Barrick Mining Corporation · TSX:ABX
Barrick Mining — Barrick Gold — Credit Suisse Canadian Precious Metals Conference 2013
13 slides from Barrick Mining's conference presentation, Jun 5, 2013
Slide 1: Credit Suisse Canadian Precious Metals Conference
Credit Suisse Canadian Precious Metals Conference June 5, 2013 1 CAUTIONARY STATEMENT ON FORWARD‐LOOKING INFORMATION Certain information contained or incorporated by reference in this presentation, including any information as to our strategy, projects, plans or future financial or operating perform
Slide 2: Gold Industry Leader; Equity / Gold Price Disconnect
Gold Industry Leader World’s largest gold producer p Exceptional assets Lowest cost senior Strong financial and operating performance Disciplined capital allocation Profitable, high quality production 3 Equity / Gold Price Disconnect Gold Equity Index (XAU) as % of Gold Price 200% 175% 1
Slide 3: Cost Inflation – Declining Grades; Rising Industry AISC
Cost Inflation – Declining Grades US$ per ounce g/mt $1,750 2.1 Gold Price $1,500 2.0 480% $1,250 1.9 $1,000 1.8 $750 17 1.7 22% $500 1.6 Weighted Avg. Head Grade $250 1.5 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 Source: Metals Economics Group 5 Rising Industry “All-In Sustaining” Cost
Slide 4: Disciplined Capital Allocation Framework; Q1 2013 Earnings and Cash Flow
Disciplined Capital Allocation Framework Focused on maximizing two key metrics: j 1. risk-adjusted returns 2. free cash flow Positions Barrick to increase shareholder returns and reduce debt over time Returns will drive production; production will not drive returns 7 Q1 2013 Strong Earnings and Ca
Slide 5: Q1 2013 Production – ~70% Americas; Materials Price Index
Q1 2013 Production – ~70% Americas Gold Production Regional Production Moz Percent 1.88 1.80 North America 1.50 48% 1.00 Africa 6% South America Australia 0.50 21% Pacific 25% 0 12 13 9 Materials Price Index 4.5 4.0 3.5 3.0 2.5 2.0 1.5 1.0 Q1 Q1 Q1 Q1 Q1 Q1 Q1 Q1 Q1 Q1 Q1 Q1 2002 2003 2004 2005 2006
Slide 6: Financial Flexibility; Modest Near-Term Debt Maturities
Financial Flexibility Generating robust earnings and cash flow g High-quality asset portfolio Substantial cost reductions Willingness to make tough decisions Strong liquidity 11 Modest Near-Term Debt Maturities Scheduled Debt Repayments(1) US$ billions 7.0 6.0 5.0 4.0 3.0 2.0 1.0 0 2013 20
Slide 7: A Framework for Producing Returns; Large Low-Cost Mines in the Americas
A Framework for Producing Returns Large, low cost mines in favorable, prospective mining jurisdictions Recalibrated long term production target Optimizing portfolio Reducing all-in sustaining costs Other expense and capital reductions Cost reductions total $500 million No major project
Slide 8: Cortez – Largest Producer, Substantial Upside; 2013 Exploration Focused on Goldrush
Cortez – Largest Producer, Substantial Upside Q1 2013 production – 343,000 ounces – AISC of $411/oz(1) Total 2012 production – 1.4M ounces – AISC of $543/oz(1) Continued exploration success – 15M ounces of reserves(2) (1) See final slide #1 (2) See final slide #2 15 2013 Exploration Focused on
Slide 9: Goldstrike – Second Largest Producer; Veladero – Consistent Outperformance
Goldstrike – Second Largest Producer Q1 2013 production – 230,000 ounces – AISC of $817/oz(1) Total 2012 production – 1.2M ounces – AISC of $670/oz(1) 39M ounces produced to date 12M ounces of reserves(2) (1) See final slide #1 (2) See final slide #2 17 Veladero – Consistent Outperformance
Slide 10: Lagunas Norte – Consistent Outperformance; Pueblo Viejo – Ramp-Up on Schedule
Lagunas Norte – Consistent Outperformance Q1 2013 production – 145,000 ounces – AISC off $380/ $380/oz(1) Total 2012 production – 754,000 ounces – AISC of $367/oz(1) Outperformed production estimates each year since 2005 start-up – 50% more production than expected (1) See final slide #1 19 Pu
Slide 11: Pascua-Lama – evaluating SMA resolution; Argentina process plant
Pascua-Lama – evaluating SMA resolution Fully committed to meeting all aspects of the resolution Working to define and clarify the requirements for a plan to complete the water management system No definitive timeframe until plan is approved – first gold now expected post 2014 – working to min
Slide 12: 2013 Outlook – Cost Reductions; Substantial Free Cash Flow Growth Potential
2013 Outlook – Cost Reductions Revised Original/ guidance reaffirmed Gold production (Moz) (M ) 7.0-7.4 7 0 74 AISC ($/oz) (1) 950-1,050 1,000-1,100 Total cash costs ($/oz)(1) 610-660 Copper production (Mlbs) 480-540 C1 cash costs ($/lb)(1) 2.10-2.30 C3 fully allocated costs ($/lb)(1) 2.60-2.85 Tota
Slide 13: 2013 Priorities; Footnotes
2013 Priorities Meet Ramp up Pascua-Lama Improve p production Pueblo Viejo Clarify performance and cost to full regulatory at Lumwana guidance capacity matters Actively Identify ways Strengthen Advance pursue to further Corporate Goldrush in opportunities reduce Responsibility Nevada to optimize com
Barrick Gold — Credit Suisse Canadian Precious Metals Conference 2013 on 6ix