Applied Digital Corporation · NASDAQ:APLD

Applied Digital — Investor Presentation (October 2023)

17 slides from Applied Digital's investor presentation, Oct 12, 2023

  1. Slide 1: Demands of Real Estate Development

    Leading Provider of Next-Gen Datacenters for High-Performance Computing Applications October 2023 Demands of Real Estate Development

  2. Slide 2: Disclaimer

    DISCLAIMER This presentation has been designed to provide general information about Applied Digital Corporation (“APLD” or the “Company”). Any information contained or referenced herein is suitable only as an introduction to the Company. The information contained in this presentation is for informat

  3. Slide 3: Introduction: Brad Barton, EVP of Real Estate & Development

    Brad Barton EVP of Real Estate & Development • Husband, Father of 3 boys, outdoors, sports. • Have executed over $2.5 billion in mission critical datacenter projects in the US and Mexico • More recently, delivered multiple hyperscale, wholesale, and colocation datacenters totaling over 450 megawatts

  4. Slide 4: Planning – Lessons Learned From the Past

    The entire building went up in just over a year, under budget (at $40 million) and well ahead of schedule. Source: Rare Historical Photos 2023 The Key Success To Constructing the Empire State Building: ü Efficient Design ü Experienced Workforce ü Assembly Line Construction ü Financial Incentives ü I

  5. Slide 5: Today's Challenges

    Today's Challenges And this is the gap The means and methods gap. This gap also overlaps with the Spearin Gap; legally defined as neither the architects nor the contractor's typical responsibility and, by default, falls to 1] the owner - often unaware or lacking Construction J the experience to addr

  6. Slide 6: Design Planning – The Key To Success

    Design Planning – The Key To Success Datacenter design is an iterative process involving input from internal stakeholders and OEMs. UNCERTAINTY / PATTERNS / INSIGHTS CLARITY / FOCUS Research and Exploration Concepts and Schematic Finished Design Programming 2023 J F M A M J J A S O N D Schematic Des

  7. Slide 7: Colocation Datacenters: Datacenter Complications

    Colocation Datacenters Datacenter Complications Ø Lots of power in, lots of heat out- meanwhile, plan for tech not invented yet, plan for local jurisdictions , etc.) Ø SLAs have improved over 20 years, emphasizing reliability and performance. Ø APLD is seeing tenants moving away from 99.9999% = lots

  8. Slide 8: Internet and Datacenters

    Internet and Datacenters! Early 90's Birth of "IT Closets" within the 4 walls of company's business Mid 90's to early 2000s ."com" surge – 24x7 operation DCaS (Datacenter as a service) AWS introduced cloud computing Early 2000's DLR Went public $12 Average deal size: • Average deal size for a lease

  9. Slide 9: Design

    Bridging the Gap DESIGN RESEARCH

  10. Slide 10: Design Process

    Activity 1 2 3 4 5 6 7 8 9 Produce suspended floor calculations 1 1 x x Produce suspended floor plans and sections 2 x 2 x x Pad foundation calculations 3 x 3 Produce pad foundation plans & sections 4 x x 4 Concrete basement calculations 5 x x 5 Produce basement concrete basement layout 6 x x x 6 x

  11. Slide 11: Design to Build – Not the Other Way Around

    Bridging the Gap Design to Build – not the other way around: Choose Equipment & Materials (with input on lead time, skilled labor availability, other factors) then design to it. Vendor 1 Efficient Design: Design-to-Equipment and Material Availability Standard Shipping Time (Weeks) to first unit ship

  12. Slide 12: Right Experience, Right Timing

    Bridging the Gap Right Experience, Right Timing

  13. Slide 13: "Assembly Line" Construction

    Bridging the Gap “Assembly Line” Construction

  14. Slide 14: Summary: Assembly Line Construction

    Summary: Assembly line construction today is often referred to as Prefabrication and it starts with design. Bridging the Gap “Assembly Line” Construction

  15. Slide 15: What Is Next? "AI Brain in a building"

    What Is Next? “AI Brain in a building” Building: 3 story 100MW Rack Density: 45KW-150KW a rack Building Design: Purpose built for AI workloads Network core: Centralized Core

  16. Slide 16: What Is Next? Power Search Pipeline

    What Is Next? Power Search Pipeline

  17. Slide 17: Thank You

    Leading Provider of Next-Gen Datacenters for High-Performance Computing Applications Thank You

Applied Digital — Investor Presentation (October 2023) on 6ix