Waratah Minerals Limited · ASX:WTM

Waratah Minerals — Battery Minerals — Investor Presentation (August 2021)

13 slides from Waratah Minerals's investor presentation, August 2021

  1. Slide 1: Drilling Holes Doing Deals

    DRILLING HOLES DOING DEALS AUGUST 2021

  2. Slide 2: Agenda

    1. Corporate Snapshot 2. Montepuez/Balama Graphite Project, Mozambique 3. Staveley-Stawell Gold Copper Project, Victoria 4. Russells Copper Project, Western Australia 5. Next Steps 2

  3. Slide 3: Tirupati Graphite (TPG) – Transaction Summary

    TIRUPATI GRAPHITE (TPG) – Transaction Summary (Please also see ASX release dated 17th August 2021) 1. A$12.5M in cash and shares to Battery Minerals Limited (BAT) 2. A$1.5M cash and A$11M in TPG shares 3. A$5.5M TPG shares 8 months escrow from completion 4. A$5.5M TPG shares 20 months escrow from co

  4. Slide 4: Tirupati Graphite (TPG)

    TIRUPATI GRAPHITE (TPG) (Please also see ASX release dated 17th August 2021) 1. TPG is AIM/OTCQ listed graphite producer and advanced technology company 2. Operating cashflow positive from 2 Madagascar based graphite mines, full suite of downstream processing in India 3. Graphite industry leaders si

  5. Slide 5: Victoria – Significant Opportunity

    VICTORIA – SIGNIFICANT OPPORTUNITY 1. https://earthresources.vic.gov.au/geology- exploration/minerals/metals/gold 6

  6. Slide 6: Large Very Prospective Landholding

    LARGE VERY PROSPECTIVE LANDHOLDING • High value deposits on our doorstep • 721sqkm of under-explored tenure (granted Oct 2020)* • Last exploration effort in the 1990s (Gold A$400/oz) • Prospective for orogenic gold, porphyry copper, VHMS, and epithermal base metal deposits. • 67 km of mineralised Mo

  7. Slide 7: EL6871 – Outcrop vs Cover (DTM)

    EL6871 – OUTCROP VS COVER (DTM) • 72% of project area under cover (only 28% outcropping basement) • Majority of prospects are outcropping • Currently testing effectiveness of soil sampling over transported gravels and alluvial deposits • Modern cost-effective exploration will work 8

  8. Slide 8: EL6871 – Outcrop vs Cover (TMI)

    EL6871 – OUTCROP VS COVER (TMI) • 72% of project area under cover (only 28% outcropping basement) • Majority of prospects are outcropping • Currently testing effectiveness of soil sampling over transported gravels and alluvial deposits • Modern cost-effective exploration will work 9

  9. Slide 9: EL6871 – Drilling Statistics (TMI)

    EL6871 – DRILLING STATISTICS (TMI) • This is a large project • No significant exploration since 1990’s • Only 1,008 drillholes 14x DD, 12 at Moyston workings) • 46% of drillholes < 25m • 78% of drillholes < 50m • Average depth 36m 1 0

  10. Slide 10: Russells Copper Project

    RUSSELLS COPPER PROJECT • Halls Creek Tectonic Zone – confluence of major structures • Only 13 historic drill holes • Copper anomalism traced over 16km with up to 30% Cu at surface. • Cracking EM anomalies • Vendors are traditional owners from Kimberley • Land access agreements in place 11

  11. Slide 11: Russells Copper Project

    RUSSELLS COPPER PROJECT • Halls Creek Tectonic Zone – confluence of major structures • Only 13 historic drill holes • Copper anomalism traced over 16km with up to 30% Cu at surface. • Cracking EM anomalies • Vendors are traditional owners from Kimberley • Land access agreements in place 12

  12. Slide 12: Next Steps

    NEXT STEPS 1. Lodge notice of meeting for shareholder approval Mozambique 2. Complete transaction Graphite Projects 3. Transfer assets to Tirupati Graphite and receive $12.5M in cash and shares 1. Recommence drilling in September/October 2. Commence project wide 200 metre spaced airborne gravity sur

  13. Slide 13: Disclaimer

    DISCLAIMER • The information in this report that relates to Battery Minerals’ • The information in this report that relates to Exploration Results from Forward Looking Statements Mineral Resources or Ore Reserves is a compilation of previously published data for Battery Minerals’ Stavely-Stawell Cop

Battery Minerals — Investor Presentation (August 2021) on 6ix