Enertopia Corp. · CSE:ENRT

Enertopia — Investor Presentation (May 2022)

12 slides from Enertopia's investor presentation, May 2022

  1. Slide 1: May 2022 WT Lithium Presentation

    May 2022 WT Lithium Presentation 1

  2. Slide 2: Disclaimer

    Disclaimer This presentation includes forward-looking statements within the meaning of Section 27A of the Securities Act of 1933, as amended, and Section 21E of the Securities Exchange Act of 1934, as amended. Statements which are not historical facts are forward-looking statements. The Company make

  3. Slide 3: Project Location Nevada State Map

    Project Location Nevada State Map Enertopia currently controls 100% of approximately 1,760 Acres of lode claims in Big Smoky Big Smoky Valley Lithium Project Valley, NV no royalties owing Clayton Valley Lithium Project 3

  4. Slide 4: Enertopia West Tonopah Lithium Project

    Enertopia West Tonopah Lithium Project West Tonopah Project location 4 miles from Tonopah, project has immediate highway and grid power access. 1,760 contiguous acres prospective for Lithium claystone exploration. Shallow drilling has confirmed large area of claystone underlies the project. Enertopia

  5. Slide 5: West Tonopah Project June 2022 Proposed Drill Locations

    West Tonopah Project June 2022 Proposed Drill Locations West Tonopah Project location 4 miles from Tonopah, project has immediate highway and grid power access. The proposed drill holes 88 load claims covering 1,760 are shown as red dots on contiguous acres prospective the claim map to the left. for

  6. Slide 6: Proposed DH22-02 Location Proposed DH22-17 Location

    Proposed DH22-02 Location Proposed DH22-17 Location Looking west Li claystone pit in foreground Looking east Tonopah in the background 6

  7. Slide 7: Enertopia West Tonopah Lithium Project: Next Steps Drilling

    Enertopia West Tonopah Lithium Project NEXT STEPS “DRILLING” The Company has received BLM approval for up-to 20 drill holes to a depth of 125ft each. The drilling program is expected to start during the week of June 7, 2022. This first phase exploration program will use the current road infrastructur

  8. Slide 8: Lithium the driver of Battery Metals Demand For Our Clean Energy World

    Lithium the driver of Battery Metals Demand For Our Clean Energy World Source Albemarle Investor Day Dec 12, 2019 8

  9. Slide 9: Advisory Consultant

    ADVISORY CONSULTANT Dr. John Thomas — Technical Advisor Dr. Thomas is a professional engineer, and holds a B.Sc., an M.Sc., and a Ph.D. in chemical engineering from the University of Manchester in the United Kingdom. He also received a diploma in accounting and finance from the U.K. Association of Ce

  10. Slide 10: Management

    MANAGEMENT President, CEO and Director: Robert McAllister Mr. McAllister has served as President of Enertopia since November 2007 and as a Director since April 2008. Mr. McAllister was responsible for Investor Relations and Corporate Communications for publicly traded mining and oil & gas listed com

  11. Slide 11: President's Message

    President’s Message “We are very happy with our accomplishments as we moved the Company forward in 2022 on both the Project and Technological side. We look forward to bigger steps in 2022 and beyond ” Stated President Robert McAllister The Qualified Person: The technical data in this presentation hav

  12. Slide 12: Contact Information

    CONTACT INFORMATION Share structure President & CEO Robert McAllister Phone: 250-870-2219 Share Structure May 2022 Email: mcallister@enertopia.com Issued and Outstanding 155,116,088 Head Office Address: 1873 Spall Road # 18 Warrants 4,973,369 Kelowna, BC V1Y 4R2 Options 7,900,000 Fully Diluted 167,989

Enertopia — Investor Presentation (May 2022) on 6ix