  1. Slide 1: Oksut Project Progress Presentation

    Oksut Project Progress Presentation 28 Mayıs 2019 Develi, Kayseri May 2019 1

  2. Slide 2: Content

    Content • Introduction Dr. Alper Sezener, General Manager • Project Construction Update Graeme Rapley, Project Director • Operational Readiness Process Rodney Chanin, Operation Director • Exploration & Business Development Activities Dr. Alper Sezener, General Manager • OHS & Sustainability Update Ö

  3. Slide 3: Introduction: Centerra Gold Vision and Values

    centerraco.to | ntroduction Centerra Gold Vision and Values Building a Team-Based Culture of Excellence that Responsibly Delivers Sustainable Value and Growth centerraco.o 7 (||) ih om ES are May 2019 3

  4. Slide 4: General Overview

    (ll) agit General Overview centerraco.to ‘Sampothe BULGARIA Verna Bur ’ a | 1 td rel y Bosporus “GREECE Tobi ks 7 ‘Apxandroupols Turkey sorenia Laka! th CYPRUS Baniyas, International boundary ¢ orn National capital Paphos “ue Tartos erent Tripoli j LEB, Aes Mediterranean gent Road Sea Sidon, o 100 2

  5. Slide 5: Öksüt: Funded High Margin Gold Production

    Öksüt: Funded High Margin Gold Production Project Highlights Mine Type Open Pit, Heap Leach Avg. LOM Annual Production 110koz Au Avg. LOM AISC(1) (US$/oz) $490 Reserve Mine Life 8 years Development Capex (US$MM) $221 LOM Sustaining Capital(1) (US$MM) $10 Öksüt Gold Project P&P Reserves(2)(Moz) 1.3 A

  6. Slide 6: Key Milestones

    Key Milestones ● 4th November 2015 EIA Approval ● 6th June 2016 ESIA Approval ● 14th July 2016 Forestry Permit ● 11th August 2016 Operation Permit ● 12th January 2018 Pastureland Permit ● 25th March 2018 Main Access Road/Haul Roads Starts ● 25th April 2018 Heap Leach Pad and site infrastructure Star

  7. Slide 7: Project Construction

    Project Construction May 2019 7

  8. Slide 8: Construction Schedule

    Construction Schedule May 2019 8

  9. Slide 9: General Earthworks Plan – Ongoing Works

    General Earthworks Plan – Ongoing Works May 2019 9

  10. Slide 10: Project Overall Completion – as of May 2019

    Project Overall Completion – as of 12 May 2019 Construction Progress : 56 % (as of May 12, 2019) May 2019 10

  11. Slide 11: Major Packages % Completion Status

    Major Packages % Completion Status as of 12 May 2019 Project's Overall Completion 56 % 84 % First Gold Major Packages Site Wide Earth Works Construction 49 % Crusher MPEI Construction 75 % Raw Water Supply System 81 % Administration Buildings 52 % ADR Plant EPC 69 % Main Substation 90 % Lining Syste

  12. Slide 12: Site Photos

    Site Photos Administration Area May 2019 12

  13. Slide 13: Site Photos

    Site Photos HDPE Liner Heap Leach Pad Secondary Crusher Building ARD Plant May 2019 13

  14. Slide 14: Operational Readiness

    Operational Readiness May 2019 14

  15. Slide 15: Mining

    Mining *Resource/Reserve Update- 31 December 2018 May 2019 15

  16. Slide 16: Mining

    Mining Mining Progress May 2019 Keltepe Pit May 2019 May 2019 16

  17. Slide 17: Process

    Process ● Management in place and starting the phase-in of the crusher team first, ADR team to follow. ● Preparing for the commissioning of crusher plant in July. ● The metallurgical accounting and reporting system has been generated. ● Stacking plan for the first lift of HL is completed see below.

  18. Slide 18: Process

    Process ● Cyanide transportation schedule for 2019 and 2020 was completed which coincides with the Cn storage completion. ● Cyanide management plan works are being coordinated with the supplier. ● Activated Carbon and reagents order was placed for early August delivery. ● The site lab is constructed

  19. Slide 19: Maintenance

    Maintenance • Maintenance is closely following the construction progress and ensuring that is being done to an acceptable level. • Crusher and ADR asset registrations are completed in the systems. • Crusher circuit consumables, operating and critical spare parts have been identified and ordered. • C

  20. Slide 20: Exploration

    centerraco.to (||) itt, May 2019 20

  21. Slide 21: Tethyan Metallogenic Belt

    Tethyan Metallogenic Belt Öksüt Gold Project May 2019 *Sourced from MDRU 21

  22. Slide 22: Project Location and Prospects

    Project Location and Prospects Kayseri Öksüt Keltepe NW Gold Project Boztepe W Keltepe Boztepe Öksüt Gold Project Operation License Boundaries Buyuktepe Keltepe NW Keltepe Boztepe Guneytepe Guneytepe Buyuktepe Yelibelen Yelibelen May 2019 22

  23. Slide 23: 2019 Proposed Drilling Program

    2019 Proposed Drilling Program N Keltepe - Keltepe NW Oxide Au Resource + Supergene Cu target Boztepe West Porphyry Cu/Au Target Keltepe Pit Buyuktepe Oxide-Au Güneytepe Target Oxide-Au Extension Güneytepe Pit Yelibelen Oxide-Au Target May 2019 23

  24. Slide 24: OHS & Sustainability

    OHS & Sustainability May 2019 24

  25. Slide 25: Health and Safety Performance

    Health and Safety Performance Lag Indicators Critical Risks (CR’s) Preventative Activities (Highest to Lowest Occurrence) Total Reportable Injury Frequency YTD Y/E TARGET Critical Risk Categories QTD YTD Rate (TRIFR) #Safety Meetings 1291 2250 Mobile Equipment (Heavy & Light Target YTD Status 1 Vehi

  26. Slide 26: Environmental Performance

    Environmental Performance Total of Incident To date This Reporting Period 0 0 Date Raised Registration Number Location Incident Summary Corrective Close out Date Action - - - - - - * No reportable incident YTD Compliance Audits Projects & Initiatives Type # Findings % Complete Status Title Status Re

  27. Slide 27: Social Performance

    Social Performance Stakeholder Engagement # Community Meetings # Local Officials Visit # Total MTD YTD MTD YTD MTD YTD 19 81 4 31 23 112 Grievance Resolution # of unresolved Grievances # Grievance % resolved within the targeted timeframe (cumulative) MTD YTD MTD YTD MTD YTD 0 16 %0 %100 0 0 CSR/Comm

  28. Slide 28: Environmental Activities

    Environmental Activities ENVIRONMENTAL ACTIONS Actions Partners Status 1. Biodiversity Studies Prof Hayri DUMAN (Gazi Unv), - Flora Studies Cecilia AMOSSO (Golder Italy), On going Prof. Dr. Cem VURAL (Erciyes Unv) Prof. Dr. Cem VURAL (Erciyes Unv) , Prof. Dr. Osman İBİŞ (Erciyes Unv), - Fauna Studie

  29. Slide 29: Environmental Monitoring

    Environmental Monitoring May 2019 29

  30. Slide 30: ESAP Commitments

    centerraco.to lh ath ESAP Commitments OK: ILI “rar cousrectic recapeecalagetsresnatle ‘OBLIGATIONS LIST Jourenaemic tor pieces (ASYae. SUD, Cs. LT, Vere. uliltum ane Came. Sea ar) Jowastsiagosiodversiy {+ Develop and implement Flore Sevag lPsges:s57z0seti08- Sonamauaapauaa + fouseor om feteznaonemer

  31. Slide 31: CR & CSR

    CR & CSR Stakeholder Engagement Components Visit with General Manager to Mayor of Meeting with Local Media in Develi 18 March Çanakkale Victory and Develi Municipality on April, 2019 District on April, 2019 Martyrs’ Day event in Develi Center was attended on 18th of March, 2019 Newspaper announcemen

  32. Slide 32: LRP Programs

    LRP Programs LRP Programs LRP - 2019 Subject Date Status Income generating activities for users of Pastureland-Beekeeping May-December Completed Agricultural equipment support for users of Pastureland May-June On going Access to Grazing Areas and Agricultural Fields(Öksüt Quarter) February-April Com

  33. Slide 33: CSR Programs

    CSR Programs CSR Programs CSR- 2019 Subject Planned implementation period Status Support to Regional Cultural Festival and Sport Activities July-August Not Started Robotic Coding and Educational Brain Games Project for Students Career Days for High School Students May-June On going Theater for 23rd

  34. Slide 34: HR & Training

    centerraco.to (||) itt, OK: T. HR & Training May 2019 34

  35. Slide 35: Manpower Tables

    Manpower Tables Numbers are updated as of May 16th,2019 35 May 2019

  36. Slide 36: Manpower Tables

    Manpower Tables 2019 OMAS Manpower Plan 93 as of May 16th, OMAS Contractors May 2019 36

  37. Slide 37: Training

    centerraco.o Training ree ws pau tice Safty rings “OPP TiCIiae Training Hours 4% 10% WSHS Facilitator Training 1% Work Safe - Home Safe 2 2% B induction 56% Work Safe - Home Safe 1 20% Training Hours Number of Attendees 2015 2016 2017 2018 2019 Total 2015 2016 2017 2018 2019 Total Induction 1,450 22

  38. Slide 38: THANK YOU! Questions? Issues!

    THANK YOU! Questions? Issues! May 2019 38