  1. Slide 1: Investor Presentation

    ASX Code: “THR” 21 November 2013 Company Announcements Office, For personal use only ASX Securities Limited, THOR MINING PLC 20, Bridge Street, Registered Numbers: Sydney, N.S.W. 2000 United Kingdom 05 276 414 Australia 121 117 673 Investor Presentation Registered Office: Level 1 The Directors of Th

  2. Slide 2: Mick Billing – Chairman & Chief Executive Officer

    For personal use only Mick Billing – Chairman & Chief Executive Officer Tel: +61 8 7324 1935 Fax: +61 8 8351 5169 Email: mbilling@thormining.com Address: Level 1, 32 Richmond Road, KESWICK, SA, 5035, AUSTRALIA www.thormining.com 1

  3. Slide 3: Disclaimer & Legal Notice

    Disclaimer & Legal Notice This document and all other information (whether in writing or otherwise) which may be made available is: 1. Supplied solely for the intended recipient and may not be copied, reproduced, further distributed to any other person or published, in whole or in part, for any purp

  4. Slide 4: Corporate: Board & Management

    Corporate BOARD & MANAGEMENT For personal use only Directors • Mick Billing - Chairman & CEO • Trevor Ireland - Director • Greg Durack - Director • Mick Ashton - Director • Dave Thomas - Director Management Richard Bradey - Expl Mgr Allan Burchard - CFO & Co Sec EXCHANGE LISTINGS ASX “THR” AIM “THR”

  5. Slide 5: Location / Ownership

    Location / Ownership Access via sealed road along Thor Mining PLC listed in London For personal use only Stuart Highway, then partially (AIM) and Australia (ASX) sealed Plenty Highway. Molyhil Mining Pty Ltd is 100% owned by Thor Molyhil Mining has 100% of Molyhil project Thor also owns TM Gold Pty

  6. Slide 6: Feasibility Study Upgrade

    Feasibility Study Upgrade OBJECTIVES For personal use only Improve the Molyhil cost parameters to drive increases in: • Ore reserve • Project life • Financial outcomes PLUS Exploration upside to further enhance project outcomes Recent off-take undertaking & optimisation initiatives are projected to

  7. Slide 7: Feasibility Study Upgrade

    Feasibility Study Upgrade Potential For personal use only • 2012 DFS showed that a 7% improvement in revenue factors extends the ore reserve from 1.6 million tonnes to 2.5 million tonnes, and mine life extends from 4 years to 6 years. Approach • Internal Thor modelling suggests this can also be achi

  8. Slide 8: Revised Operating Costs

    For personal use only Revised Operating Costs Costs per tonne ore processed A$ DFS Adjustment* Revised June 2012 Mining 24.23 (4.24) 19.99 Plant inc' labour 28.93 (5.77) 23.16 Power / Water 19.68 (5.42) 14.26 Camp 7.10 (1.84) 5.26 Admin 3.45 3.45 Transport 0.78 0.78 Scheelite re-float** 5.35 5.35 To

  9. Slide 9: Revised Capital Costs

    Revised Capital Costs DFS Cost Estimates A$M DFS Saving Additional Revised For personal use only Identified Plant Mining Plant - - 5.8 5.8 Process Plant 33.0 2.1 1.5 32.4 Site Services 7.7 3.7 2.2 6.2 Project Infrastructure 2.7 1.9 0.8 Village & Accommodation 3.2 1.0 2.1 4.3 Other 0.3 0.3 Total Dire

  10. Slide 10: Optimisation Program

    Optimisation Program Initiative For personal use only • Owner operate mining rather than contract mining • Pre concentration - XRay ore sorting to reduce mill feed by 30% • Power Supply & Camp purchase rather than lease • Other Capex savings based upon quoted work & Thor research Outcomes • Lower co

  11. Slide 11: Commodity Pricing

    For personal use only Commodity Pricing (Source: Metal-Pages.com) TUNGSTEN PRICING REMAINS FIRM WITH OUTLOOK POSITIVE 10

  12. Slide 12: Off-take Agreement

    For personal use only Off-take Agreement Letter of Intent from US Global Tungsten & Powders (GTP) for 70% to 75% of tungsten concentrate production • Pricing benchmarked against London Metal Bulletin European spot price • GTP one of the top 3 non-Chinese tungsten processors Discussions in progress r

  13. Slide 13: Project Permitting

    Project Permitting • Notice of Intent (NOI) complete For personal use only • Public Environment Report (PER) complete • Mining Management Plan (MMP) - accepted in 2008 but resubmitted in June 2012 as a result of changes to scope and to environmental standards. Provisional approval offered. • Risk Ma

  14. Slide 14: Project Timetable

    Project Timetable Q4 Q1 Q2 Q3 Q4 Q1 Q2 For personal use only 2013 2014 2014 2014 2014 2015 2015 Public Environment Report **Complete Agreements with T/O’s **Complete Definitive Feasibility Study **Complete (Revision in progress) MMP Approval Offtake Agreements Finance Agreements Detailed Design Site

  15. Slide 15: Exploration Upside

    Exploration Upside • Molyhil is in a tungsten rich For personal use only province • 27 known outcropping tungsten occurrences within economic trucking distance • Zero tungsten exploration activity in the region since the 1970’s • Opportunity to turn these, and others into additional feedstock for Mo