Ronin Resources — Investor Presentation (October 2023)

19 slides from Ronin Resources's investor presentation, Oct 3, 2023

  1. Slide 1: Hornby Lake Lithium Project

    For personal use only HORNBY LAKE LITHIUM PROJECT Ontario, CA Hornby Lake Canada Greenstone

  2. Slide 2: Disclosures & Disclaimers

    Disclosures & Disclaimers Not an offer of securities This document has been independently prepared by Ronin Resources Limited (Ronin) and is provided for informational purposes only. This document does not constitute or contain an offer, invitation, solicitation or recommendation with respect to the

  3. Slide 3: Competent Person Statement

    For personal use only Competent Person Statement The Exploration Results and Targets for the Vetas Coal Project contained in this presentation have been extracted from the Independent Geologist’s Report included in the Company’s IPO Prospectus dated 29 October 2021, a copy of which was released to A

  4. Slide 4: Capital Structure

    For personal use only Capital Structure Ronin Resources Shares Issued & Outstanding 36,825,010 Unlisted $0.30c options 3,925,000 Performance Rights 200,000 Fully Diluted 40,950,010 Market Capitalisation @ $0.14 ~$5.16m $3.94M Cash at Bank (30 June 2023) Enterprise Value ~$1.22M | Hornby Lake Lithium

  5. Slide 5: Team

    Team Joseph van den Elsen (BA, LLB, Grad Dip Environment, Energy & Resources Law, Grad Dip Mineral Exploration Geoscience and Master of Science For personal use only (Mineral Economics) (in progress) Executive Chairman Joseph is a dual Australian/Colombian citizen who founded Ronin Resources in 2017

  6. Slide 6: Project Locations

    For personal use only Project Locations Ontario, CA Canada Hornby Lake Project Greenstone hosted lithium targets Colombia South America Vetas Coal Project Large high-grade, shallow thermal coal deposit | Hornby Lake Lithium Project 6

  7. Slide 7: Hornby Lake Greenstone Project Overview

    For personal use only Hornby Lake Greenstone Project Overview • 123 km2 exploration package, located within the Red Lake mining district of Ontario, Canada. The Hornby Lake Greenstone property has seen limited exploration with historical work targeting shear zone hosted base metal deposits. • The OB

  8. Slide 8: Bear Head Lake Fault Zone Regional Geology

    For personal use only Bear Head Lake Fault Zone Regional Geology • The mineralization at Frontier’s PAK and Spark deposits is hosted within the Bear Head Lake Fault Zone (BHLFZ) which is a NW trending shear zone controlling the emplacement of fertile source granites • Emplacement of the PAK and Spar

  9. Slide 9: Hornby Lake Project Major Prospectivity Elements

    Hornby Lake Project Major Prospectivity Elements For personal use only A review of the Hornby Lake Project identified four general prospectivity elements, indicative of potential for lithium mineralization. These include: ✓ Potential fertile granites: The project area is host to at least two 2-mica

  10. Slide 10: Hornby Lake Project Extensive pegmatite targets

    For personal use only Hornby Lake Project Extensive pegmatite targets • 5 pegmatites have been mapped in the north of the claim block (labelled A – E) • The dikes are mentioned to vary from a few cm in width to 50m and radiate either from a source near North and South Dome on the northeast or from a

  11. Slide 11: Fieldwork Targeting

    For personal use only Fieldwork Targeting • A first pass fieldwork program has been developed to explore for lithium mineralization in consultation with CSA Global with the objective of confirming the known pegmatites and 2 mica granites and ground truthing the interpreted pegmatite targets • A tota

  12. Slide 12: Current Infrastructure | Power and Access Upgrades

    For personal use only Current Infrastructure | Power and Access Upgrades Government Funded Infrastructure Upgrades • Government is partnering with First Nations communities to build the $2 billion dollar Watay power network with completion targeted for 2023-2024. • Multiple studies are currently und

  13. Slide 13: Near Term Milestones

    For personal use only Near Term Milestones September 2023 November 2023 Fieldwork commenced Geochemical analysis results (Announced on ASX 11 September 2023) Q3 2023 Q4 2023 Q1 2024 October 2023 Q1 2024 Preliminary fieldwork Phase 2 Exploration report and phase 2 exploration planning | Hornby Lake L

  14. Slide 14: Comparable Listed Company Analysis

    Comparable Listed Company Analysis North Spirit Lake Regional Lithium Exploration Companies – Pre and Post Discovery For personal use only 350 300 300 250 Market Cap 200 $M 150 100 65.7 50 14.3 8.8 4.8 0 Frontier Lithium Inc. (FL.VN) Critical Resources (CRR:ASX) Patriot Lithium (PAT:ASX) Blaze Miner

  15. Slide 15: Vetas Coal Project Highlights

    For personal use only Vetas Coal Project Project Highlights • Large high-grade, shallow thermal coal deposit; • 100% owned by Ronin, with no contingent asset payments; • 30 Year Mining Contract, renewable for a further 30 years; • Mine Plan (PTO) and an accompanying environmental license application

  16. Slide 16: Vetas Coal Project JORC Compliant Exploration Target

    For personal use only Vetas Coal Project Large high-grade, shallow JORC Compliant Exploration Target • The Company has compiled a database of 11 historical coal holes, 32 petroleum holes and 25 seismic lines, to complement its own surface mapping, satellite imagery and sample collection and analysis

  17. Slide 17: Vetas Coal Project Coal Quality

    Vetas Coal Project Coal Quality For personal use only • To date, coal quality data made available from trenching and surface samples shows high calorific value coal, in excess of the Colombian thermal export benchmark (API10), which is also low in ash and sulfur. Samples demonstrate the potential fo

  18. Slide 18: Vetas Coal Project Permitting Status

    For personal use only Vetas Coal Project Permitting Status • As detailed in the Permitting Update – Vetas Project announcement released on ASX on 14 February 2023, the company has submitted a Mine Plan (PTO) and an accompanying environmental license application (PMA) modelled on a near-term, low cap

  19. Slide 19: Contact Us