Sasol — Technical Presentation (September 2023)

20 slides from Sasol's technical presentation, Sep 21, 2023

  1. Slide 1: Sasol Limited Investor Site Visit | Mining Update

    SASOL LIMITED INVESTOR SITE VISIT | MINING UPATE Secunda and Mining Operations Copyright ©, 2023, Sasol

  2. Slide 2: Sasol executive leadership team

    Fleetwood Simon Riaan Priscillah Grobler Baloyi Rademan Mabelane President and Executive Vice Executive Vice Executive Vice Chief Executive Officer President: Energy President: Mining President: Energy Operations and Technology Hanré Charlotte Hermann Gerrit Viljoen Sarushen Pillay Rossouw Mokoena W

  3. Slide 3: Agenda

    AGENDA DAY 1 Management presentation Business overview Mining operations Underground mining tour Q&A DAY 2 Management presentation Secunda Operations Sustainability Secunda Operations site tour Copyright ©, 2023, Sasol 3

  4. Slide 4: Forward-looking statements

    Forward-looking statements Sasol may, in this document, make certain statements that are not historical facts and relate to analyses and other information which are based on forecasts of future results and estimates of amounts not yet determinable. These statements may also relate to our future pros

  5. Slide 5: What you will hear today

    What you will hear today  Progress on implementation of our operational mitigation plans  Update on quality improvement initiatives  Reserve replacement strategy Mining operations Hermann Wenhold Copyright ©, 2023, Sasol 5

  6. Slide 6: Overview of our mining operations

    Overview of our mining operations Coal supply: 62 kms Secunda  Coal feedstock to Secunda Operations (SO) for gasification and utility generation  Coal blended at our Secunda Coal Supply facility  Coal feedstock supplemented by Thungela’s Isibonelo colliery Sasolburg  Coal from Sigma Mooikraal Co

  7. Slide 7: What has changed in our mining operations

    What has changed in our mining operations  Mining the Secunda reserve base since 1970 and have progressed into poorer quality, more geologically complex reserve areas  Reserve areas towards the boundary have higher inherent ash and sinks Typical in-seam inorganic content (Included in total and gre

  8. Slide 8: Sustained productivity improvement at Secunda Collieries is key to our future

    Sustained productivity improvement at Secunda Collieries is key to our future  Productivity reduction experienced since Fulco was implemented 24 months ago  Secunda collieries targeting >1 200t/cm/s Productivity (t/cm/s) 1,273 sustainable productivity by FY24/5 1,191 1,219 1,202 1,148 1,131 1,200

  9. Slide 9: Driving targeted initiatives to address our challenges

    Driving targeted initiatives to address our challenges Productivity initiatives Coal quality initiatives Full potential programme Operational Integrated quality improvement and blend initiatives management Improved Equipment coal supply High Care, High Standards culture reliability and ensuring avai

  10. Slide 10: Realising Fulco benefits through the Full Potential programme

    Realising Fulco benefits through the Full Potential programme  Launched in Jan’23 to drive productivity improvement through:  Optimising and embedding safe production processes to improve cutting time  Capability upliftment prioritising basic mining process skills  Improving monitoring and effec

  11. Slide 11: Additional complex-wide productivity improvement initiatives

    Additional complex-wide productivity improvement initiatives Improved equipment reliability High Care, High Standards culture Improved mining flexibility and availability  Leadership engagement and active  Review maintenance strategy and  Increase stonework resources to coaching to ensure mining

  12. Slide 12: Increasing flexibility through walk-on, walk-off sections

    Increasing flexibility through walk-on, walk-off sections  Walk-on, walk-off sections are created by using additional equipment in an existing From: To: section to cut coal and install roofbolts while the existing set of equipment and Introduce 5 walk-on, the next area are prepared for cutting walk

  13. Slide 13: Coal quality improvement initiatives

    Coal quality improvement initiatives Short term Medium term Operational improvement Enhancing quality and Improved quality of coal Destoning initiatives blend management purchases  CM1 operator training to  Evaluating new online coal  Finalising fixed term  Feasibility study completed in improve

  14. Slide 14: Various long-term coal supply sources being considered

    Various long-term coal supply sources being considered SO RUN-OF-MINE SUPPLY BASED ON SO DEMAND  Current shortfall in SO coal demand exacerbated by end of 20-year Isibonelo supply in June 2025 External purchases  Supply gap of 3-4 mtpa up to FY25 to be closed by Isibonelo additional external purch

  15. Slide 15: FY23 delivery - maintaining momentum into FY24

    FY23 delivery - maintaining momentum into FY24 5% improved productivity FY23 coal stockpile Phased rollout of Full for Secunda collieries maintained at target levels Potential programme in H2 FY23 Additional stonework Introduction of walk-on, Progressing safety sections and resources walk-off sectio

  16. Slide 16: FY24 outlook

    FY24 outlook Productivity Coal stockpile Improved productivity of Stockpile maintained at Secunda collieries to 975 - >1.5mt ensuring effective 1 100 t/cm/s, supported by coal blending ongoing full potential roll-out Mining unit cost1 Capital R530 – R580 per production ton Capital to include general

  17. Slide 17: Summary: What you heard today

    Summary: What you heard today Implementation of Various long-term Improvement productivity Progressing coal coal supply sources initiatives initiatives - quality solutions being considered underpinned by >1 200 t/cm/s in with destoning to optimise 2030 our safety FY24 for Secunda online by FY261 res

  18. Slide 18: Copyright ©, 2023, Sasol

    Copyright ©, 2023, Sasol 18

  19. Slide 19: Abbreviations and definitions

    Abbreviations and definitions bn billion SA South Africa Capex Capital expenditure SAF Sustainable Aviation Fuels CFC Cash fixed costs SO Secunda Operations CM Continuous Miner SO2 Sulphur dioxide CSI Corporate Social Investment t/cm/s tons per continuous miner per shift ERR Emission Reduction Roadm

  20. Slide 20: Additional information

    Additional information  JSE: SOL ORDINARY SHARE  ISIN: ZAE000006896  NYSE: SSL  Cusip: 803866300  Depositary Bank: ADR JP Morgan Depositary Receipts  ISIN: US8038663006  Ratio DR:ORD – 1:1 Investor Relations Media investor.relations@sasol.com alex.anderson@sasol.com +27 10 344 9280 +27 71 600