Storm Exploration Inc · TSXV:STRM
Storm Exploration — Investor Presentation (October 2026)
15 slides from Storm Exploration's investor presentation, October 2026
Slide 1: Canadian Mineral Exploration: Advancing Three District-Scale Projects
TSX-V: STRM CANADIAN MINERAL EXPLORATION Advancing Three District-Scale Projects in Northwestern Ontario October 2026 TSX-V: STRM TSX-V: STRM 1
Slide 2: Forward Looking Statements
Forward Looking Statements This presentation may contain “forward-looking statements.” These forward-looking statements are made as of the date of the PowerPoint presentation and Storm Exploration Inc. (“Storm” or the “Company”) does not intend, and does not assume any obligation, to update these fo
Slide 3: Company Overview: Essential for Shareholder Value Creation
Company Overview Essential for Shareholder Value Creation Prioritizing Strong Strategic Immense Stakeholder Capital Position Land Package Potential Upside Relationships ✓ Exploration Agreements ✓ Low share count – ✓ Ontario: Home to 200Moz + ✓ Limited modern signed with First Nations in 36.6M I/O go
Slide 4: Prioritizing Stakeholder Relationships
Prioritizing Stakeholder Relationships Increases Operational Certainty Corporate Governance Storm seeks to foster investor, stakeholder & rights-holder confidence by adopting policies that ensure the highest level of corporate integrity & business ethics. First Nations & Community Relationships Stor
Slide 5: Strong Capital Position & Team
Strong Capital Position & Team Capital Structure Management & Directors 36.6M Bruce Counts, P.Geo Joanne Price, P.Geo President, CEO & Director QP, Director, Chief Technical Consultant Shares Issued & Outstanding Taylor Niezen, B.Comm. CFO & Corporate Secretary Rob L’Heuruex, P.Geo Independent Direc
Slide 6: Strategic Land Package in Proven Jurisdiction
Ontario, Canada Strategic Land Package in Proven Jurisdiction •8 drill-confirmed gold occurrences •No drilling since 1980’s Home to +200Moz of Gold Production •Precious & base metal potential •Road accessible Storm p orat on ro t •2 targets: VMS & high-grade gold rod n od •Road accessible n a t rod
Slide 7: Gold Standard Property
Gold Standard Property Immense Potential Upside 1900 – 1903 3 historical high-grade gold mines found 1969–1971 7,636 ha International Nickel Co. – All 4 drill holes: • < 50m in length • Intersected sulphide mineralization • Revealed Cu & Zn mineralization • Not assayed STORM’S Modern Exploration • L
Slide 8: A New VMS Discovery. What's Next?
A New VMS Discovery. What’s Next? IDENTIFIED TESTED CONFIRMED UPCOMING Geophysics + Geology New VMS System Geological Update Drill Program + Geochemistry Discovered Expected Imminently Geology and mineralized Identified evidence Completed All holes intersected intersection widths to be reported of p
Slide 9: What Makes VMS Deposits Compelling?
What Makes VMS Deposits Compelling? VMS Deposits Often: Contain Multiple offering exposure to many commodities. Canada hosts some of the world’s largest VMS Deposits: Valuable Metals Kidd Creek Mine (Timmins, Ontario) 1966 to present Yield High-Grade increasing potential value. • Produced over1: 772
Slide 10: Demonstrable Endowment with Modern Exploration
100% Ownership of 2 District-Scale Projects Demonstrable Endowment with Modern Exploration Miminiska-Fort Hope Greenstone Belt • Part of the mineral rich Uchi Geological Subprovince (>30 Moz Au production) • F r t o d d ov r mad n 1930’ Mineral Potential Recently Recognized • Storm’ a of th m n ka r
Slide 11: Keezhik Property
r o nt r pt t o k Samp 1 t Keezhik Property r Con rm d S rfa Show n Show n Prospective Geology h k rop rty Fa t nt rpr tat on ron Format on 12,480 ha KL-27 Results 3,4 • 18.9g/t Au over 1.5m • 12.9 g/t Au over 1.5m • 8 drill-confirmed high-grade gold • 13.3 g/t Au over 1.4m targets • Surface gold sh
Slide 12: Attwood Property
Attwood Property Underexplored Geology Weese Lake 23,230 ha Cu Showing • Last drilled in 1972 - only 19 historical drill holes • Host to historical Weese Lake Cu showing • Sulphide mineral showings found property-wide, including arsenopyrite in banded iron formations (BIF) • Strong correlation with
Slide 13: Upcoming Catalysts
Advancing Exploration Systematically & Cost Effectively Upcoming Catalysts H2 2026 H1 2027 Gold Standard Project Additional Ground VLF-EM Surveys ✓ Assays Results Focus: Geological Mapping & Soil Sampling ✓ Geological Mapping & Geophysics to refine target Expand on VMS Discovery Phase I Drill Progra
Slide 14: Key Reasons To Invest
Key Reasons To Invest Prioritized Tightly held Confirmed relationships w/ share structure – critical & precious FN & community 36.6M I/O metal endowment 100% ownership Limited modern Assays pending of 3 projects in exploration at from discovery of renowned NW district-scale new VMS system Ontario pr
Slide 15: Contact: info@stormex.ca
info@stormex.ca +1 (604) 506-2804 Stormex.ca TSX-V: STRM TSX-V: STRM TSX-V: STRM 15
Storm Exploration — Investor Presentation (October 2026) on 6ix