Tennessee Valley Authority · NYSE:TVC

Tennessee Valley Authority — 08 20 2010 board presentations

182 slides from Tennessee Valley Authority's investor presentation, Aug 20, 2010

  1. Slide 1: President's Report

    PRESIDENT’S REPORT

  2. Slide 2: TVA Performance Summary

    TVA Performance Summary Vs. Plan Vs. Last Year Vs. Peers Net Cash Flow Retail Rates Rates Sales Fuel & Purchased Power Operations & Maintenance* Capital Investment Plant Reliability Reliability System Reliability Runoff Hydro y Generation ponsibility Safety Environmental (REE) Resp Organizational Ef

  3. Slide 3: Notice of Violations

    Notice of Violations 40 35 30 25 20 15 10 5 0 2005 2006 2007 2008 2009 2010YTD 4

  4. Slide 4: Operations and Financials

    Operations and Financials

  5. Slide 5: Power Sales

    Power Sales Fiscal Year 2010 - July YTD Results 140 120 att-hours Sales % 100 FYTD09 136.0 105% of Gigawa Plan 133.6 107% 80 Actual 143.3 ousands o 60 40 Tho 20 0 Distributor Industrial Other 107% 112% 68% 6

  6. Slide 6: Energy Supply

    Energy Supply 80 Fiscal Year 2010 - July YTD Results 70 Plan 136 4 136.4 att-hours Actual 145.1 60 106% of Plan of Gigawa 50 40 ousands o 30 20 Tho 10 0 Hydro Coal Nuclear Gas Purchases 199% 87% 102% 167% 174% 7

  7. Slide 7: Revenue

    Revenue July YTD Fuel & Non-Fuel Revenue 10 Fuel Revenue 9.4 Non-Fuel Revenue 9 8.9 86 8.6 8 7 $ Billion 6 5 4 3 2 FY09 Plan Actual 8

  8. Slide 8: Operating Expenditures

    Operating Expenditures July YTD 2010 Spend S 10 9.4 9 11 1.1 8.5 8 1.0 7.6 1.4 7 1.1 1.9 6 $ Billion 2.9 1.6 5 2.5 4 25 2.5 3 2 4.0 3.1 1 24 2.4 0 FY09 Plan Actual Fuel & PP O&M Capital Interest 9

  9. Slide 9: Fuel Cost Adjustment

    Fuel Cost Adjustment Fourteen months (8 periods) of decline followed by 7 months of escalation 10

  10. Slide 10: Rainfall and Runoff

    Rainfall and Runoff Fiscal Year 2010 - July YTD Results 45 40 Normal 35 Actual 30 Inches 25 20 15 10 5 0 Rainfall Runoff 91% 114% 11

  11. Slide 11: Rainfall and Runoff - Recent Trend

    Rainfall and Runoff - Recent Trend FY10CumulativeRainfallDeviationfromNormal 5 4 Dec Jan 3 Oct Nov eb Feb 2 1 hes Mar Inch 0 1 May 2 2 Apr 3 June 4 4 July 5 12

  12. Slide 12: Industry News

    Industry News

  13. Slide 13: Industry News

    Industry News Congress delays energy legislation EPA proposes Cl Clean Ai Air T Transportt R Rule l EPA holds public meetings on coal combustion residue rules Georgia Power’s long-range plan calls for less reliance on coal; new focus on conservation NERC report cautions that a major shift to cleaner

  14. Slide 14: Hard Spots

    Hard Spots

  15. Slide 15: Hard Spots

    Hard Spots Extreme heat and high power demand 21

  16. Slide 16: 22

    22

  17. Slide 17: Meeting the Summer Peak

    Meeting the Summer Peak Summer, 2010 31,777 Megawatts August 4 99r F All Time 33,482 Megawatts August g 16, 2007 102r 23

  18. Slide 18: Hard Spots

    Hard Spots Extreme heat and high power demand Cooling water limits at power plants 24

  19. Slide 19: Cooling Water Limits at Power Plants

    Cooling Water Limits at Power Plants 25

  20. Slide 20: Hard Spots

    Hard Spots Extreme heat and high power demand Cooling water limits at power plants Fi att Shawnee Fire Sh Fossil F il Plant Pl t 26

  21. Slide 21: Fire at Shawnee Fossil Plant

    Fi att Sh Fire Shawnee Fossil Plant 27

  22. Slide 22: Hard Spots

    Hard Spots Extreme heat and high power demand Cooling water limits at power plants Fi att Shawnee Fire Sh Fossil F il Pl Plantt Kingston fine 28

  23. Slide 23: 29

    29

  24. Slide 24: Hard Spots

    Hard Spots Extreme heat and high power demand Cooling water limits at power plants Fi att Shawnee Fire Sh Fossil F il Pl Plantt Kingston fine Generation Partners communications 30

  25. Slide 25: Generation Partners

    Generation Partners —Wayne National Forest 31

  26. Slide 26: Hard Spots

    Hard Spots Extreme heat and high power demand Cooling water limits at power plants Fi att Shawnee Fire Sh Fossil F il Pl Plantt Kingston fine Generation Partners communications Reaction to mixed oxide fuel 32

  27. Slide 27: 33

    33

  28. Slide 28: Highlights

    Highlights

  29. Slide 29: Highlights

    Highlights Improving regional economy and power sales 35

  30. Slide 30: Regional Manufacturing Trend

    Regional Manufacturing Trend 12% Industrial Production (seasonally adjusted index, 2002=100) 8% 4% onth, previous year) 0% -4% nge, same mo -8% -12% (% chan -16% Source: Federal Reserve; TVA -20% 20% 36

  31. Slide 31: Highlights

    Highlights Improving regional economy and power sales 523-day run by Browns Ferry Unit 1 37

  32. Slide 32: SAAT y Wes

    \ \ } , = SAAT y Wes Se ae: VAN A. ESO AVA

  33. Slide 33: Highlights

    Highlights Improving regional economy and power sales 523-day run by Browns Ferry Unit 1 Favorable ruling on North Carolina lawsuit 39

  34. Slide 34: Highlights

    Highlights Improving regional economy and power sales 523-day run by Browns Ferry Unit 1 Favorable ruling on North Carolina lawsuit Toyota resumes construction in Mississippi 40

  35. Slide 35: New Toyota Plant at TVA Megasite, Blue Springs, MS

    New Toyota Plant at TVA Megasite, Blue Springs, Springs MS 41 —RYC Behind the Lens

  36. Slide 36: Highlights

    Highlights Improving regional economy and power sales 523-day run by Browns Ferry Unit 1 Favorable ruling on North Carolina lawsuit Toyota resumes construction in Mississippi Major 500-kilovolt transmission project completed 42

  37. Slide 37: t [ v4 rt . m4

    t 7 1 [ v4 rt . m4

  38. Slide 38: Highlights

    Highlights Improving regional economy and power sales 523-day run by Browns Ferry Unit 1 Favorable ruling on North Carolina lawsuit Toyota resumes construction in Mississippi Major 500-kilovolt transmission project completed Watts Bar progress 44

  39. Slide 39: 45

    45

  40. Slide 40: Highlights

    Highlights Improving regional economy and power sales 523-day run by Browns Ferry Unit 1 Favorable ruling on North Carolina lawsuit Toyota resumes construction in Mississippi Major 500-kilovolt transmission project completed Improving demand response ORAU h health l h screening i results l for f Kin

  41. Slide 41: Chairman's Report

    Chairman’s Report 1A

  42. Slide 42: Vision and Strategic Direction

    Vision and Strategic Direction

  43. Slide 43: TVA's Vision: Roadmap to the Future

    TVA’s TVA s Vision R d Roadmap t the to th Future F t

  44. Slide 44: Overview

    Overview A Look Back (briefly) A Look at Today A Vision for Tomorrow 51

  45. Slide 45: History of Accomplishment

    History of Accomplishment River Management Economic Development cl logical Innovation Environmental Stewardship

  46. Slide 46: History of Accomplishment

    History of Accomplishment Low-cost Power River Management Technological Innovation Environmental Stewardship

  47. Slide 47: Largest Public Power Provider

    Largest Public Power Provider 2009 Sales in Billions of Kilowatt-hours 150 100 50 0 TVA Bonneville Power Salt River Santee Cooper Los Angeles DWP 54

  48. Slide 48: A Look at Today

    A Look at Today Economic uncertaintyy Infrastructure investments needed Still no clear national energy policy Opportunities exist for TVA to lead 55

  49. Slide 49: Our Mission Isn't Changing

    Our Mission Isn’t Isn t Changing 56

  50. Slide 50: But the times are changing, so our vision is changing

    But the times are changing… changing So our vision is changing To achieve our mission today we must lead with: Focus …on key critical issues Action …to achieve an impact y Clarity…so results are transparent p 57

  51. Slide 51: TVA's Vision

    TVA’s Vision One of the Nation’s Leading Providers of Low-Cost and Cleaner Energy by 2020

  52. Slide 52: TVA's Vision

    TVA’ss Vision TVA Serve the People of the Tennessee Valley by being: The Nation’s leader in improving our air quality The Nation Nation’s s leader in increased nuclear production The Southeast’s leader in increased energy efficiency

  53. Slide 53: Staying Focused on...

    Staying Focused on on… Our Rates O r Reliabilit Our Reliability O R Our Reputation t ti 60

  54. Slide 54: While acting on new initiatives

    While acting on new initiatives initiatives… • Improved air quality • Increased I d nuclear l production d ti • Increased energy efficiency 61

  55. Slide 55: While acting on new initiatives

    While acting on new initiatives initiatives… • Improved air quality • Increased I d nuclear l production d ti • Increased energy efficiency 62

  56. Slide 56: Cleaner Power Production

    Cleaner Power Production Significantly increase production from low emission electricity generators

  57. Slide 57: Reduce Emissions

    Reduce Emissions Reduce SO2, NOX, mercury, particulate, and CO2 emissions from TVA plants

  58. Slide 58: Sulfur Dioxide Emissions

    Sulfur Dioxide Emissions s Y* © 5 > s ss n wv = 2 i= 2 s n 2 & 2 3 2 = s Ss a gs Forecast 1980 1985 1990 1995 2000 2005 2010 2015 2020

  59. Slide 59: Nitrogen Oxide Emissions

    Nitrogen Oxide Emissions s Ss Ss a 2 [-) = s n s a Ss Es s 5 s i—) s = & Forecast Ss NY Ss 1995 2000 2005 2010 2015 2020

  60. Slide 60: While acting on new initiatives

    While acting on new initiatives initiatives… • Improved air quality • Increased I d nuclear l production d ti • Increased energy efficiency 67

  61. Slide 61: New generation

    New generation Lead the nation in delivery of new nuclear capacity

  62. Slide 62: Nuclear Capacity Additions

    Nuclear Capacity Additions 69

  63. Slide 63: Technology

    Technology Demonstrate the first small modular reactor in the U.S. Image courtesy of Babcock and Wilcox

  64. Slide 64: While acting on new initiatives

    While acting on new initiatives initiatives… • Improved air quality • Increased I d nuclear l production d ti • Increased energy efficiency 71

  65. Slide 65: Energy Efficiency

    Energy Efficiency Help consumers and businesses use energy more efficiently and save money

  66. Slide 66: Energy Efficiency Program Goal

    Energy Efficiency Program Goal 73

  67. Slide 67: Demand management

    Demand management Reduce peak power usage with demand management tools, i l di ti including time-of-use f rates

  68. Slide 68: Efficient production

    Efficient production Minimize transmission losses and optimize plant efficiency

  69. Slide 69: TVA's Vision

    TVA’s Vision One of the Nation’s Leading Providers of Low-Cost and Cleaner Energy by 2020

  70. Slide 70: Achieving the Vision

    Achieving g the Vision Role of the Integrated Resource Plan

  71. Slide 71: Integrated Resource Plan Process

    Integrated Resource Plan Process Scope Summer 2009 78

  72. Slide 72: Stakeholders Are Involved

    Stakeholders Are Involved • Commonwealth of Kentucky • State of Tennessee • Tennessee Chamber of Commerce and • Howard Baker Center for Public Policy Industry • Joe Wheeler EMC • Tennessee Paper Council • Oak Ridge National Laboratory • Tennessee Valley Industrial Committee • Tennessee Valley Public

  73. Slide 73: Integrated Resource Plan Process

    Integrated Resource Plan Process Develop Present Analyze and Scope Inputs and Initial Evaluate Framework Results Summer Fall 2009 – Spring Now 2009 Winter 2010 2010 80

  74. Slide 74: Integrated Resource Plan Process

    Integrated Resource Plan Process Develop Present Analyze and Incorporate Complete Scope Inputs and Initial Evaluate Input IRP Framework Results Summer Fall 2009 – Spring Fall 2010 – Spring Now Winter 2011 2011 2009 Winter 2010 2010 81

  75. Slide 75: IRP Helps Shape and Test the Vision

    IRP Helps Shape and Test the Vision TVA Mission Strategic g Vision Activities Translation Integrated Resource Plan (IRP) Tests and Shapes Activities Tactical Activities FY 11 Business Plan 82

  76. Slide 76: Building Flexibility for Future Decisions

    Building Flexibility for Future Decisions IRP will present multiple p p planningg strategies Building a “Multi-lane Highway” of Flexibility Portfolios cover a Breadth of broad range of resource Recommended options supply pp y and direction adopted considered by Board in IRP demand-side options Time

  77. Slide 77: IRP Uses Scenario Planning Method

    IRP Uses Scenario Planning Method Scenarios Current #1 #2 #3 #4 #5 #6 Situation A ategies B Planning Stra C D E 84

  78. Slide 78: Modeling is Extensive

    Modeling is Extensive A total of 2,520 cases are considered (35 portfolios tf li x 72 iterations) it ti ) Develop Planning Inputs Optimized Production Identify Capacity Total Plan Costs Capacity Plans Cost and Resource Planning Financial Options Model Analysis Define Constraints 85

  79. Slide 79: Portfolio Expansion Plans

    Portfolio Expansion Plans DiversityFocusedResourcePortfolio(StrategyC) CapacityAdditionsbyScenario 25,000 2010Spring Scenario1 Scenario2 Scenario3 Scenario4 Scenario5 Scenario6 Baseline 20,000 CapacityAdditions(MW) 15,000 10,000 5,000 2010 22015 22020 22025 22028 2010 22015 22020 22025 22028 2010 22

  80. Slide 80: Implications of Draft IRP Results

    Implications of Draft IRP Results Early Indication Implication Environmental Cleaner portfolio provides cost and environmental Benefits benefits Nuclear Needed by 2018-2020 to replace coal Energy Efficiency and Steady growth of EE/DR effort Demand Response Renewable Consider additional cost-effectiv

  81. Slide 81: Cumulative Capacity Changes

    Cumulative Capacity Changes 4000 CumulativeCapacityChanges 2011 2015 2011 2000 MW Nuclear Gas 1,140MW 1,000MW 0 IdledCoal Idled Coal 1,000MW 2000 88

  82. Slide 82: Cumulative Capacity Changes with EE&DR

    Cumulative Capacity Changes with EE&DR 4,000 CumulativeCapacityChanges p y g 2011 2015 2 000 2,000 EE&DR MW 1,900MW Nuclear Gas 1,140MW 1,000MW 0 IdledCoal Idled Coal 1,000MW 2,000 89

  83. Slide 83: Committed to Serving the Public

    Committed to Serving the Public Integrated Resource Plan 90

  84. Slide 84: TVA's Vision

    TVA’s Vision One of the Nation’s Leading Providers of Low-Cost and Cleaner Energy by 2020

  85. Slide 85: First steps toward the Vision

    First steps toward the Vision Idling approximately 1,000 1 000 megawatts of our older, unscrubbed coal units Recommending approval of the next phase of the Bellefonte Nuclear Project Recommending approval for an increase in the energy efficiency budget 92

  86. Slide 86: Next Steps

    Next Steps Approval of: • Vision • Fiscal Year 2011 Budget • Integrated g Resource Plan in Spring 2011 93

  87. Slide 87: TVA's Vision

    TVA’s Vision One of the Nation’s Leading Providers of Low-Cost and Cleaner Energy by 2020

  88. Slide 88: Finance, Rates, and Portfolio

    Finance, Rates, and Portfolio

  89. Slide 89: Fiscal Year 2011 Budget Approval

    Fiscal Year 2011 Budget Approval

  90. Slide 90: What This Plan Includes

    What This Plan Includes Discussion Topic Key Takeaway Supply and Demand Well Balanced F l and Fuel d Purchased P h d Power P Pi Prices IIncreasing i Operational Spending Asset Investments Capacity Expansion Addressing Future Needs Appropriately Capitalized Financial Health Principles Based Economic

  91. Slide 91: Supply and Demand

    Supply and Demand

  92. Slide 92: Economic Drivers

    Economic Drivers Expect some regional GDP growth in 2011 Industrial production has been recovering faster p than expected Weak commercial activity continues Unemployment remains high in the region 100

  93. Slide 93: Projected TVA Sales

    Projected TVA Sales 180.1 Weather Normal - Weather Wh) Slight Economic (billion kW R Recovery 171.2 170.1 167.6 164.0 2008 2009 2010 Budget 2010 Forecast 2011 Forecast Excludes off-system sales 101

  94. Slide 94: Capacity & Peak Demand Balance

    Capacity & Peak Demand Balance Firm Requirements Firm Supply 2% 0% 2% Distributors 13% 17% Coal Direct Served 4% G Gas 37% Reserves Purchase Losses Nuclear 18% Hydro EE / DR 81% Renewables 8% 18% Total Firm Requirements Net 1,464 MW Total Firm Supply = 36,068 36 068 MW Long = 37,532 37 532 MW 102

  95. Slide 95: Key Takeaways (Supply & Demand)

    Key Takeaways (Supply & Demand) Slight sales decline due to weather Modest economic recovery continues System S t demands d d mett with ith planned l d capacity it additions 103

  96. Slide 96: Fuel and Purchased Power

    Fuel and Purchased Power

  97. Slide 97: Coal Prices

    $/ton $10 $20 $30 $40 $50 $60 $70 $80 $0 Jan-07 Mar--07 May -07 Jul-07 Sep--07 Nov--07 Jan-08 Coal Prices Mar--08 May -08 Jul-08 Sep--08 Nov--08 Jan-09 Mar--09 May -09 Jul-09 Sep--09 Nov--09 Jan-10 to rebound from 2009 lows Prices are down significantly Mar--10 from 2008 highs and expected May -10 J

  98. Slide 98: Natural Gas Prices

    Natural Gas Prices Natural Gas Prices – Henry Hub $8 90% Case $7 $6 $5 $/MMBtu $4 10% 0% Case $3 $2 $ Gas prices are expected to rise driven primarily by economic $1 recovery. $0 Jan-09 May-09 Sep-09 Jan-10 May-10 Sep-10 Jan-11 May-11 Sep-11 106

  99. Slide 99: Purchased Power Prices

    Purchased Power Prices Power Prices – Into TVA $90 $80 $70 90% Case $60 $/MWh $50 $40 $30 10% Case $20 Power prices will likely follow the gas price trajectory $10 $0 Jan-09 Sep-09 May-10 Jan-11 Sep-11 107

  100. Slide 100: Fuel and Purchased Power

    Fuel and Purchased Power • Less volume due to lower sales -$100M • Higher prices: Coal +$350M; Purchase Power +$200M; Gas +$50M • Hydro impact: +$150M $5,000 $4,330 ((in millions) $4,056 $3,908 $3,827 $4,000 $3,000 Oil & Gas Nuclear Purchased Power $2,000 Coal C l $1,000 $0 2008 2009 2010 Forecast 2

  101. Slide 101: Fuel and Purchased Power Contracting

    Fuel and Purchased Power Contracting The Contracting Plan is the basis to authorize contracts that satisfy fuel- and power-related operating requirements. It enables TVA to: • Economically and reliably supply fuel to TVA’s fleet • Purchase P h power where h economical i l • Manage rate volatility fo

  102. Slide 102: Key Takeaways (Fuel & Purchased Power)

    Key Takeaways (Fuel & Purchased Power) Fuel volume down due to lower sales Overall commodity prices trending up L Lower priced i d contracts t t expiring ii Laddered hedging utilized to mitigate customer fuel volatility 110

  103. Slide 103: Gas Transportation

    Gas Transportation

  104. Slide 104: Gas Transportation

    Gas Transportation 31% of TVA gas supplies are transported on Texas Gas The Lagoon Creek CC with Winter Dependable Capacity of 615 MW and a Texas Gas supplies 4 TVA gas facilities gas demand of 105,600 dth/day can - Southaven CC - Lagoon Creek CT also receive gas from Texas Gas - Marshall CT - Allen

  105. Slide 105: Gas Transportation

    Gas Transportation Texas Gas Transmission is the sole gas pipeline to the Southaven CC facility and supplies the Lagoon Creek CC, Marshall CT and Allen CT facilities Firm pipeline capacity is required to ensure reliable power g p generation capacity p y from the 817 MW Southaven CC facility The 10 y

  106. Slide 106: Enrichment Services Contracts

    Enrichment Services Contracts

  107. Slide 107: Enrichment Services Contracts

    Enrichment Services Contracts TVA must buy uranium enrichment services to ensure an adequate and uninterrupted supply of fuel for our nuclear reactors 115

  108. Slide 108: Uranium Processing

    Uranium Processing Steps to becoming reactor fuel Enrichment C Conversion i tto UF6 F b i ti Fabrication (UO2) Uranium Mines and Mills (U3O8) Reactors 116

  109. Slide 109: GLE Enrichment Offer

    GLE Enrichment Offer GLE (North Carolina plant) provides competitive offer for enrichment: • The contract would provide 12% of TVA’s enrichment needs from 2015 to 2025 • Pricing compares favorably with previously accepted contracts • Supply diversification • Total price: $400 million 117

  110. Slide 110: GLE New Technology Risk Mitigation

    GLE New Technology Risk Mitigation Laser technology to be commercially proven TVA’s enriched uranium inventory is a mitigation against GLE production delays In case of the GLE project termination, other enrichment services contracts can be entered into with existing TVA enrichment suppliers Once GLE

  111. Slide 111: Operational Spending

    Operational Spending

  112. Slide 112: Base Capital per Kilowatt Investment

    Base Capital per Kilowatt Investment $45 AEP ($42/kw) $40 Southern ($40/kw) Progress ($35/kw) $35 $30 $25 $23 $23 $18 Low Investment $20 $19 $17 $17 $16 $16 $16 $15 $12 $13 $12 $10 $ $5 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 120

  113. Slide 113: Non-Fuel Operations and Maintenance Expenses

    Non-Fuel Operations and Maintenance Expenses $4,000 $3 282 $3,282 $2,995 $3,000 Economic s) Development (in millions $2,338 $2,300 Energy Efficiency and Demand Response $2,000 Pension Outage Base O&M $1,000 $0 2008 2009 2010 2011 121

  114. Slide 114: Non-Fuel O&M Increases

    Non-Fuel O&M Increases Fiscal Year 2011 Incremental fossil and nuclear investments $80 million Additional Nuclear Refueling Outages $30 million Anticipated inflation $80 million Energy efficiency and demand response $45 million programs Economic development $40 million 122

  115. Slide 115: Capital Investment

    Capital Investment $1,400 $1,199 $1,200 Increased investments: $1,000 $911 • Material condition (in millions) Environmental $753 $757 • Asset performance $800 Fossil • Physical and cyber security $600 N l Nuclear • Clean air • Ash management Corporate, $400 Transmission & Security $200 $0 2008 2009

  116. Slide 116: 2011 Capital Projects

    2011 Capital Projects Environmental Kingston - Wet to Dry Ash Conversion PAF 1-2 Particulate Collection WCF 7-8 Particulate Collection Particulate Control Improvement SO3 Mitigation $351 million Base Capital p Physical and Cyber Security Improvements Nuclear Security Upgrades Watts Bar Control Rod R

  117. Slide 117: Key Takeaways (Operational Spending)

    Key Takeaways (Operational Spending) Increased investments to: • Improve material condition • Support S energy efficiency ffi i and dddemand d response • Reduce environmental impacts 125

  118. Slide 118: Capacity Expansion

    Capacity Expansion

  119. Slide 119: Capacity Additions (Cumulative)

    Capacity Additions (Cumulative) 5,000 4,160 4,000 2,830 3,000 MW Watts Bar 2 John Sevier CC Lagoon Creek CC 2,000 1,354 EE & DR 1,000 385 0 2010 2011 2012 2013 127

  120. Slide 120: Capacity Additions

    Capacity Additions 4,000 CumulativeCapacityChanges 2011 2015 2011 2,000 EE&DR MW 1,900MW Nuclear Gas 1,140MW 1,000MW 0 IdledCoal Idled Coal 1,000MW 2,000 128

  121. Slide 121: Capacity Expansion

    Capacity Expansion ($ millions) In- MW 2010 & 2011 Total Service Prior Project j Date Lagoon Creek CC 2011 540 $441 $4 $445 John Sevier CC 2012 878 $389 $314 $818 Watts Bar Unit 2 2013 1,138 $1,419 $635 $2,494 Bellefonte – Unit 1 Phase 2 2018 1 260 1,260 $56* $248 TBD Nuclear Uprates $97 $14 $436 Tr

  122. Slide 122: Bellefonte

    Bellefonte

  123. Slide 123: Supporting Bellefonte Technology Recommendation

    Supporting Bellefonte Technology Recommendation Latest power supply plan shows TVA need for new Need For Power capacity in 2018-2020 timeframe and BLN chosen as least east cost a alternative te at e for o portion po t o oof tthe e need. eed Final Final SEIS completed June 21. Bellefonte 1 is TVA Env

  124. Slide 124: Fiscal Year 2011 Scope

    Fiscal Year 2011 Scope Reduces Project Risk and Preserves Completion Option Initial Engineering Regulatory Reg lator Design & Project Framework Staffing Development $248m Long Lead Asset Preservation Procurement and Facilities Preparation 132

  125. Slide 125: Contracts Provide Flexibility

    Contracts Provide Flexibility Contracts will be entered that provide flexibility to transition project to next phase Several contracts will be entered during Fiscal Year 2011 that include terms and scope beyond Fiscal Year 2011, to preserve the option for the project to move f forward d to the h fi

  126. Slide 126: Financial Health

    Financial Health

  127. Slide 127: Net Book Value per Installed Capacity

    Net Book Value per Installed Capacity $1,200 1,100 1,083 $1,000 973 936 930 914 957 -IOU Average 873 845 794 $800 ollars/kW $600 Do $400 $200 $0 EXC ETR DUK AEP D SO PGN FPL TVA Data Source: 2009 Company 10-K Filings. 135

  128. Slide 128: Fuel and Purchased Power Cost per MWh

    Fuel and Purchased Power Cost per MWh $80 $70 $70 $60 $58 Dollars/MWh h $ $50 $47 $40 $41 -IOU Average $35 $34 $31 $ D $29 $29 $30 $23 $20 $10 $0 FPL D PGN ETR SO EXC DUK TVA AEP Data Source: 2009 Company 10-K Filings. 136

  129. Slide 129: Total Capitalization to Total Assets

    Total Capitalization to Total Assets 0.90 0.81 2006 TVA Level 0.80 0.78 0.78 0.77 0.76 0 75 0.75 0 74 0.74 0.75 - IOU Average 0.73 0.70 0.63 0.60 0.50 Data Source: SO D DUK AEP FPL PGN ETR TVA EXC 2009 Company 10-K Filings. Total capitalization includes debt, equity, and deferred taxes. 137

  130. Slide 130: Financial Guiding Principles

    Financial Guiding Principles Retire debt over the useful life of assets Only issue new debt for new assets Use regulatory U l t ttreatment t t for f specific ifi unusuall events Rate increases as necessary to fund operational spending Evaluate rate actions to avoid significant g rate volatility 138

  131. Slide 131: Debt and Debt-Like Obligations

    Debt and Debt-Like Obligations (in billions) FY10EndingDebt(Forecast) $26.0 New Borrowings: Capacity Expansion $1.5 Kingston 0.2 Environmental Investments 0.4 Refinancings 1.2 TotalNewBorrowings $3.3 Debt Paydown: Nuclear Regulatory Asset ($0.4) Legacy Debt (0.5) 2009 Pension Contribution (0 3) (0.3

  132. Slide 132: Key Takeaways (Financial Health)

    Key Takeaways (Financial Health) TVA has: • Competitively installed asset base • Improved I d and d competitive i i capital i l structure • Sound financial guiding principles • Low cost of capital p • Superior credit rating 140

  133. Slide 133: Risks and Challenges

    Risks and Challenges

  134. Slide 134: Risks and Challenges

    Risks and Challenges Economic uncertainty Weather H d generation Hydro ti Regulatory risks Pension fund 142

  135. Slide 135: Recap and Recommended Action

    Recap and Recommended Action

  136. Slide 136: Operating Budget Expenses

    Operating Budget Expenses ($ millions) Operating Revenue $11,846 Operating Expenses Fuel & Purchased Power 4,344 Operations, Maintenance, and Other 3,437 Interest & Other 1,284 Tax Equivalents 567 Subtotal 9,632 Other Operating Cashflow (154) Operating Cashflow $2,060 144

  137. Slide 137: Capital Budget

    Capital Budget ($ millions) Operating Cashflow $2,060 Nuclear 1,258 Gas 318 E i Environmental l 3 1 351 Transmission 262 Fossil 344 River Operations 77 Nuclear Fuel 304 Other 6 Total Capital Expenditures 2,920 Other Investing 61 Net Cashflow Prior to Financing $(921) 145

  138. Slide 138: Financing

    Financing ($ millions) Net Cashflow Prior to Financing $(921) New Borrowings 3,280 Debt Paydown (2,285) Other Financing (74) Subtotal 921 Shortfall $0 No recommended base rate increase for October 1 146

  139. Slide 139: Plan Summary

    Plan Summary Discussion Topic Key Takeaway Supply and Demand Well Balanced F l and Fuel d Purchased P h d Power P Pi Prices IIncreasing i Operational Spending Asset Investments Capacity Expansion Addressing Future Needs Appropriately Capitalized Financial Health Principles Based Economic and regulat

  140. Slide 140: Recommendation

    Recommendation Approve the 2011 budget that includes: • Operational Spending of $9 $9.632 632 billion Approve Capital spending of $2.920 billion including: • Bellefonte Unit 1 Phase 2 Approve Fuel Contracting Plan including: • Gas G Transportation T i – Texas T Gas G Transmission T i i LLC • Nuclear

  141. Slide 141: Financial Shelf

    Financial Shelf

  142. Slide 142: Topic

    Topic TVA’s authorization to issue power bonds and related interest rate hedges expires at the end of each fiscal year and needs to be renewed for the following year 150

  143. Slide 143: Background

    Background Power bonds are typically issued to: • Refinance existing debt • Fund new capacity Interest rate hedges may ma be used sed to red reduce ce e exposure pos re to fluctuating interest rates Issuing individual bonds requires: • Notification of Board Finance, Rates, and Portfolio Committee •

  144. Slide 144: Recommendation

    Recommendation Approve the issuance of up to $3.5 billion of long-term bonds and the ability to utilize interest rate hedges in fiscal year 2011 152

  145. Slide 145: Rates

    Rates

  146. Slide 146: Topic

    Topic 1. New wholesale rate structures to be effective in April 2011 2. Optional p Rates for Large g Direct-Serve and Distributor-Served Customers from October 2010 to March 2011 3. Revised Fuel Cost Adjustment (FCA) formula in October 2010 to more accurately capture seasonal fuel costs 154

  147. Slide 147: Background

    Background Since 1992, TVA has billed its distributors based on the demand and energy gy usage g of the distributor’s retail customers TVA issued a Rate Change Letter to its distributors on July 8, 2009, to implement new wholesale rate structures, including time-of-use time of use rates TVA has had

  148. Slide 148: Why change TVA's Rates?

    Why change TVA’s Rates? Provide the proper price signals Encourage demand response, energy efficiency, and smart g grid technology gy Provide customers with opportunities to save on their energy costs Keep bills as low as feasible 156

  149. Slide 149: What are Time-of-Use Rates?

    What are Time-of-Use Rates? Time-of-Use (TOU) rates contain pricing differences between seasons of the year and hours of the day TVA has conducted several successful pilot programs with time-of-use rate structures TOU rates provide incentives for customers to reduce peak demand and improve the load

  150. Slide 150: Hourly Energy Costs Vary by Time of Day

    Hourly Energy Costs Vary by Time of Day TVA Hourly Marginal Energy Cost 120 Summer Peak Day 100 ($/MWh) 80 Winter Peak Day 60 40 20 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 158

  151. Slide 151: Our Neighbors Are Addressing These Same Challenges

    Our Neighbors Are Addressing These Same Challenges New technologies will provide customers with the tools to make wise energy decisions Entergy’s TOU rates may help Smart energy use can help manage the you manage number of new power plants built to your electric bill meet peak demand if you can redu

  152. Slide 152: Wholesale Rate Change Proposal

    Wholesale Rate Change Proposal In April 2011, there will be two wholesale rate options: • Wholesale Time-of-Use (TOU) ( ) • Wholesale Demand & Energy (D&E) Segmentation of large customers (> 5 MW) into separately metered rate • TOU Rates with more significant price signals • Seasonal Demand & Energy

  153. Slide 153: October 2010 Changes

    October 2010 Changes With the transition to the new rate structure in April TVA needs to make adjustments to both the April, FCA and the large customer rates in October For the FCA, TVA will implement a change in the g rate more closely formula so that the resulting y reflects seasonal fuel costs Fo

  154. Slide 154: Recommendation

    Recommendation 1. New wholesale rate structures to be effective in April 2011 2. Optional p Rates for large g customers from October 2010 to March 2011 (> 5 MW) 3. Revised Fuel Cost Adjustment formula in October 2010 to reflect seasonal fuel costs 162

  155. Slide 155: Ash and Gypsum Facility Contracts

    Ash and Gypsum Facility Contracts

  156. Slide 156: Topic

    Topic Work required to go to dry handling processes for ash and gypsum and to close all wet impoundments Includes both engineering design services and coal combustion product management services 164

  157. Slide 157: Ash Management Engineering Services Contracts

    Ash Management Engineering Services Contracts Board approval is requested to supplement TVA’s existing contracts for engineering design services for TVA’s ash management program with: St t Consulting Stantec C lti S Services, i IInc. URS Corporation CDM F Federal d lS Services, i IInc. Geosyntec Con

  158. Slide 158: Coal Combustion Product Management Services

    Coal Combustion Product Management Services Board approval is also requested to award individual contracts for Coal Combustion Product management services at various fossil plants to: Ch h Inc. Charah, I Charleston Construction Company, Inc. M Morgan Corporation C ti Trans Ash Inc. Under the propose

  159. Slide 159: Recommendation

    Recommendation Recommend that the Board authorize: • Extending the term and increase the aggregate g g contracts amount of the engineering • Authorize ash handling contracts to be allocated among four contractors 167

  160. Slide 160: People and Performance

    People and Performance 1A

  161. Slide 161: Fiscal Year 2011 Annual Incentive Goals

    Fiscal Year 2011 Annual Incentive Goals

  162. Slide 162: Topic

    Topic Annual Incentive programs form the basis for evaluating and rewarding employees for TVA’s TVA s Fiscal Year 2011 performance For Board Consideration Approve proposed Winning Performance measures and targets for Fiscal Year 2011

  163. Slide 163: Background

    Background Winning Performance provides incentives to TVA employees for Fiscal Year 2011 goals Employees p y are rewarded for meeting g both corporate and organization specific goals Annual incentives for executives are aligned with employees and include specific individual performance goals 171

  164. Slide 164: TVA's Performance Focus

    TVA’s Performance Focus Rates Reputation • Live within our means Environment • Keep bills as low as feasible • Demonstrate proactive environmental leadership Employees Reliability • Cultivate a safe and • Improve plant reliability and organizationally healthy workplace efficiency environment • Maint

  165. Slide 165: Fiscal Year 2011 Annual Incentive Plans

    Fiscal Year 2011 Annual Incentive Plans Proposed Corporate Measures Weight Threshold Target Stretch Equivalent 50% 84.1% 86.0% 87.9% Availability Factor Net Cash Flow $150M less $150M more 50% than Budget Budget than Budget ($ Millions) 173

  166. Slide 166: Recommendation

    Recommendation Approve the proposed Fiscal Year 2011 Annual Incentive Plan measures and goals 174

  167. Slide 167: Audit, Risk, and Regulation

    Audit, A dit Risk, Ri k and d Regulation

  168. Slide 168: Enterprise Risk Management Policy

    Enterprise Risk Management Policy

  169. Slide 169: Topic

    Topic Considered best practice to have a Board approved enterprise risk management policy Management has developed a policy based on sound risk management practices for Board consideration

  170. Slide 170: Background

    Background 2004 TVA Board established the position of Chief Risk Officer 2005 TVA Board established the Enterprise p Risk Management Council TVA risk management practices and approaches have been maturing 179

  171. Slide 171: Background

    Background Enterprise Risk Management Policy • Board adoption is recommended as a best practice to provide appropriate guidance to the organization • Provides overarching guidance for all risk management activities • Establishes risk governance, general processes and roles and responsibilities • Req

  172. Slide 172: Recommendation

    Recommendation Adopt the Enterprise Risk Management Policy Delegate authority to Enterprise Risk Council to amend the ERM Policy only after formal consultation with the B dC Board Committee itt ththatt reviews i TVA’ TVA’s risk i k managementt functions Delegate authority to Enterprise Risk Council

  173. Slide 173: Slide 173

  174. Slide 174: Customer and External Relations

    Customer C t andd External Relations

  175. Slide 175: Chickamauga Marina – Commercial Recreation Lease

    Chickamauga Marina – Commercial Recreation Lease

  176. Slide 176: Lease Location Map

  177. Slide 177: 186

    186

  178. Slide 178: Recommendation

    Recommendation 19-year commercial recreation lease affecting approximately 14.7 14 7 acres in Hamilton County County, Tennessee, on Chickamauga Reservoir 187

  179. Slide 179: Fort Loudon Marina – Commercial Recreation Easement

    Fort Loudon Marina – Commercial Recreation Easement

  180. Slide 180: - Louisville

    a - Louisville a K : 41) 2 NX Lenoir City, SS

  181. Slide 181: 190

    190

  182. Slide 182: Recommendation

    Recommendation 30-year commercial recreation easement and a 30-year nonexclusive access road easement affecting approximately 9.5 acres in Loudon County Tennessee County, Tennessee, on Fort Loudoun Reservoir 191

Tennessee Valley Authority — 08 20 2010 board presentations on 6ix