Slide 1: Community Information Evening Narrabri
Community Information Evening Narrabri January 22 2013
Slide 2: What is coal seam gas?
What is coal seam gas? Coal seam gas is natural gas formed by the same processes that produce coal Over millions of years, plant matter becomes peat and eventually is buried and hardens to become coal Gas and water are also formed during this process as the coal is buried and heated The gas
Slide 3: Where is it found – Narrabri area
Where is it found – Narrabri area Not to scale 3
Slide 4: Upcoming Exploration
Upcoming Exploration
Slide 5: Six month work program - Narrabri area
Six month work program - Narrabri area Jan PAL 2 1 workover 2013 PEL 238 1 well decommissioned Queensland PEL 6 Feb PAL 2 1 workover PEL Moree 2013 PAL 2 2 decommissions 427 New South PEL 1 1 workover Wales PEL 428 PEL 238 Mar PEL 238 1 corehole PPL 3 Narrabri PEL 2013 3 decommissions 434 PAL 2 1 wo
Slide 6: Proposed upcoming work program
Proposed upcoming work program Decommissioning of wells (PA or plug and abandonment) – Bibblewindi 1 and 2 and workover of Bibblewindi 12 and 13 Exploration in the Narrabri area restarting: - Seismic surveys - in the Pilliga area - Core hole drilling - Bibblewindi 30, Dewhurst 8A - Pilot wells –
Slide 7: The process of decommissioning (PA)
The process of decommissioning (PA) An abandonment includes filling the entire wellbore from bottom to surface with cement in cement ‘plug’ stages All hole ‘plugs’ are left to set and tagged to confirm placement before the next one is pumped Once a cement ‘plug’ top is inside casing, it is lef
Slide 8: Seismic surveys
Seismic surveys To be carried out in and around the Pilliga Specially equipped seismic vehicles drive through an area Soundwave equipment records and images the geological formations below the surface Where possible the surveys are conducted along roads or fence lines Disturbance is minima
Slide 9: Seismic surveys
Seismic surveys A seismic survey underway 9
Slide 10: Core holes
Core holes Core holes are drilled to investigate: - the depth of the coal seams - gas content - gas composition - how easily gas will flow Drilling takes between two and six weeks No water or gas is produced The core hole is then sealed with cement Core hole site rehabilitated Rehabilitate
Slide 11: Core holes
Core holes A steel pipe (surface conductor) is inserted into the shallow sediments It is cemented into place Another steel pipe (surface casing) is then run inside the first pipe, through the shallow aquifers Cross section of surface conductor and surface It is cemented in place to protect c
Slide 12: Pilot or appraisal wells
Pilot or appraisal wells Pilot wells are drilled to: - Measure flow rates of gas and water - Analyse the composition of gas and water - Test the commercial viability of producing gas Shallow aquifer monitoring bores (SAMBs) can be put in place to monitor groundwater before any pumping from coal
Slide 13: Pilot or appraisal wells
Pilot or appraisal wells Bibblewindi West 25 pilot well near Narrabri 13
Slide 14: Pilot or appraisal wells
Pilot or appraisal wells Pilot well at Kahlua near Gunnedah 14
Slide 15: How we extract the gas
How we extract the gas Wellhead Wellbore design, construction and operations are heavily regulated in Australia Water Gas A steel pipe (surface conductor) is inserted into the surface layers and cemented in place to give stability Pilliga Sandstone A second steel pipe (surface casing) is run ins
Slide 16: Lateral drilling
Lateral drilling Exploration has shown the natural fractures in the coal in the Narrabri area make it suited to lateral drilling Lateral drilling accesses more of the coal seam by drilling horizontally More than one coal seam targeted from one set of surface facilities 16
Slide 17: Example MAR scheme
7 Srtké ferry NARRABRI GAS PROJECT BOHENA CREEK INFILTRATION GALLERY AND MONITORING SCHEMATIC th We have the energy.
Slide 18: Comments or questions?