% 609% 352% 139% *Year is date of takeov
Slide 23: Board and Management
BOARD AND MANAGEMENT For more information contact: Michelle Fyfe Robert Eriksson Investor Relations Canada Investor Relations and Media Sweden info@filo-mining.com reriksson@rive6.ch Tel: +1 604 689 7842 Tel: +46 (0)8 440 5450 Suite 2000 – 885 West Georgia Street Vancouver, BC Canada V6C3E8 www.filo