    ASX Release ASX:TLG 7 March 2023 Talga Presentation at Euroz Hartleys Rottnest For personal use only Island Institutional Investor Conference Battery and advanced materials company Talga Group Ltd (“Talga” or “the Company”) (ASX:TLG) is pleased to provide a copy of the presentation to be delivered b

  2. Slide 2: About Talga / Forward-Looking Statements & Disclaimer

    About Talga Talga Group Ltd (ASX:TLG) is building a European battery materials supply chain to offer products critical to the green transition. Talga’s innovative technology and vertical integration of 100% owned Swedish graphite resources provides security of supply and creates additional value for

  3. Slide 3: Euroz Hartleys Rottnest Island Institutional Conference

    For personal use only Talga Group Ltd ASX:TLG Euroz Hartleys Rottnest Island Institutional Conference 7 March 2023 © Talga Group Ltd, March 2023

  4. Slide 4: Cautionary Statement and Disclaimer

    Cautionary Statement and Disclaimer Talga Group Ltd ACN 138 405 419 (the Company) is the issuer of this presentation. For personal use only Niska Scoping Study The Niska Scoping Study is a preliminary technical and economic study of the potential viability of developing the Nunasvaara North, Niska S

  5. Slide 5: Talga Group

    Talga Group For personal use only Graphite battery material supplier with 100% owned mineral resources in Sweden and processing-product technology Strong in-house expertise spans coated graphite and silicon anode products, development and marketing Talga is differentiated by: Full vertical integrati

  6. Slide 6: Graphite is major part of all Li-ion Batteries / Forecast Graphite Anode Demand

    Graphite is major part Forecast Graphite of all Li-ion Batteries Anode Demand For personal use only 8.0 250 200 6.0 (kg per vehicle) Million MWh 150 4.0 100 2.0 50 0 - 2018 2016 2019 2017 2015 2028 2026 2029 2027 2037 2023 2033 2021 2031 2035 2020 2022 2024 2025 2030 2032 2034 2038 2036 2039 2040 NC

  7. Slide 7: Talga: a stronger, cleaner anode supply chain

    Talga: a stronger, cleaner anode supply chain For personal use only Graphite concentrate Precursor anode material Active anode material Mining and Concentration Shaping and Purification Coating Talnode® Li-ion Batteries Current Anode Supply Chain China/Africa China China/Korea/Japan Europe Northern

  8. Slide 8: Our Mission

    Our Mission For personal use only to enable the world’s most sustainable batteries and consumer products through innovative graphitic materials

  9. Slide 9: Talga Operations

    Kiruna Talga Operations Luleå For personal use only Osaka Perth, Australia Stockholm Group head office Luleå & Kiruna, Sweden Rudolstadt Anode production and graphite deposits Cambridge Cambridge, UK Product and R&D technology centre Rudolstadt, Germany Production process pilot facility and EU custo

  10. Slide 10: Operating first anode plant in Europe

    Operating first anode plant in Europe For personal use only Electric Vehicle Anode (EVA) Plant, Sweden Producing large-scale coated natural graphite anode, Talnode®-C, for auto OEM battery customer qualifications (A-C sample) Proprietary ore-to-coated shaped purified graphite (CSPG) technology In-ho

  11. Slide 11: Talga Technology and Products Map

    Talga Technology and Products Map Diverse range of battery and advanced materials produced from graphite sources For personal use only Refining & Advanced Talga Customer Mining Processing Processing Products Applications Swedish Natural TLG Process Talphite® Talnode®-C Graphite Ore Technology Talnod

  12. Slide 12: Talnode-C performance characteristics

    Talnode®-C performance characteristics For personal use only Energy Density High energy density for increased range or lighter weight Faster Charging Fast charge rate and higher regen-braking energy recovery Lower Cell Resistance High conductivity decreases thermal build up, improves safety Cold Per

  13. Slide 13: Talnode-Si Silicon Anode

    Talnode®-Si Silicon Anode For personal use only Talnode®-Si is a Graphene-silicon composite undergoing qualification and testing with numerous customers Composite contains ~50% Si and can be ‘dropped in’ to existing commercial anodes German Talnode®-Si pilot plant expanding production (commissioning

  14. Slide 14: European proximity to customer demand

    European proximity to customer demand Announced battery capacity requires >1.3Mt graphite anode per annum by 2030 For personal use only Source: Cic Energigune, June 2022, Benchmark Mineral Intelligence, January 2022, 12 Benchmark Mineral Intelligence, Lithium Ion Battery Gigafactory Assessment, Janu

  15. Slide 15: Vittangi Project

    Vittangi Project For personal use only Stage 1 integrated mine/concentrator and anode production plant 100,000tpa graphite mine and concentrator at Vittangi with 24 year life based on fraction of 30.5Mt @ 24.1%Cg resource base Luleå anode refinery to produce 19,500tpa Talnode®-C (purification, shapi

  16. Slide 16: Path to >100,000tpa anode production

    Path to >100,000tpa anode production Niska adds to Vittangi to make Talga one of the largest anode producers outside China For personal use only Niska North Niska Expansion(1) (2020 Scoping Study) Nunasvaara South(1) Talnode®-C 84,700tpa (2021 DFS) Talphene® 8,470tpa Niska South Talnode®-C 19,500tpa

  17. Slide 17: Vittangi DFS & Niska Scoping Study Key Outcomes

    Vittangi DFS & Niska Scoping Study Key Outcomes Parameter Units Vittangi Niska For personal use only Annual ore mining rate tonnes 100,000 400,000 Average annual production of Talnode®-C tonnes 19,500 84,700 Average annual production of Talphene® tonnes - 8,470 Life of Mine (LOM) years 24 14 Pre-tax

  18. Slide 18: Project Funding

    Project Funding For personal use only European Investment Bank appraising up to EU$300m for Vittangi Anode Project, pending final due diligence, credit approvals and agreements Discussions progressing with multilateral financial institutions, development banks and export credit agencies with due dil

  19. Slide 19: Anode offtakes

    Anode offtakes For personal use only Talga is actively negotiating agreements with multiple cell and auto customers for Talnode®-C supply from Vittangi Anode Project ACC (co-owned by Mercedes-Benz, Stellantis, and Saft) non-binding offtake term sheet for: Supply of 60,000 tonnes of Talnode®-C over i

  20. Slide 20: Graphite Battery Anode Pricing

    Graphite Battery Anode Pricing For personal use only Rising demand for Li-ion battery demand Anode Price Assessment (DDP China spot basis) from EV production will continue to build pressure in the graphite anode supply chain Benchmark Mineral Intelligence has launched an anode price assessment to pr

  21. Slide 21: EU Policy Momentum

    Martin Phillips, Talga Europe CEO; and Ebba Busch, Minister for Energy, Business and Industry and Deputy Prime Minister of Sweden EU Policy Momentum For personal use only Response to USA Inflation Reduction Act driving new actions in EU Critical Raw Materials Act to be published March 2023 New Net-Z

  22. Slide 22: Partnerships for a greener future

    Partnerships for a greener future Customers and development partners under public partnerships and more under non-disclosures For personal use only 20 Source: ASX:TLG 30 Oct 2015 and 5 Feb, 26 Mar 2018 And 15 Jan, 24 Oct 2019 And 31 Jan, 20 Mar, 13 May, 27 May, 2 Nov, 24 Nov 2020 and 22 Jun, 28 Jun,

  23. Slide 23: Institutional placement

    Institutional placement For personal use only Completed A$40 million placement in Feb 2023 to global and domestic institutions Proceeds will be used to fund: Vittangi Anode Project early works Scaled up EVA production Silicon anode scale-up General working capital Strong demand from investors highli

  24. Slide 24: Corporate Overview / Capital Structure

    Corporate Overview CAPITAL STRUCTURE For personal use only Market Capitalisation: $540.2M ASX:TLG (12 months) Listed Shares: 360.1M Unlisted Options: 12.1M (1) Cash as at 31 December 2022: $23.3M Capital raised in February 2023: $40.0M MAJOR SHAREHOLDERS Kinetic Investment Partners 4.8% Mark Thompso

  25. Slide 25: Experienced Board and Management Team

    Experienced Board and Management Team Strong technological and operational leadership with on the ground European presence For personal use only Board of Directors Terry Stinson Mark Thompson Grant Mooney Steve Lowe Ola Rinnan Non-Executive Chairman Managing Director & Founder Non-Executive Director

  26. Slide 26: Targeted catalysts and milestones

    7/3/2023 Targeted catalysts and milestones For personal use only Entering ASX 300 Index on March 20, 2023 Decision on mine environmental permit to be published 5 April 2023 CY2023 finalise offtakes, project financing and commence refinery construction Commercial agreements: >20 battery and auto cust

  27. Slide 27: www.talgagroup.com

    For personal use only www.talgagroup.com ASX:TLG

  28. Slide 28: JORC Graphite Reserve and Resources

    JORC Graphite Reserve and Resources For personal use only Ore Reserve 3, 5 Tonnes Graphite (% Cg) Nunasvaara (JORC 2012) 2,260,140 24.1 Probable 2,260,140 24.1 Mineral Resources 1, 2, 4, 6, 7, 8 Tonnes Graphite (% Cg) Vittangi (JORC 2012) 30,100,000 24.1 Indicated 22,600,000 24.9 Inferred 7,500,000

  29. Slide 29: JORC Exploration Target

    JORC Exploration Target For personal use only 2021 Exploration Target Vittangi Graphite Project Vittangi (JORC 2012) Low High Tonnage Range 170Mt 200Mt Grade Range 20% Cg 30% Cg Note that the potential quantity and grade of the Exploration Target is conceptual in nature, there has been insufficient

  30. Slide 30: Competent Person Statements

    Competent Person Statements For personal use only The Vittangi Mineral Resource estimate was first reported in the Company’s announcement dated 27 May 2022 titled ‘Talga’s battery anode growth ambitions boosted with 54% graphite resource increase’. The Company confirms that it is not aware of any ne