Nexmetals Mining Corp. · TSXV:NEXM

Nexmetals Mining — Investor Presentation (September 2025)

24 slides from Nexmetals Mining's investor presentation, September 2025

  1. Slide 1: The Future Critical Metals Supply Chain Company

    The Future Critical Metals Supply Chain Company: Rapidly Advancing Two Past SEPTEMBER 2025 | INVESTOR PRESENTATION TSX-V: | NASDAQ: |

  2. Slide 2: Cautionary Note Regarding Forward-Looking Statements

    CAUTIONARY NOTE REGARDING FORWARD-LOOKING STATEMENTS This presentation (the “Presentation”) is to be used by the recipient for informational purposes only and does not purport to be complete or contain all of the information that may be material to the current or future business, operations, financi

  3. Slide 3: Important Cautionary and Other Information

    IMPORTANT CAUTIONARY AND OTHER INFORMATION Caution Regarding Historic Data Certain scientific and technical information in this Presentation, including historic data compilation at the Selebi and Selkirk projects, are historic in nature. Reference should be made to the full text of the Selebi Techni

  4. Slide 4: Global Copper Supply: A Growing Gap

    GLOBAL COPPER SUPPLY: A Growing Gap The World Needs More Copper — But Where Will It Come From? Copper Supply and Demand Imbalance 2023-2050 BHP estimates that global copper demand will increase by 1 million metric tons annually Beginning as early as 2024, and accelerating through to 2050, demand for

  5. Slide 5: Click on image to view site overview video

    Click on image to view site overview video

  6. Slide 6: Safe, Scalable, And In Mining Friendly Botswana

    DISTRICT SCALE CRITICAL METALS SUPPLY CAMP: Safe, Scalable, And In Mining Friendly Botswana PAST-PRODUCING & PERMITTED Cu-Ni-Co-PGE MINES Selebi and Selkirk Mines — proven assets ready to deliver. EACH DEPOSIT OPEN AT DEPTH Strong potential for underground expansion and long-life, scalable productio

  7. Slide 7: Historical Evolution of Selebi & Selkirk Mines

    HISTORICAL EVOLUTION OF Selebi & Selkirk Mines 2020 INDICATIVE OFFER 2024 NEXM PUBLISHES NEXM selected as preferred bidder in liquidation SELEBI NI 43-101 MRE process. Provided exclusivity for further due Indicated: 3.0 Mt @ 2.92% CuEq diligence. Inferred: 24.7 Mt @ 3.40% CuEq SELEBI MINES 2015 SMEL

  8. Slide 8: Global Cu-Ni Sulphide Assets

    Assets Global Cu-Ni Sulphide ASSET COMPANY TONNAGE GRADE ACQUISITION COST PERMITTING IN PLACE INFRASTRUCTURE IN PLACE NOTE 3.40% CuEq Inferred Acquired by NEXM January 2022. Initial MRE at 24.7 Mt Inferred 2.92% CuEq Indicated SELEBI MINE Selebi Main and Selebi North in accordance 3.0 Mt Indicated*

  9. Slide 9: Selebi Mine

    Selebi Mine SELEBI NORTH SHAFT 4 (733 METER LEVEL) TSX-V: NEXM | NASDAQ: NEXM 9

  10. Slide 10: Selebi Benefits

    Selebi Benefits BOTSWANA IS A TIER 1 MINING JURISDICTION Government support in mining industry to generate employment RESOURCE UPDATED, EXPLORATION GROWTH POTENTIAL • Initial NI 43-101 compliant resource August 2024 OPERATIONAL ADVANTAGES • Untested borehole electromagnetic plates and further in-fil

  11. Slide 11: Expansion Drilling Between Selebi Mine Deposits

    PROVEN GEOPHYSICAL Expansion Drilling Between Selebi Mine Deposits Hole ID Length (m) CuEq% SNUG-24-096-W1 12.90 4.12 and 24.50 2.17 SNUG-24-102 17.00 2.02 Including 8.10 2.42 SNUG-24-114 21.30 4.14 Including 13.80 4.40 SNUG-24-144 14.40 3.99 SNUG-24-172 14.20 5.14 SNUG-25-184 13.50 3.68 and 6.25 2.

  12. Slide 12: Selkirk

    : \ ye Francistown \, tp Y tote i \ Historic Mine Selkirk Mining Lease @ Primary Road @V Secondary Road NexMetals MINING CORP Selkirk TSX-V: NEXM Selkirk Mine Tailings Dam Phoenix Mine ailirigs Storage 5km

  13. Slide 13: Selkirk Resource

    Selkirk Resource INITIAL FOCUS Surface drilling program for resource expansion and metallurgical flowsheet development. TESTING UNDERWAY The drill core from this program will also be used for preliminary XRT pre concentration testing. HISTORIC CORE RESAMPLING The company will continue a resampling p

  14. Slide 14: Selkirk Mine

    Selkirk Mine Potentially Significant Untapped Value • Mining license covers approximately 14.6 square kilometres and the four prospecting licenses cover 126.7 square kilometres • Tati Nickel Mining Company mined high grade Cu-Ni massive sulphides to produce 1 million tonnes at 1.5% Cu and 2.6% Ni be

  15. Slide 15: Q4 2025 Catalysts: Innovative Value Growth Model

    Q4 2025 CATALYSTS: Innovative Value Growth Model CONTINUOUS DRILLING ONGOING STUDIES DATA DRIVEN RESULTS • SELEBI MINES • METALLURGICAL SAMPLING AND • BHEM PRECISION TARGETING • Selebi North Underground TESTING Resource Expansion Drilling • Selebi Metallurgical Testing • HINGE Drilling Between Seleb

  16. Slide 16: Capital Structure

    Capital Structure (Est. Post Consolidation as at August 29, 2025) 21,449,318 Issued & Outstanding 36% 22% 22% 20% FIORE LED 2025 MANAGEMENT, EDGEPOINT INVESTMENT OTHER NON-BROKERED DIRECTORS & SELECT GROUP INSTITUTIONAL 1,035,423 9,428,996 PRIVATE PLACEMENT SHAREHOLDERS & RETAIL Options Warrants 88,

  17. Slide 17: Management

    Morgan Lekstrom EXPERIENCED, DISCOVERY FOCUSED CEO & Director Management • • 20+ years in mining, led NexGold’s turnaround via strategic M&A and debt restructuring. Global project experience with Freeport, Rio Tinto, and Golden Star (Ghana) • Led engineering at Sabina Gold & Silver’s Back River proj

  18. Slide 18: Board of Directors and Strategic Advisors

    Paul Martin Morgan Lekstrom TRUSTED, EXPLORATION-DRIVEN CHAIRMAN CEO & DIRECTOR Board of Directors Over 30 years of executive leadership in mining, including CEO and CFO roles at major TSX- and NYSE-listed companies. 20+ years in mining, with leadership roles at NexGold, Freeport, Rio Tinto, and Gol

  19. Slide 19: Botswana: A Proven Mining Powerhouse

    BOTSWANA A Proven Mining Powerhouse Botswana: A Tier-One Mining Jurisdiction STABLE POLITICAL ENVIRONMENT Botswana has long had a stable political system Long history of rule-of-law, competitive tax rates, no foreign exchange with low corruption, which is crucial for investor controls and no require

  20. Slide 20: The Next Major Critical Metals Player?

    The Next Major Critical Metals Player? PERMITTED & PROVEN: EXPLORATION UPSIDE: TIER-ONE JURISDICTION: BUILT-IN ADVANTAGE: Past-producing Selebi and Selkirk Untested EM plates along 2 km Botswana – safe, stable, mining- Two shafts, grid power, water, mines – Ready rapid re-start and corridor between

  21. Slide 21: ESG Commitment & Impact

    ESG Commitment & We are committed to a sustainable future, aligning with ESG principles to drive economic Impact prosperity, protect the environment, and enrich our communities. Advancing responsible mining, promoting innovation, and ensuring a brighter future for Botswana and its people. Economic P

  22. Slide 22: Contact Us

    Contact Us Phone +1 833-770-4334 Email Jaclyn Ruptash​ Jaclyn@NexMetalsMining.com​ VP ​Communications & Investor Relations Address Suite 3123, 595 Burrard Street P.O. Box 49139 Vancouver, BC V7X 1J1 TSX-V: NEXM | NASDAQ: NEXM 22

  23. Slide 23: Initial NI 43-101 Mineral Resource Estimate On The Selebi Mine

    EFFECTIVE DATE: JUNE 30, 2024 Initial NI 43-101 Mineral Resource Estimate On The Selebi Mine Classification Tonnage Grade Contained Metal Deposit Mt % Cu % Ni kt Cu kt Ni Selebi North 3.0 0.90 0.98 27 29 Indicated Total 3.0 0.90 0.98 27 29 Selebi Main 18.9 1.69 0.88 319 165 Inferred Selebi North 5.8

  24. Slide 24: Initial NI 43-101 Mineral Resource Estimate On The Selkirk Mine

    EFFECTIVE DATE: NOVEMBER 1, 2024 Initial NI 43-101 Mineral Resource Estimate On The Selkirk Mine Grade Contained Metal Classification Tonnage (Mt) Cu % Ni % Pd g/t Pt g/t CuEq* % Cu kt Ni kt Pd koz Pt koz Inferred 44.2 0.30 0.24 0.55 0.12 0.81 132 108 775 174 *CuEq% calculated using the formula Cu%

NexMetals Mining — Investor Presentation (September 2025) on 6ix