Fresnillo Plc · LSE:FRES

Fresnillo — Denver Gold Forum 2010

15 slides from Fresnillo's conference presentation, Sep 21, 2010

  1. Slide 1: Fresnillo plc Denver Gold Forum

    Fresnillo plc Denver Gold Forum Jaime Lomelín, CEO September 21, 2010

  2. Slide 2: Disclaimer

    Disclaimer This document includes statements that are, or may be deemed to be, “forward-looking statements”. These forward-looking statements can be identified by the use of forward-looking terminology, including the terms “believes”, “estimates”, “plans”, “projects”, “anticipates”, “expects”, “inte

  3. Slide 3: Agenda

    Agenda Introduction H1 2010 Highlights Operations and Development Projects Financial Highlights Conclusions Q&A 2

  4. Slide 4: Introduction

    Introduction Aim to produce 65m oz of silver and over 400k oz of gold by 2018 Fresnillo, the world’s largest primary silver producer and Mexico’s second largest gold producer Highly experienced management team with proven track record in exploration, development, construction and operation Four oper

  5. Slide 5: H1 2010 Highlights – Investing in our future

    H1 2010 Highlights – Investing in our future Operations Record attributable silver and gold production of 19.1m oz and 176.4k oz respectively Soledad-Dipolos at full capacity Projects Saucito construction on track; start up in 1H11 Ciénega expansion advancing according to plan San Julián and Orisyvo

  6. Slide 6: Operations - Maximising the potential of existing operations

    Operations - Maximising the potential of existing operations Fresnillo–Underground Ciénega–Underground Herradura–Open pit Soledad & Dipolos–Open pit H1 2010 Attributable production Vs. H1 2009 Silver: 17.8 m oz 1.6% 0.7 m oz -10.0% 0.1 m oz 40.2% 0.0 m oz Gold: 11.5 k oz -8.7% 55.8 k oz 17.1% 79.6 k

  7. Slide 7: H1 2010 Financial Highlights – A sterling performance

    H1 2010 Financial Highlights – A sterling performance Outstanding metal prices average realized silver price US$17.93 per oz, up 28.8 average realized gold price US$1,171.9 per oz, up 27.4% Revenue1 of US$605.7m, up 59.9% EBITDA up 92.7% to US$392.0m, margins increased to 64.7% from 53.7% Net profit

  8. Slide 8: On track to produce 65m oz of silver and over 400k oz of gold by 2018

    On track to produce 65m oz of silver and over 400k oz of gold by 2018 Soledad & Dipolos Estimated project delivery programme Commencement of commercial production in January 2010 Project 2010 2011 2012 2013 2014 Contributing 15.6% of the attributable gold production Soledad - Expanding to 130 k ounc

  9. Slide 9: Ciénega Expansion

    Ciénega Expansion 8

  10. Slide 10: Saucito Project

    oO J 2 Cc UV WwW oO Ww to Project Sauc FRESNILLO plc LEADERSHIP. QUALITY. SUSTAINABLE GROWTH.

  11. Slide 11: Fresnillo District - Deliver growth through development projects and expansions

    Fresnillo District - Deliver growth through development projects and expansions Minera Saucito Positive drilling results on the Jarillas West and Santa Natalia Southeast veins Saucito shaft commissioned and fully operational Jarillas shaft at 208 m depth of 630 m All equipment for the mill has been

  12. Slide 12: Herradura and Ciénega Districts

    Herradura and Ciénega Districts Noche Buena Located 24 km from Herradura mine In-house resource calculation 627k oz gold with grade 0.45 g/t and low stripping ratio Drilling and engineering studies continue Prefeasibility study will be concluded in 2010 All the surface land required has been secured

  13. Slide 13: Advanced Exploration Prospects – To become new operating districts

    Advanced Exploration Prospects – To become new operating districts Orisyvo Large porphyry related gold system Drilling extended the upper north and west oxide gold deposits and the deeper central sulphide zone Exploration potential is open to the north and east Construction of a 1.5 km exploration a

  14. Slide 14: Creating value through leadership, quality and sustainable growth

    Creating value through leadership, quality and sustainable growth Zero fatalities and focus on health and safety performance Maintaining positive and productive relations with the labour force and communities where we operate Commitment to growth and the development of further world-class assets We

  15. Slide 15: 2010 Outlook

    2010 Outlook Silver production expected to be in line with 2009 (38 m oz) Gold production expected to be 340,00 oz reflecting Soledad-Dipolos start-up Saucito construction and Ciénega’s expansion on track, with planned start up in H1 2011 Record Fresnillo’s exploration budget, US$119.2 million with

Fresnillo — Denver Gold Forum 2010 on 6ix