Alpha Hpa Limited · ASX:A4N

Alpha Hpa — Augur Resources — Investor Presentation (June 2011)

28 slides from Alpha Hpa's investor presentation, Jun 21, 2011

  1. Slide 1: Presentation to Investors (ASX cover letter)

    ABN 79 106 879 690 21 June 2011 The Manager Companies ASX Limited 20 Bridge Street SYDNEY NSW 2000 (28 pages by email) Dear Madam, PRESENTATION TO INVESTORS I attached a PowerPoint presentation which is being delivered to investors. For further information please contact Grant Kensington, Managing D

  2. Slide 2: Augur Resources Ltd Investor Update

    AUGUR RESOURCES LTD ABN 79 106 879 690 INVESTOR UPDATE June 2011 Grant Kensington – Managing Director ASX: AUK www.augur.com.au

  3. Slide 3: Disclaimer

    Disclaimer This material contains certain forecasts and forward-looking information, including regarding possible or assumed future performance, costs, production levels or rates, prices, resources, or potential growth of Augur Resources Ltd (Augur), industry growth, or other trend projections. Such

  4. Slide 4: Company Snapshot

    Company Snapshot Directors Share Price – 52 Weeks $0.40 Chairman Norman Seckold $0.30 Managing Director Grant Kensington $0.20 Director Peter Nightingale $0.10 Director Justin Werner $0.00 Capital Major Shareholders 155.8 Million Shares on Issue Permgold Pty Ltd 25.78% 2 Million Employee Options Ros

  5. Slide 5: Strategy

    Strategy Commodity Focus Gold - Copper - Nickel Area of Focus Indonesia Strategy Explore and develop advanced projects with shallow, definable resources in areas of moderate to advanced infrastructure. ASX: AUK www.augur.com.au

  6. Slide 6: Peer Group Comparison

    Peer Group Comparison Company Major Projects Resource Gold Market Price 12 Month Listing oz Capital Price Exchange (M) Aus$ Range G Resources Martabe 138.6Mt 6.49 1019.3 0.57 Hong Kong Tujuh Bukit (80%) 990Mt @ 0.4% Cu 14.32 921.5 1.79 0.46-2.40 ASX Intrepid and 0.45 g/t Au Archipelago Toka Tindung

  7. Slide 7: Project Areas - Indonesia

    Project Areas - Indonesia ASX: AUK www.augur.com.au

  8. Slide 8: Wonogiri Project

    Wonogiri Project • Target: Shallow gold and copper-gold porphyry; • Approximately 30km from the city of Solo in central Java; • Oxindo (MMG) targeted porphyry copper mineralisation. Intersected gold and copper in two holes: • DHH1 40m @ 1.12 g/t gold and 0.29% copper from 92m and 15m at 1.61 g/t gol

  9. Slide 9: Wonogiri – The Deal

    WONOGIRI – The Deal • No up front payment; • Partners PT Oxindo (owned by MMG) and PT Alexis Perdana Mineral; • Expenditure commitment of $US 1.5M over first year to earn 51% of the project; • Expenditure of $US 2.0M in the second year to earn 80%; • Oxindo have a 4 year option to buy back 65% of th

  10. Slide 10: Wonogiri - Excellent Location

    Wonogiri - Excellent Location Erosion of Oligocene volcanic centres has resulting in the exposure of some near surface significant porphyry and epithermal systems in the Java to Sumbawa region ASX: AUK www.augur.com.au

  11. Slide 11: Ground Magnetics

    Ground Magnetics Deeper magnetic New target high (not tested) Wide zone of quartz veining and Ground Magnetics stockworking and Trench lines: Magnetic highs are white to red; New targets Magnetic lows are purple to blue; ASX: AUK www.augur.com.au

  12. Slide 12: Wonogiri Project

    Wonogiri Project Epithermal Target Porphyry Target Epithermal Target Epithermal Targets ASX: AUK www.augur.com.au

  13. Slide 13: Randu Kuning Porphyry

    Randu Kuning Porphyry Wide zones of gold and copper mineralisation encountered 59.1m @ 1.31 g/t Gold 48.0 m @ 1.45 g/t Gold 105.5 m @ 0.95 g/t Gold 60.0 m @ 0.85 g/t Gold WDD007 215 m 0.48 g/t Gold and 0.17% Copper (no cut off) ASX: AUK www.augur.com.au

  14. Slide 14: Wonogiri

    Wonogiri Shallow vertical gold-copper porphyry body at Randu Kuning ASX: AUK www.augur.com.au

  15. Slide 15: Jampang Project

    Jampang Project ASX: AUK www.augur.com.au

  16. Slide 16: Jampang Gold Project

    Jampang Gold Project ASX: AUK www.augur.com.au

  17. Slide 17: Jampang - Infrastructure

    JAMPANG - Infrastructure • Located approximately 150km south of Jakarta (4.5 hours drive) by sealed road from Jakarta on the island of Java. • The region is well supported by sealed roads, power and water. • The deposit is approximate 20km from the coastal town of Pelabuhan ratu. • Power station bei

  18. Slide 18: Jampang – The Deal

    JAMPANG – The Deal • Up front payment of US$250,000 and issue of 10 million shares and 5 million options for and option to acquire 90% of PT Golden (the holder of the IUP’s – exploitation and exploration). • Two years from January 2010 to determine if we are willing to proceed with the acquisition.

  19. Slide 19: Jampang - History

    JAMPANG - History • Jampang lies within the Sumatra-Java Epithermal Belt. This belt includes the Pongkor Gold deposit +3M oz gold (8.6 g/t gold; 110 g/t Ag). • Mispec Resources Inc explored the Jampang area between 1996 and 1998 with a focus on gold. Drilled +32,000m (246 holes). • The central Jampa

  20. Slide 20: Jampang – Deposit Area

    JAMPANG – Deposit Area Near Surface (zones <10m from surface) Thick supergene gold mineralisation Lipi Gold - Copper Zone No Forestry Issues Mining Licence covering Lipi in place ASX: AUK www.augur.com.au

  21. Slide 21: Jampang – Results

    JAMPANG – Results HOLE From To Interval Gold (g/t) Silver (g/t) Copper % (m) (m) (m) JADD2 79 86 7 3.09 16.1 0.25 JADD8 73 83 10 7.47 6.4 JADD10 28.5 64.6 36 1.74 8.0 0.89 JADD11 71.5 91.7 20.2 1.43 5.2 0.21 JADD14 63.2 75.5 12.3 3.70 12.7 0.19 104.3 107.3 3 14.35 8.9 0.59 JADD19 142 156.5 14.5 1.46

  22. Slide 22: Jampang – Results

    JAMPANG – Results ASX: AUK www.augur.com.au

  23. Slide 23: Jampang – Deposit Area

    JAMPANG – Deposit Area LIPI NORTH ZONE Gold bearing zone at surface Drilling near this zone JADD8 10m @ 7.47 g/t gold from 73m ASX: AUK www.augur.com.au

  24. Slide 24: Jampang – Gold Results

    JAMPANG – Gold Results 10 m @ 7.47 g/t Au 14 m @ 1.18 g/t Au and 0.98% Cu 8 m @ 5.79 g/t Au While the Lipi zone is the main mineralised zone 7m @ 0.95 g/t Au identified to date there are other zones being identified. ASX: AUK www.augur.com.au

  25. Slide 25: Geophysical Targets

    GEOPHYSICAL TARGETS Puteran Simpang (includes from historical drilling) JRC183 133m @ 1.85 g/t Au JRC219 118m @ 3.16 g/t Au JRC157 57m @ 2.96 g/t Au Rock chip 3.5 g/t gold Lipi North Augur discovery 10m at 7.47 g/t Lipi East gold Only 1 hole drilled 3m @ 1.02 g/t gold Lipi West 8m @ 5.6 g/t gold ASX

  26. Slide 26: Jampang – Additional Targets

    JAMPANG – Additional Targets ASX: AUK www.augur.com.au

  27. Slide 27: Planned Activities

    PLANNED ACTIVITIES JAMPANG RC Drill testing additional targets Determine initial resource size – late 2011 Metallurgical testing Wonogiri Continue resource definition at Randu Kuning Commence drilling of epithermal targets by mid 2011 ASX: AUK www.augur.com.au

  28. Slide 28: Why Invest

    Why Invest  Early entry into two advanced gold +/- copper projects in significant mineralised belt in Indonesia;  Shallow mineralisation;  Diversified projects – not all eggs in one basket;  Actively advancing projects. Two drill rigs on Wonogiri and drilling additional targets at Jampang;  Und

Augur Resources — Investor Presentation (June 2011) on 6ix