Aura Energy Ltd · ASX:AEE

Aura Energy — Investor Presentation (October 2022)

28 slides from Aura Energy's investor presentation, October 2022

  1. Slide 1: Developing a world class project portfolio to become a globally significant uranium producer

    Developing a world class project portfolio to become a globally significant uranium producer INVESTOR PRESENTATION ASX:AEE OCTOBER 2022 AIM:AURA

  2. Slide 2: Disclaimer

    DISCLAIMER This document, any attachments and the oral presentation on the slides (together the "Presentation") have been prepared and are being supplied to you by Aura Energy Limited (the "Company") solely for information purposes. The information and opinions in this Presentation or any other mate

  3. Slide 3: Our Significant Assets

    OUR SIGNIFICANT ASSETS TIRIS PROJECT (85% owned) Uranium-Vanadium, Mauritania HÄGGÅN PROJECT (100% owned) DFS1, Mining2 & Environmental3 permits Polymetallic – vanadium, potash, uranium Resource: 56 Mlbs U3O8 @ 270ppm4 Sweden Production Phase 1: 12.4Mlb in 15 years1 Scoping Study Q2 2022 Phase 2 exp

  4. Slide 4: Structural Supply Deficit in Uranium

    STRUCTURAL SUPPLY DEFICIT IN URANIUM Aura is well positioned to grow into servicing uranium supply deficit A TIRIS PHASE 1 B A • Initial target production of 800,000lb U3O8 B TIRIS PHASE 2 • Aiming to increase annual U308 production to 3-5m lbs with 5 years of initial production Not Covered by Suppl

  5. Slide 5: Nuclear & the Green Energy Transition

    NUCLEAR & THE GREEN ENERGY TRANSITION 10% 300% x3 OF THE WORLD’S INCREASE IN THE DEMAND FOR URANIUM ELECTRICITY COMES WORLD’S ELECTRICITY TO INCREASE 3 FOLD FROM NUCLEAR1 DEMAND BY 2030 BASED ON THESE FACTORS ALONE 5 1 - https://world-nuclear.org/information-library/current-and-future-generation/nuc

  6. Slide 6: Nuclear & the Green Energy Transition: Renewables and Nuclear

    NUCLEAR & THE GREEN ENERGY TRANSITION 40% RENEWABLES NUCLEAR ENERGY OF OF THE WORLD’S CANNOT PROVIDE A IS CARBON FREE, CAN ELECTRICITY IS BASELOAD OF POWER DELIVER A BASELOAD OF PRODUCED FROM COAL1 TO REPLACE COAL AND POWER TO REPLACE PRODUCE ONLY 29% OF COAL AND WILL GROW AS THE WORLD’S A PROPORTIO

  7. Slide 7: Tiris Uranium Project: Near Term, Low Cost, Permitted Uranium Production

    TIRIS URANIUM PROJECT: NEAR TERM, LOW COST, PERMITTED URANIUM PRODUCTION COMPETITIVE ADVANTAGE • Near term, low cost, scalable production TIRIS ADVANTAGE TIRIS ADVANTAGE • Rapid growth to maximise value in Mineral Resources • Pipeline to support globally significant uranium production 550% 80% U3O8

  8. Slide 8: Mauritania

    MAURITANIA Positioned to provide geographical diversity to the uranium market • Established Mining Code and Nuclear Law. • Major companies operating in Mauritania including Kinross, BP and Exxon Mobil • Commodities produced include gold, copper iron ore, oil and gas • Good existing infrastructure in

  9. Slide 9: Compelling Tiris Project Fundamentals: Low Cost, Flexible Mining

    COMPELLING TIRIS PROJECT FUNDAMENTALS= LOW COST, FLEXIBLE MINING PROJECT ATTRIBUTES • Shallow flat-lying surface mineralisation (1-5m) • Low-cost mining (free digging) • Simple extraction method (92% in leach)  No drill and blast  No crushing or grinding  Shallow Ore Body THE TIRIS MINING FLEET1

  10. Slide 10: Compelling Tiris Project Fundamentals

    COMPELLING TIRIS PROJECT FUNDAMENTALS Simple upgrade dramatically SIMPLE MODULAR FLOWSHEET reduces process plant size 550% U3O8 upgrade by screening1 80% mass rejected and returned directly to mined pits BENEFICIATION PILOT PLANT COMPLETE1 10 1 ASX Release: “Tests confirm average 550% upgrading of u

  11. Slide 11: Major Milestones Achieved for Tiris

    MAJOR MILESTONES ACHIEVED FOR TIRIS Pilot plant confirms beneficiation Successful upgrade water Resource drilling FEED Study upgrade commenced Exploitation Resource licence upgrade approved Offtake drilling signed program DFS ESIA with completed approved Curzon Resource Resources Maiden upgraded Res

  12. Slide 12: Tiris - Development Pathway

    TIRIS - DEVELOPMENT PATHWAY • Near term production with the Phase 1 Tiris project:  DFS complete “ We aspire to expand the  Mining and Environmental permits - Received resource so that it  Final Investment Decision by Q1 2023 supports expansion of Tiris  First production by H2 2024 Annual U3O8 p

  13. Slide 13: Phase 1 - Catalysts to Uranium Production

    PHASE 1 - CATALYSTS TO URANIUM PRODUCTION • Complete Infill drilling to target • Phase 1 FEED Study • Commission • First shipment Resource Upgrade completed plant of Yellowcake • 10,000m drilling program • Revised Mineral Resource Estimate – • Phase 1 Decision to Mine • Commence Increase M&I resourc

  14. Slide 14: Compelling Tiris Project Fundamentals

    COMPELLING TIRIS PROJECT FUNDAMENTALS Tiris Phase 1 is a compelling low-cost project, as per 2021 Feasibility Study. NEAR TERM URANIUM PRODUCTION – PHASE 1 LOW CAPITAL & OPERATING COSTS • 1.25Mtpa for 12.4Mlb U3O8 over 15 • Tiris project Phase 1 years. • CAPEX: US$74.8M • C1 cost: $25.43/lb U3O8 • A

  15. Slide 15: Phase 2 – Maximise Resource Value

    PHASE 2 – MAXIMISE RESOURCE VALUE • Proven historic upgrade from inferred to Measured and TIRIS URANIUM RESOURCE3 Indicated 56 Million lbs U3O8 @ 253 ppm • Approximately 3-5 Mlbs U3O8 found per square km of 18.2 million pounds V2O5 @ 82 ppm continuous mineralisation1. Table 1 - Following the latest

  16. Slide 16: Phase 2 – Maximise Resource Value

    PHASE 2 – MAXIMISE RESOURCE VALUE Drilling program completed in Q4 2022 aims to increase proportion of Measured and Indicated Category.1 • 10,000m infill drilling program. (complete) • Revised Mineral Resource Estimate with increase M&I. • Revised Mineral Reserve to support Phase 2 Mine Plan • Testi

  17. Slide 17: Tiris Modular Design for Simple Expansion

    TIRIS MODULAR DESIGN FOR SIMPLE EXPANSION • 12.5% of Phase 1 Capital Estimate1 for equipment rated for up to 3.0Mlb pa U3O8 production. PHASE 1 PHASE 2 • Modular design of beneficiation and leach circuits Phase 2 Phase 2 for capital efficient expansion. Phase 1 Beneficiation Beneficiation Beneficiat

  18. Slide 18: Tiris Development Outline

    TIRIS DEVELOPMENT OUTLINE Increasing Production U3O8 production expansion to fit resources First phase Uranium • Capital efficient production • Low cost • Early cashflow - 2025 • Design max of 3.5Mlb • Low CAPEX pa U3O81 Grow Tiris Resources • Increase proportion M&I • Exploration 2025 2027 18 1 ASX

  19. Slide 19: Development Schedule – Tiris News Flow

    DEVELOPMENT SCHEDULE – TIRIS NEWS FLOW Program Completed Underway Q1 2022 Q2 2022 Q3 2022 Q4 2022 Q1 2023 Phase 1 Tiris Project Confirmation test work1 Y Engage EPCM Consultant2 Y FEED Study Y Decision to Mine Value engineering V2O5 Resource3 Y V2O5 Test work Y V2O5 Circuit Sustainability GHG Emissi

  20. Slide 20: Environmental, Social & Governance

    ENVIRONMENTAL, SOCIAL & GOVERNANCE ENVIRONMENTAL • Scope 1 & 2 Greenhouse Gas (GHG) emissions report complete clearly defining a Net Zero Emission Pathway for the Project. • Total baseline GHG emissions of 16,600 tCO2e per annum, representing approximately 0.15% of the total GHG emissions of Maurita

  21. Slide 21: Häggån Vanadium Project

    O LU ” fe) ra ou = = a q Z > 2 xf HAGG

  22. Slide 22: Häggån High-Grade Vanadium Project

    HÄGGÅN HIGH-GRADE VANADIUM PROJECT PROJECT HIGHLIGHTS • 100% owned 15.2 Billion lb Global Vanadium Resource1 • 1.1 Billion lb High-Grade V2O5 Zone Sweden • 124 Mt @ 0.43% V2O5 • Shallow Mine 20 to 100m • Scoping Study costs complete ADDITIONAL INITIATIVES • Swedish Gov driving Green Metal transition

  23. Slide 23: Aura's Gold Assets

    AURA’S GOLD ASSETS ARCHAEAN GREENSTONE GOLD • Archaean Greenstone Gold represents one of the last great opportunities in the world for exploration on a single large tract of Archaean greenstone geology. • With the 20 Moz operating Kinross-owned Tasiast Mine operating just 36 Km away this belt is hig

  24. Slide 24: Corporate Snapshot

    CORPORATE SNAPSHOT KEY METRICS BOARD AND MANAGEMENT ASX Code AEE Phil Mitchell Non-Executive Chairman AIM Code (LSE) AURA David Woodall Managing Director & CEO Shares on Issue 530 million Patrick Mutz Non-Executive Director Share Price (19 October ‘22) ASX:AEE - A$0.27 Warren Non-Executive Director

  25. Slide 25: Contact

    CONTACT David Woodall Managing Director and CEO dwoodall@auraee.com Jane Morgan Investor & Media Relations jm@janemorganmanagement.com.au +61 405 555 618 ASX:AEE AIM:AURA

  26. Slide 26: Peer Comparison

    PEER COMPARISON Aura Bannerman Energy Boss Energy Global Atomic Energy Fission Denison Paladin Energy NexGen Stock Code ASX:AEE ASX:BOE TSE:GLO ASX:BMN TSE:FCU NYSE:DNN ASX:PDN TSE:NXE Mkt cap (AU$)* $101m $803m $603 m $282m $603m $1,410m $2,210m $3,260m Project Tiris Honeymoon Dasa Etango PLS Wheel

  27. Slide 27: Appendix - Tiris

    APPENDIX - TIRIS Table 4: Tiris Project Capital Cost Summary Description Cost (U$M) Process Plant $45.10 Infrastructure $8.58 EPCM $6.57 Owner's cost $3.00 Contingency $4.92 Total Capital Cost 74.8 Table 5: Tiris Project Operating Cost Summary Category US$/lb U3O8 APPENDIX Contract Mining 7.16 Labou

  28. Slide 28: Near Term, Low Cost, Permitted Uranium Production

    NEAR TERM, LOW COST, PERMITTED URANIUM PRODUCTION Tiris Uranium Project • Shallow mineralisation – from surface to depth of 1-5m • Free digging – Low cost, flexible mining • Upgradability – 550% upgrade with 80% mass rejection1 • Scalable2 • 20% of Mineral Resources used in Stage 1 • Modular design

Aura Energy — Investor Presentation (October 2022) on 6ix