  1. Slide 1: Investor Presentation March 2016

    TSX.V: ROG Investor Presentation ● March 2016 www.roxgold.com

  2. Slide 2: Cautionary Statement

    Cautionary Statement TSX.V: ROG This presentation contains forward-looking information. Forward looking information contained in this presentation includes, but is not limited to, statements with respect to: (i) the estimation of measured, indicated and inferred mineral resources and probable minera

  3. Slide 3: Advancing Towards Production

    Advancing Towards Production PROJECT SUMMARY Operational Readiness LOM AISC of US$590/oz Yaramoko To Deliver Strong Margins Even at Q1 2016 Jan 2016 Lower Gold Prices First Ore on Q2 2016 Operational First Gold Pour Personnel hired ROM Pad Yaramoko Gold Project Feb 2016 Commence Ore Drifting 75% COM

  4. Slide 4: Construction - Progressing Well

    Construction - Progressing Well TSX.V: ROG Procurement Complete All Heavy Machinery on Site Overall Construction 75% Mill Conveyor Complete Power Station Thickener, Tailings Pumps & Pipework Processing Plant Progressing on schedule www.roxgold.com 4

  5. Slide 5: Development – Mine Infrastructure

    Development – Mine Infrastructure TSX.V: ROG Reclaim Tunnel Concrete Underground Development Portal and backfilling Complete works complete progressing well View from Rom Bin of Rom Pad and Surface Stockpiles www.roxgold.com 5

  6. Slide 6: Development – Project Infrastructure

    Development – Project InfrastructureTSX.V: ROG Settlement Ponds for UG Permanent Contractor Accommodation Camp dewatering offices nearing completion Completed Lined Tailing Storage Facility Water Storage Facility www.roxgold.com 6

  7. Slide 7: Experienced West African Focused Team

    Experienced West African Focused Team TSX.V: ROG Paul Criddle COO Iain Cox GM Operations Andre Baya Vincent Eric Gratton Philibert Sawadogo Ryan Hairsine Bassory Traore Elizabeth Brendan Cope Wayne Perna GM Ext. Processing Costa Commercial Environment Snr Community Freele Mining Snr Project Manager

  8. Slide 8: Experienced West African Contractors

    Experienced West African Contractors TSX.V: ROG African Underground Mining Services DRA/Group Five Joint Venture • Contract awarded to AUMS (African Underground • Engineering, Procurement and Construction (EPC) Mining Services) September 2014 contract awarded to DRA/ Group Five Joint Venture • Exper

  9. Slide 9: Mine Development

    Mine Development TSX.V: ROG • Primary access Primary Access JANUARY 2016 MARCH 2016 established East Vent Raise Footwall • Footwall Development development allowing access to Ventilation shaft West Vent Raise JUNE 2016 and western ramp Ore underway West Ramp Development • Ore drifting commenced SEPT

  10. Slide 10: Mine Development Highlights

    Mine Development Highlights TSX.V: ROG • First ore intersected in the 5253 level • Mine dewatering commenced • Armtec Tunnel backfilling completed 1m • ROM pad constructed with first ore delivered • Intersection of East Ventilation Raise in mid- late February 2016 • Underground development ahead of

  11. Slide 11: Low Cost - High Margin

    Low Cost - High Margin TSX.V: ROG Cost Breakdown Cost Summary at $1,200/oz AU LOM LOM $1,300 ($/oz) ($/tonne) $1,200 Mining $242 $86 $1,100 Processing $89 $32 $1,000 G&A $61 $22 Margin: $900 $610/ oz Refining $10 $4 $800 Cash operating Cost $402 $144 $700 All-in Costs: $600 $590/oz Royalties $65 $23

  12. Slide 12: Pre-Production Capital Costs

    Pre-Production Capital Costs TSX.V: ROG Pre-Production Capex Project Funding as March 08, 2016 Detailed Design and Project Management Commitments (In ‘000 USD) Other $4.5 M $5.3 M Contingency Processing Plant  Capex: $110.8M $5.4 M (fixed price)  Spent to date: $69.2M $34.9 M  Remaining CAPEX: $4

  13. Slide 13: 55 Zone – Still Expanding

    55 Zone – Still Expanding TSX.V: ROG Open for Expansion Q2: • Below 500 m remains open for expansion • High grade results encountered to a depth of 900 metres vertically • Bottom of current mine plan 430 m • New highest grade hole intersected in infill drilling hole 316: 200.7 gpt Au/5.9m incl. 460.

  14. Slide 14: 55 Zone – Expanding the 55 Zone

    55 Zone – Expanding the 55 Zone TSX.V: ROG • Focus on improving resolution around W edges of High Grade Domain 55 Zone • Gap Zone at east 55 Zone in plane of East dilation >2.5 metres with demonstrated high grade in Met Hole – 01 (YRM-13- MET-01, 28.3 g/t over 28.8 m – Priority announced May, 02 201

  15. Slide 15: Regional Exploration

    Regional Exploration TSX.V: ROG Semafo’s Mana Mine Semafo’s Siou Zone 15km 10km Yara/ 300 8 km Geochemical Anomaly Trend Haho 55 Zone Central 10 km Gold Trend Boni Shear Bagassi QV1 Zone Bagassi South Kaho New Exploration Ground Yaramoko Permit Endeavour’s Hounde Project 13 km www.roxgold.com 15

  16. Slide 16: Ongoing Exploration at QV1 & QV'

    Ongoing Exploration at QV1 & QV’ TSX.V: ROG QV1  Structure remains open down plunge & along strike  Recent drill program extended strike length by 100 m  Recent high grade results include: 52.3 gpt Au / 6.1 m incl. 137.0 gpt Au / 0.8 m & 199.0 gpt Au / 1.0 m (BGS- 099)  Current drill program (10

  17. Slide 17: QV1 Longitudinal Section Looking South West

    QV1 Longitudinal Section Looking South West TSX.V: ROG www.roxgold.com 17

  18. Slide 18: QV1 & QV' Cross Section Looking North West

    QV1 & QV’ Cross Section Looking North West TSX.V: ROG www.roxgold.com 18

  19. Slide 19: Scalability & Flexibility in Plant Design

    Scalability & Flexibility in Plant Design TSX.V: ROG Upsized SAG Mill Motor • Upsized to 1.5 MW motor for added flexibility (900 KW included in Feasibility Study) • Design capacity incorporates the potential to treat additional material Further Capacity Increase • Ability to increase processing capa

  20. Slide 20: Project Finance Summary

    Project Finance Summary TSX.V: ROG Project Fully Funded to Production Project Debt Facility Holdings by Investor Class • Project Debt Facility of $75 Million, with company- 5% funded equity $15 Million Cost Overrun Account 28% Insiders • Interest rate of LIBOR plus 4.25 % to 4.75 % Institutional Hol

  21. Slide 21: Roxgold is in the Right Place

    Roxgold is in the Right Place TSX.V: ROG ESSAKANE  Fastest growing gold producer INATA AVOCET IAMGOLD in Africa KARMA TAPARKO/ BOUROUM NORDGOLD  4th largest gold producer in TRUEGOLD SEGA Africa AMARA KALSAKA AMARA BISSA HILL  8 new mines commissioned PERKOA GLENCORE/XSTRATA NORDGOLD NATOUGOU SEM

  22. Slide 22: Corporate Social Responsibility Mandate

    Corporate Social Responsibility TSX.V: ROG Mandate To create value for our stakeholders while continually improving our performance as a good corporate citizen and neighbour, sharing the benefits of responsible mining and ensuring that we leave a legacy of positive Economic, Social and Environmental

  23. Slide 23: 2015 Social Investment

    2015 Social Investment TSX.V: ROG • Infrastructure – Ward at the Bagassi village clinic – Solar electrification of the Bagassi village clinic – Multi-use hall at the Bagassi Youth Centre – Acquisition of a 150-KVA generator for the provincial clinic • Agro-pastoral development – Development of culti

  24. Slide 24: Key Milestones to Production

    Key Milestones to Production TSX.V: ROG Approaching Producer status Advance Construction Drilling at QV1 & QV’– Q1 2016 Maiden Resource Estimate at QV1– Q2 2016 Production - Q2 2016 Updated 55 Zone Resource – H2 2016 Potential Expansion of Yaramoko Gold Project www.roxgold.com 24

  25. Slide 25: APPENDIX

    TSX.V: ROG APPENDIX…. www.roxgold.com

  26. Slide 26: Why Roxgold?

    Why Roxgold? TSX.V: ROG High Grade Asset Compelling Economics Regional Exploration Potential 196 Km 2 278,000 oz at 10.26 g/t After Tax IRR: 35.2% Boni Shear Zone Inferred 810,000 oz at 15.8 g/t Payback: 2.4 Years Indicated * At a 5.0 g/t cut off * At $1,100/oz Au Multiple Drill-Ready Targets 55 Zon

  27. Slide 27: Corporate Information

    Corporate Information TSX.V: ROG Capital Structure Valuation Snapshot Listings TSX-V ROG NASDAQ INT. ROGFF Ordinary Shares 353M Market Cap C$309M Options & Warrants 26.9M Current Share Price C$0.89 Cash at March 08, 2016 ~US$54M Analyst Coverage NEAR TERM CATALYSTS BMO Andrew Breichmanas Q3-2016 Com

  28. Slide 28: Share Structure

    Share Structure TSX.V: ROG Issued and Outstanding: 352,831,829 Exercise Price: Expiry Date: 25,000 $0.75 August 10, 2016 1,000,000 $1.25 November 9, 2016 100,000 $2.00 March 6, 2017 200,000 $0.96 October 4, 2017 875,000 $0.75 December 18, 2017 133,333 $0.52 May 29, 2018 Options 575,001 $0.61 Septemb

  29. Slide 29: Simplified Flow Sheet

    Simplified Flow Sheet TSX.V: ROG Excellent Metallurgy 33.75 tph @ Throughput 91% Ave ROM Pad Crushing Circuit SAG Mill Grind Size (P80) 90 micron Gravity Concentration Design Bond Ball 17.5 kWh/t Work Index CIL Testwork (Carbon In Leach) Range: 55 - Gravity Gold ICC Recovery 90% (Intensive Cyanidati

  30. Slide 30: Resource Estimate

    Resource Estimate TSX.V: ROG Yaramoko Probable Mineral Reserve (As at April 22, 2014) Cut –off Reserve Grade (capped) Metal Category Tonnes Au g/t Au Oz Crown Pillar 98,000 23.46 74,000 >5.0g/t Development 440,000 11.75 166,000 Probable Stope 1,459,000 11.07 519,000 Total 1,996,000 11.83 759,000 Yar

  31. Slide 31: Mineral Resource Estimate Parameters And Method

    Mineral Resource Estimate Parameters And Method TSX.V: ROG • An outer wireframe representing the widest geological contacts was created from logging data and core photos • High grade sub domains were modelled within this with a shallow westerly plunge of about 28⁰. These were only modelled for the u