Slide 1: Corporate Presentation July 2016
Corporate Presentation July 2016 1 Lydianinternational.co.uk | TSX:LYD
Slide 2: Cautionary Statements
Cautionary Statements Certain information contained in this presentation, including any information relating to Amulsar's expected future performance, is "forward looking". All statements in this presentation, other than statements of historical fact, that address events, results, outcomes or develo
Slide 3: Compelling Asset; Ready to Build
Compelling Asset; Ready to Build Amulsar Gold Project Large Scale Deposit Measured + Indicated Resources 3.0 M gold ozs (122 Mt @ 0.77gpt) Inferred Resources 2.0 M gold ozs (106 Mt @ 0.59gpt) Low Cost, High Gold Recovery, and Low Strip Ratio Conventional open pit mining and heap leach processing Tot
Slide 4: Achievements: Getting to the Starting Line
Achievements Getting to the Starting Line Completed value engineering resulting in a $56M CAPEX reduction and 17% decrease in AISC • Key to supporting project financing package Secured $325 million project financing • $185 million senior secured debt • $80 million equity at premium • $60 million cap
Slide 5: Path to Construction: Ramping Up to Production
Path to Construction Ramping Up to Production Began • Land • Engineering • Construction management systems pre-construction • Early works activities gearing up for • Government relations • Sustainability full-scale construction • Equipment financing • Infill drilling 5
Slide 6: Large Scale, Low-Cost, and Open Upside
Large Scale, Low-Cost, and Open Upside Large Scale – Drawn from Current Reserves Only Total gold recovered (initial 10-year life) – ozs 2,113,000 Average annual gold production – ozs 211,000 Low-Cost – Grade, Oxide Ore, Topography Key Drivers Average gold grade – gpt 0.78 Average gold recovery – % 8
Slide 7: Robust Economics
Robust Economics $1,150 $1,250 Financial Results – Unleveraged After Tax Gold Gold NPV – 0% discount $577,000,000 $718,000,000 NPV – 5% discount $338,000,000 $438,000,000 IRR – % 21.6 25.7 7
Slide 8: Sizable Upside within Reserve Pits
Sizable Upside within Reserve Pits 26 Mt Inferred Resource in Pits & Open 8
Slide 9: Secured Construction Financing
Secured Construction Financing Multi-Tranche Financing Minimizes Equity Dilution Minimum Amounts Summary Description1 ($ million) • LIBOR + 6.5% maturing September 30, 2021 $160 Term Loan 2 • Interest and principal holiday until June 30, 2018 • LIBOR + 9.50% maturing September 30, 2020 $25 COF 2 • I
Slide 10: Supportive Mining Jurisdiction
Supportive Mining Jurisdiction Success Requires Collaboration at All Levels Alignment with national interests Reduce ongoing high unemployment Reverse trend of declining FDI Local community support Well attended and constructive participation in public hearings Cooperative on reaching community land
Slide 11: Near and Mid-term Catalysts
Near and Mid-term Catalysts Focus on Construction 2016 2017 2018 • Land acquisition & • Project construction • Plant commissioning conversion –Haul roads • Ore to pad • Project team build-out –Crushing/screening plant • First gold pour • Equipment financing –Conveying system • Ramp-up of gold • Key
Slide 12: Comparable Development Stage Companies
Comparable Development Stage Companies Targeting to Re-rate Through Construction Market Capitalization $250 $414 $2,653 $792 $519 $2,017 CAD$ P/NAV 0.47x 0.62x 0.90x 0.85x 0.87x 1.07x Asset Name Amulsar Volta Grande Brucejack Hardrock Yaramoko Morelos Asset Location Armenia Brazil British Columbia O
Slide 13: Board of Directors
Board of Directors Development-Oriented; Independent, Diverse Experience Gordon Wylie Non-Executive Director Howard Stevenson President, CEO & Director (Chair) 32 yrs mining experience 25 yrs global mining experience AngloGold-Ashanti Global Alacer Gold President & COO Exploration Manager Meridian &
Slide 14: Lydian International Corporate Summary
Lydian International Corporate Summary Symbols Ordinary Shares LYD Publicly-trading Warrants LYD.WT Share Capital Ordinary Shares (pre-EBRD placement) 666 million Publicly-trading Warrants 99 million Private Warrants 5 million Market Capitalization C$256 million Cash on-hand, sourced from $125 milli
Slide 15: The Value Proposition
The Value Proposition 2016/2017 Transformational Years Path forward for construction to becoming a mid-tier gold producer Financed to execute on the construction strategy Strong government and community support Low all-in sustaining costs Robust mining project with upside potential 15
Slide 16: Lydianinternational.co.uk | TSX:LYD
16 Lydianinternational.co.uk | TSX:LYD
Slide 17: Large Scale Oxide Deposit: Mineral Reserves & Resources Statement
Large Scale Oxide Deposit Mineral Reserves & Resources Statement Tonnes (M) Au Grade (g/t) Ag Grade (g/t) Contained Au (Moz) Contained Ag (Moz) Mineral Resources Measured + Indicated 122.4 0.77 3.5 3.0 13.9 Inferred 106.2 0.59 2.6 2.0 9.0 Mineral Reserves Proven + Probable 96.7 0.78 3.6 2.4 11.3 Lar