Modern Mining Technology Corp · AMEX:MDRN

Modern Mining Technology — Investor Presentation (2026)

23 slides from Modern Mining Technology's investor presentation, Nov 10, 2026

  1. Slide 1: America's Gold Mine of the Future

    America’s Gold Mine of the Future C O R P O R AT E P R E S E N TAT I O N . Q 4 . 2 0 2 6 NYSE AMERICAN: MDRN

  2. Slide 2: Gold achieves all-time highs

    Gold achieves all-time highs “With…factors persisting into 2026, we fail to see any catalyst for gold to meaningfully retrace at present. Therefore, we expect gold to continue to push up throughout the year to attempt © 2026 MODERN MINING a challenge of $5,000/oz.” — Matthew Piggott, Director of Gol

  3. Slide 3: The Problem: The Traditional Mining Industry Is Broken

    The Problem: The Traditional Mining Industry Is Broken Traditional Production Capital Expenditure in Exploration Decline: The Environmental is Slow & Unreliable Gold Exploration Budget Cuts & Strategies Toll of Gold Mining Only ~0.01% of Starting a mine costs Reduced budgets, rising Gold mining crea

  4. Slide 4: Traditional Production Is Failing Demand

    Traditional Production Is Failing Demand Gold prices are rising due to higher Gold supply is constrained by declining mining demand during economic uncertainty, with yields, geopolitical risks in key producing its history as a safe-haven asset driving regions, and challenges in maintaining investor

  5. Slide 5: Gold Discovery Collapse

    Gold Discovery Collapse For the first time in recorded history, data from S&P Global confirms that for two consecutive years; 2023 and 2024, there have been zero new major gold discoveries of at least 2 million ounces. This has never happened before. The whiplash from years of chronic underinvestmen

  6. Slide 6: The Solution: Modern Mining

    The Solution: Modern Mining Traditional Production Capital Expenditure in Exploration Decline: The Environmental is Slow & Unreliable Gold Exploration Budget Cuts & Strategies Toll of Gold Mining Digitized Planning & Scalable, Cost-Efficient Sustainable, Cost- Clean, Circular Gold Modular Mining Gol

  7. Slide 7: What Is Electronic Waste?

    What Is Electronic Waste? E-waste refers to discarded devices with circuits, electronics, or batteries, such as obsolete AI chips, scrap semiconductors, and old phones. E-waste is growing rapidly, The unlimited growth is increasing by 2.6 million tonnes annually and expected to reach 82 million tonn

  8. Slide 8: Investment Thesis

    Investment Thesis Turning AI's e-waste into the world's most efficient precious and critical metals supply. © 2026 MODERN MINING Disruptive Tech in Scalable E-waste Consistent Cost & Proven $B+ E-Waste Recycler with Supply of Permitting Management Market Low-Capex Model Gold Advantages Team AI chips

  9. Slide 9: Global E-waste is expected to reach massive scale

    Global E-waste is expected to reach massive scale Companies like Microsoft, Meta, and Oracle are investing billions in AI data centers, driving demand for sustainable hardware and recycled materials AI Chip Market will be 10x by 2035 Delivering matching gold-bearing waste yields Value reaches all- t

  10. Slide 10: More tech, fewer processing steps, faster production

    More tech, fewer processing steps, faster production 1.5 YEARS 1.5 years to Urban Sourced Feedstock, production Data-driven, Strategic, $17.5M Streamlined, Sustainable, Increased Efficiency; Faster Production Allocated Capex Vertically Integrated, 136 g/t Grade Reusable, Sustainable… Extracted © 202

  11. Slide 11: Validated Process at Our North Carolina Demonstration Facility

    Validated Process at Our North Carolina Demonstration Facility STEP 1 STEP 2 STEP 3 STEP 4 E-waste from Transform E-Waste at Shipping of Aqueous Purification © 2026 MODERN MINING Qualified Recyclers Pre-Concentrator Plant Concentrates Plant Secure high grade raw materials Factory-proven, proprietary

  12. Slide 12: Value Proposition

    Value Proposition Average Potential Contained Metal Value: $14,866 Equivalent to 6 ounces of gold (gold-equivalent-ounces, GEOs), at $2,500 / oz Au Per tonne of waste printed circuit boards (pcb’s) in us$ GOLD SILVER PALLADIUM COPPER Au @136gpt Ag @619gpt Pd @60gpt Cu @15% $10,934 $597 $1,929 $1,406

  13. Slide 13: Reproducible Results 2024-25 YTD Demo-Sales

    Reproducible Results 2024-25 YTD Demo-Sales GOLD-EQUIVALENT-OUNCES SOLD PER SETTLEMENT DATE LOT WEIGHT (LB) TONNE OF FEEDSTOCK PROCESSED (GEOs) 12/21/2023 1,473 3.67 1/10/2024 1,059 3.70 2/27/2024 1,416 2.52 3/15/2024 865 2.85 4/1/2024 878 7.48 4/12/2024 1,158 4.81 4/23/2024 839 8.33 5/20/2024 1,599

  14. Slide 14: Results Drive Growth

    Results Drive Growth Results are fully Growth Strategy Y1 Y2 • Ramp-up current consistent with overall production to 1 Concentrator Concentrator performance objectives tonne/day. Plant Plant • Expand current active (North Carolina (West Coast) plant to 24 tonnes/day. o Each tonne processed is • Add

  15. Slide 15: Our Competitive Advantage & Key Differentiators

    Our Competitive Advantage & Key Differentiators Versus Traditional Mining 100x 70x 10x 5x Lower Lower exploration, © 2026 MODERN MINING richer feed lower faster faster environmental geological, and grade capex permitting construction footprint geopolitical risk. timeline timeline 15

  16. Slide 16: Select Public Company Comparables

    Select Public Company Comparables $6,000 Advanced gold developers are poised to $5,000 achieve near-term annual production of 200,000 to 300,000 ounces of gold. Market Cap (M USD) $4,000 Advanced gold developers are poised to achieve near-term annual production of 200,000 $3,000 to 300,000 ounces of

  17. Slide 17: Operational Timeline

    Operational Timeline Milestones Roadmap: from Funding to Sustainable Commercial Revenue Month 1 Month 2 Month 3 Month 4 Month 5 Month 6 Month 7 Month 8 Month 9 Ramp-up current production to 1 tonne/day (ongoing) Plant expansion to 1 ton/hour engineering, procurement Staff hiring Facility infrastruct

  18. Slide 18: Management & Operations Team

    Management & Operations Team KULJIT (JEET) BASI AUSTIN THORNBERRY, CPA, CA DAVIN GORDON DARRELL CAMPANELLA CEO, President, & Director Chief Finance Officer Procurement Manager General Manager Experienced 17-year mining industry Seasoned Chief Financial Officer and finance Over 16 years of procuremen

  19. Slide 19: Board of Directors

    Board of Directors MARK ZORKO KULJIT (JEET) BASI MATTHEW CHATTERTON CHAIRMAN OF THE BOARD DIRECTOR INDEPENDENT DIRECTOR Compliance Officer Company CEO & President Chair, Compensation Committee Technology Industry veteran Corporate technical services and Chemical Process Engineer, Extensive governanc

  20. Slide 20: Investment Highlights

    Investment Highlights E-waste and scrap Proven leadership Markets are Demonstrated and AI chips are a nearly team with track trending favorably validated process at limitless resource, record of delivery with highest ever industrial scale, with representing a and execution. gold values, proven produ

  21. Slide 21: Forward – Looking Statement

    Forward – Looking Statement THIS MANAGEMENT PRESENTATION (The "presentation") was prepared as a summary overview only of the current affairs of Modern Mining Corp. (“Modern Mining” or the "company"), and was not prepared for the purpose of assisting prospective investors in making a decision to inve

  22. Slide 22: Forward – Looking Statement

    Forward – Looking Statement FUTURE ORIENTED FINANCIAL INFORMATION This Presentation also contains future-oriented financial information and financial outlook (collectively, “FOFI”) about the company’s forecasted earnings per concentrator, which is subject to the same assumptions, risk factors, limit

  23. Slide 23: Thank You

    Thank You MODERN MINING Greenville, North Carolina, USA America’s info@modernmining.com +1 (984) 235 6778 Gold Mine of the Future modernmining.com NYSE AMERICAN: MDRN

Modern Mining Technology — Investor Presentation (2026) on 6ix