Antelopus Selan Energy Ltd · NSE:ANTELOPUS
Antelopus Selan Energy — Selan Exploration Technology — Q1 FY2026 Earnings Presentation
12 slides from Antelopus Selan Energy's earnings presentation, Aug 12, 2025
Slide 1: Intimation regarding Presentation on Quarter 1 FY 2025-26
SELAN E X P L O R A T I O N TECHNOLOGY LIMITED BSE Ltd. National Stock Exchange of India Ltd. 25th Floor, P.J. Towers 5th Floor, Exchange Plaza, Dalal Street Bandra – Kurla Complex Mumbai - 400 001 Bandra (E), Mumbai – 400 051 Scrip Code : 530075 Scrip Code : Selan (Equity) August 12, 2025 Dear Sir,
Slide 2: Q1 FY'26 Results
Q1 FY’26 Results Selan Exploration Technology Limited August 2025 1
Slide 3: Q1 FY'26: Strategic Updates
Q1 FY’26: Strategic Updates 1 Merger with AEPL completed – Provides access to a strong Oil and Gas Merged entity to be renamed as asset portfolio “Antelopus Selan Energy Limited” 2 Production commenced from KG Basin ‘Dangeru’ field – Looking beyond Cambay basin Drilling of 2 new wells completed in K
Slide 4: Q1 FY'26 Financial Updates
Q1 FY’26 Financial Updates Merged and restated financials Production & Total Income EBITDA and EBITDA Margins Production in boepd and Revenue in INR millions EBITDA and INR millions Production Total Income EBITDA EBITDA Margins Strong consistent EBITDA Margins despite lower Oil and Gas prices 1099 1
Slide 5: Forward Plan: Bakrol, Karjisan & Cambay Fields
Q1 FY’26 Forward Plan: Bakrol, Karjisan & Cambay Fields 1,400.0 1,200.0 1,000.0 800.0 boepd 600.0 400.0 200.0 - Q1'24 Q2'24 Q3'24 Q4'24 Q1'25 Q2'25 Q3'25 Q4'25 Q1'26 Bakrol Lohar Karjisan Cambay FY 2024 FY 2025 FY 2026 onwards Established 15 month sustained production levels before encountering natu
Slide 6: Forward Plan: KG Basin
Q1 FY’26 Forward Plan: KG Basin Block Area ▪ 144 Sq. Km Contract Area, awarded in DSF Bid Round III. Contract Area consists of 2 fields ‘Dangeru’ and ‘Mukkamala’ ▪ Earlier operators drilled 4 wells, tested volumes (Pre – Frac) @ c.1.5 mmscfd and c.0.5 mmscfd from ‘Mukkamala’ and ‘Dangeru’ fields res
Slide 7: Forward Plan: Assam Basin – Duarmara Field
Q1 FY’26 Forward Plan: Assam Basin – Duarmara Field Drilling Rig MDPE Pipeline markings Well Drilling Evacuation infrastructure Commercial Sales ▪ c. 2000 m of the 4000 m well drilled ▪ Well testing unit for processing ▪ MDPE pipeline connected to existing produced Oil and Gas, in place AGCL network
Slide 8: Drilling Plan
Drilling Plan Continuous drilling across all our fields Onshore Rig # 1 Drilling Karjisan Karjisan Karjisan Karjisan Bakrol Bakrol Bakrol Bakrol Drilling + Fracking Onshore Rig # 2 BK: Bakrol Duarmara Cambay Bakrol Bakrol Bakrol Bakrol Bakrol Bakrol KJ: Karjisan Karjisan Duarmara Cambay Bakrol Dange
Slide 9: Financial Review
Financial Review EXPLORATION TECHNOLOGY LIMITED
Slide 10: Statement of Profit and Loss
Statement of Profit and Loss Merged and Re-stated Financials Q4 FY’25 Q1 FY’25 Particulars (In INR Cr.) Q1 FY’26 (Restated) (Restated) Average Sales (boepd) 1063 boepd 1177 boepd 1099 boepd A INCOME Revenue from Operations 51.75 63.15 65.05 Less: Profit Petroleum paid to GOI 1.12 1.43 1.59 Revenue f
Slide 11: Glossary of Terms
Glossary of Terms: [I] SELAN EXPLORATION TECHNOLOGY LIMITED AEPL: Antelopus Energy Private Limited AGCL: Assam Gas Company Limited Boepd: Barrels of Oil Equivalent Per Day GOI: Government of India KG: Krishna Godavari Mmscfd: million standard cubic feet per day MDPE: Medium Density Polyethylene
Slide 12: Disclaimer
[I] Disclaimer SELAN EXPLORATION TECHNOLOGY LIMITED No representation or warranty, express or implied, is made as to, and no reliance should be placed on, the fairness, accuracy, completeness or correctness of the information or opinions contained in this presentation. Certain statements made in thi