Imperial Brands PLC · LSE:IMB

Imperial Brands — Corporate Update (July 2009)

16 slides from Imperial Brands's corporate update, Jul 1, 2009

  1. Slide 1: Ain Harrouda Factory - Morocco Factory Visit

    Ain Harrouda Factory Morocco Factory Visit 1 July 2009

  2. Slide 2: Laurent Chabanne, Lead Factory Manager, Morocco

    Laurent Chabanne Lead Factory Manager, Morocco 2

  3. Slide 3: History

    History 1931 Cigarette manufacturing in Casablanca 1994 Ain Harrouda factory opened, starting with only soft packs, mainly Marquise 2003 Integration into Altadis: Casablanca factory closed; production transferred to Ain Harrouda 2005 Ain Harrouda goes to three shifts 2006 First production of interna

  4. Slide 4: Manufacturing in Morocco

    Manufacturing in Morocco Tobacco Growing El Moudzine Tetouan 1,500 tonnes Leaf processing 1.3bn Dark cigarettes 1,500 tonnes Ain Harrouda 11.4bn cigarettes 4

  5. Slide 5: Production Volume

    Production Volume cigarettes 14 13.7 13.0 12.7 12.0 12 10.2 cigarettes bn 10 8 6 4 2 0 FY06 FY07 FY08 FY09E FY10E Ain Harrouda Tetouan Note: Imperial estimates 5

  6. Slide 6: Productivity Improvement

    Productivity Improvement cigarettes 700 Headcount Volume 14 650 12 600 10 cigarettes bn headcount 550 8 500 6 450 7.7 9.9 10.5 10.6 13.0 4 400 350 2 300 0 FY06 FY07 FY08 FY09E FY10E million sticks per paid hours Note: Imperial estimates 6

  7. Slide 7: Ain Harrouda: Key Facts

    Ain Harrouda: Key Facts ƒ Current production volume c.11.4bn cigarettes ƒ Factory size: 100,000 sq m Production area: 24,500 sq m Office area: 1,000 sq m ƒ Headcount: 509 employees ƒ Organisation: 2 shifts in Primary 3 shifts in Secondary 7

  8. Slide 8: Conversion Cost

    Conversion Cost cigarettes 100 99 100 90 88 80 index 70 69 60 59 50 40 FY06 FY07 FY08 FY09E FY10E Note: Imperial estimates 8

  9. Slide 9: Tobacco Waste

    Tobacco Waste 16 14 14 % tobacco waste 12 11 10 9 8 7 6 5 4 2 0 FY06 FY07 FY08 FY09E FY10E Note: Imperial estimates 9

  10. Slide 10: Quality Improvement

    Quality Improvement 1400 1269 Imperial 1200 1085 PQRS 1000 implemented quality index 800 661 600 400 200 0 FY06 FY07 FY08 FY09E FY10E Note: Imperial estimates; PQRS = Product Quality Rating System 10

  11. Slide 11: Integration into Imperial

    Integration into Imperial Product development √ Finance √ Technical Development √ Supply Chain Management √ Business Quality √ Project Management √ Security √ Human Resources √ OHSE √ “We all speak the same language” 11

  12. Slide 12: Integration into Imperial: health, safety and environment

    Integration into Imperial health, safety and environment Audits have been performed and actions developed Employee Management Personnel protected equipment Done Safety shoes Done Pedestrian way separation Done 5S application Ongoing Water Control Ground water usage Ongoing Wastewater system upgrade

  13. Slide 13: Integration into Imperial: rearrangement of equipment (1)

    Integration into Imperial rearrangement of equipment (1) Primary – ... fromto August January2009 2009 … 13

  14. Slide 14: Integration into Imperial: rearrangement of equipment (2)

    Integration into Imperial rearrangement of equipment (2) from Secondary – ... January2009 to August 2009... 14

  15. Slide 15: Integration into Imperial: work groups

    Integration into Imperial work groups BEFORE AFTER 15

  16. Slide 16: Factory Tour

    Factory Tour six stages to discover our processes 8 7 4 HAVE 3 5 2 Warehouses Primary A PLEASANT VISIT 1 6 Secondary 16

Imperial Brands — Corporate Update (July 2009) on 6ix