Indiana Resources Limited · ASX:IDA

Indiana Resources — 121 Conference (March 2022)

15 slides from Indiana Resources's conference presentation, Mar 22, 2022

  1. Slide 1: High-Grade Gold, Gawler Craton, South Australia

    For personal use only High-Grade Gold Gawler Craton South Australia March 2022 Investor Presentation – 121 Conference

  2. Slide 2: Disclaimer

    Disclaimer For personal use only This Presentation has been prepared by Indiana Resources Limited (Indiana). No party other than Indiana that such information or statements will prove to be accurate and actual results and future events could differ has authorised or caused the issue of this document

  3. Slide 3: Corporate Snapshot

    Corporate Snapshot Indiana Resources (ASX:IDA) For personal use only Corporate 439,510,821 51,200,000 ~A$27M A$0.051 - $0.095 A$2.2m Structure Shares on Issue Options on Issue Market Cap 52 week low-high Cash 21 Mar 2022 (A$0.059) As of 31 Dec 2021 Board & Management Shareholder Distribution Bronwyn

  4. Slide 4: Investment Highlights

    Investment Highlights 5,713km² District Scale Ground Position in the Central Gawler Craton For personal use only 1. Multiple advanced and early-stage targets proximal to existing gold mines and major gold discoveries 2. Early exploration success demonstrates ‘district scale’ potential of the Lake La

  5. Slide 5: Portfolio Summary

    Portfolio Summary High-Grade gold targets in an under-explored province For personal use only Indiana Resources ASX:IDA 5

  6. Slide 6: Large Strategic Ground Position

    Large Strategic Ground Position Exciting proven but under-explored gold province For personal use only • 5,713km2 with tightly held surrounding tenure • Proximal to existing gold mines and major gold discoveries • Tunkillia Gold Project (965,000 ounce resource1) adjoins the southern edge of the tene

  7. Slide 7: Under-explored tenement package

    Under-explored tenement package Sparse, historic drilling highlights significant exploration upside1 For personal use only • Prospective but under-explored • Pipeline of drill ready targets, including: • Minos • Boomerang • 12m @ 10.36 g/t Au • 4m @ 5.44 g/t Au • 24m @ 2.18 g/t Au • 2.0m @ 10.5 g/t

  8. Slide 8: Lake Labyrinth Shear Zone

    Lake Labyrinth Shear Zone Fertile structure with 50km strike, under-explored For personal use only Indiana key exploration outcomes 2021 • +12,000m of RC and Diamond drilling • 4,500m Aircore drilling • Heritage survey over portions of the LLSZ • Calcrete sampling Initial drilling at Minos and Ariad

  9. Slide 9: Minos Drilling Highlights

    Minos Drilling Highlights 49 RC/DD drillholes completed for 7,953m For personal use only Results confirm geological interpretation Reinforces LLSZ is a significant gold bearing system1 • 21m @ 8.43g/t Au from 176m including 1m @ 159g/t Au • 35m @ 7.08g/t Au from 29m including 16m @ 13.12g/t Au • 20m

  10. Slide 10: Minos Gold Mineralisation

    Minos Gold Mineralisation Strong, coherent zones of gold mineralisation For personal use only ASX:IDA 10

  11. Slide 11: Ariadne Drilling Highlights

    Ariadne Drilling Highlights 12 RC holes completed in October for 1,379m For personal use only Maiden RC programme focused on confirming the historical results and broadening exploration on LLSZ1 • 10m @ 2.24 g/t Au from 9m including 1m @ 13.4 g/t Au • 5m @ 3.59 g/t Au from 49m • 9m @ 2.61 g/t Au fro

  12. Slide 12: Harris Greenstone Domain

    Harris Greenstone Domain Historic drilling highlights significant exploration upside1 For personal use only • Prospective Archaean greenstone belts • Native Title Agreement registered March ‘22 • 120km interpreted strike length of greenstone belt within • Technical review underway to refine and prio

  13. Slide 13: AU$127m Compensation Claim

    AU$127m Compensation Claim United Republic of Tanzania – International Centre for Settlement of Investment Disputes For personal use only • AU$127m compensation claim against Tanzania for illegal expropriation of Ntaka Hill Nickel Project • Arbitration commenced April 2021 – scheduled to complete Fe

  14. Slide 14: Near Term Work Plans

    Near Term Work Plans Aggressive exploration strategy to drive value creation in 2022 For personal use only • Multiple drilling programmes planned for South Australian gold portfolio in 2022 starting with further RC drilling at Minos in Q2 2022 • Upcoming RC drill programme at Minos to include 15 dri

  15. Slide 15: Contact

    For personal use only Contact Executive Chair: Bronwyn Barnes Technical Director: Felicity Repacholi-Muir info@indianaresources.com.au www.indianaresources.com.au Suite 3, 339 Cambridge St Wembley WA 6014 ASX:IDA

Indiana Resources — 121 Conference (March 2022) on 6ix