Homerun Resources Inc. · TSXV:HMR

Homerun Resources — Investor Presentation (April 2024)

24 slides from Homerun Resources's investor presentation, April 2024

  1. Slide 1: Business Plan Presentation April 2024

    CAD-TSXV: HMR USA-OTC: HMRFF GDR-WKN: 5ZE / A3CYRW HPQ SILICA SOLUTIONS MINING TO MANUFACTURING BUSINESS PLAN PRESENTATION APRIL 2024 WWW.HOMERUNRESOURCES.COM

  2. Slide 2: Disclaimer and Forward-Looking Statements

    DISCLAIMER AND FORWARD-LOOKING STATEMENTS FORWARD STATEMENTS INCLUDE This presentation has been prepared for Homerun Resources Corporation (HMR). This document contains background information about the resource projects which are current at the date of this presentation. The presentation is in summa

  3. Slide 3: Our Vision & Mission

    OUR VISION & MISSION VISION Our vision is to be a leading materials company in the high-purity (HPQ) silica energy and industrial verticals. MISSION Our mission is to provide our customers with the highest quality materials, using sustainable and responsible practices, and to continuously improve ou

  4. Slide 4: Business Plan Roadmap

    BUSINESS PLAN ROADMAP Phase 3 – Vertical Integration Phase 1 – HPQ Silica Supply Homerun is driving toward revenue and at the same time, Homerun has announced multiple agreements to under Phase 3, executing on engineering and R&D plans to OUR GOALS secure a substantial supply of Silica from the Belm

  5. Slide 5: Business Plan Phase 1: HPQ Silica Supply

    BUSINESS PLAN PHASE 1 HPQ SILICA SUPPLY

  6. Slide 6: Phase 1 – HPQ Silica Supply

    PHASE 1 – HPQ SILICA SUPPLY GOAL: 100 Million Tonnes of Owned and Permitted Raw Silica Sand Resources by End of 2024 SILICA RESOURCES RESOURCE PERMIT STATUS CBPM Lease 100 MM Tonnes - MRE to Permit Aristoteles Chaves da Silva Tonnes TBD - 69.4 ha Concessions / 4 Applications 3/4 Applications OK - 79

  7. Slide 7: Verified HPQ Quality

    VERIFIED HPQ QUALITY GOAL: Thermal Processing Si Grade > 99.99 = US$500 per Tonne Standard Physical Processing: Si Grade > 99.985 = US$225 per Tonne Extremely low Iron (Fe) Content Suitable For Glass Products

  8. Slide 8: Average USD Prices for HPQ Silica Grades

    AVERAGE USD PRICES FOR HPQ SILICA GRADES • HMR Raw (In Ground) Material Grades AVG +99.75% Si02 • Standard Physical Processing Achieves Grade +99.985% Si02 • GOAL (Testing Underway) Thermal Processing Grade of +99.99% Si02 • Pyramid is representation of market size per use case.

  9. Slide 9: Business Plan Phase 2: Infrastructure & Revenue

    BUSINESS PLAN PHASE 2 INFRASTRUCTURE & REVENUE

  10. Slide 10: Phase 2 – Infrastructure & Revenue

    PHASE 2 – INFRASTRUCTURE & REVENUE GOAL: Production of Processed Silica in 2024 • Immediate plan is to move the BELMONTE DISTRICT extracted silica sand from Santa Maria Eterna (the mine) to tide • Mine Infrastructure water through Belmonte. • Road Infrastructure • From Belmonte the silica sand • Pow

  11. Slide 11: Phase 2 – Port of Ilheus

    PHASE 2 – INFRASTRUCTURE & REVENUE GOAL: Production of Processed Silica in 2024 PORT OF ILHEUS • Storage Facility • Processing Facility • Loading Facility • Shipping Facility • Energy Infrastructure • Recent Significant Government Funded Port Upgrades • Physical Upgrading of HPQ Silica PORT OF ILHEU

  12. Slide 12: Phase 2 – Port of Aratu

    PHASE 2 – INFRASTRUCTURE & REVENUE GOAL: Production of Processed Silica in 2024 PORT OF ARATU • Storage Facility • Loading Facility • Shipping Facility • Energy Infrastructure • Advanced/Thermal Processing Will Take Place at Port of Aratu • Nearby Major City Camacari • BYD Opening Facility in Camaca

  13. Slide 13: Phase 2 – Facility / Equipment

    PHASE 2 – INFRASTRUCTURE & REVENUE GOAL: Production of Processed Silica in 2024 FACILITY / EQUIPMENT PRE-CASH-FLOW Mine Extraction Service Provider -> Internal Mine Processing Wash, General Sort, Dry, Bag Mine Transport Service Provider -> Internal POST-CASH-FLOW Stage 2 - Processing Physical upgrad

  14. Slide 14: HPQ Silica Markets

    HPQ SILICA VIARKETS GLASS CERAMICS + SOLAR = AUTOMOTIVE + TOUCH SCREENS: + ARCHITECTURAL + CONTAINERS + FIBREGLASS + BATHTUBS + SANITARY WARE + SINKS 9. By BUILDING ©” ©” PRODUCTS A CHEMICALS Mpa Diiickirns 0 Cupsuietiage: SILICA + SILICA-BASED CHEMICALS — « SILICON CARBIDE * COMMERCIAL FLOORING * S

  15. Slide 15: HPQ Silica Markets

    HPQ SILICA MARKETS “Our entire society is built on sand. Sand is the primary substance used in the NORTH construction of roads, bridges, highspeed AMERICA trains and even land regeneration projects. Europe Sand, gravel and rock crushed together are melted down to make the glass used in Asia every wi

  16. Slide 16: Business Plan Phase 3: Vertical Integration

    BUSINESS PLAN PHASE 3 VERTICAL INTEGRATION

  17. Slide 17: Phase 3 – Research & Development 2024

    PHASE 3 – VERTICAL INTEGRATION RESEARCH & DEVELOPMENT - 2024 INTERNAL R&D (CTO - Dr. Mauro) BATTERY ANODES • Silicon Anodes and Hybrids NEXT GENERATION SOLAR • Perovskite Portfolio of NREL NREL (Dept of Energy - USA) PROCESSING • Upgrade processing of silica within the Enduring Energy Storage System

  18. Slide 18: Phase 3 – NREL Enduring Thermal Storage

    PHASE 3 – VERTICAL INTEGRATION RESEARCH & DEVELOPMENT - 2024 The National Renewable Energy Laboratory (NREL) is in the late stages of prototype testing a new thermal energy storage technology that uses inexpensive silica sand as a storage medium. Economic Long-Duration Electricity Storage by Using L

  19. Slide 19: Phase 3 – Silica in Solar and Batteries

    PHASE 3 – VERTICAL INTEGRATION RESEARCH & DEVELOPMENT - 2024 HPQ Silica sand is used to make the solar glass for both silicon and perovskite solar cells. HPQ Silica is also a raw material for silicon wafers that are the primary component of solar cells. These wafers are then processed and assembled

  20. Slide 20: Phase 3 – Glass Plant Planning 2024

    PHASE 3 – VERTICAL INTEGRATION GLASS PLANT PLANNING - 2024 GLASS PLANT DETAILS Location Port of Aratu in Camacari Engineering and Construction RFP Solar Glass Line Homerun Utilization Container Glass Line First Major Offtake Partner in H1 Float Glass Line First Major Offtake Partner in H2 Alt Power

  21. Slide 21: Share Structure

    SHARE STRUCTURE As of April 16, 2023 Exchange TSXV Common shares 52,586,825 Stock options - amount & avg price 9,200,000 $ 0.37 Warrants - amount and avg price 7,794,300 $ 0.34 Fully Diluted 69,581,125 FD Market Cap $ 34,790,563 $ 0.50 FD Insider Ownership % 20% Note: Ongoing CAPEX Finance discussio

  22. Slide 22: Management

    MANAGEMENT BRIAN LEENERS – CEO/DIRECTOR Brian Leeners received both his B.Comm. and LL.B. degrees from the University of British Columbia in 1992 and since that time has been focused on the management of private and public venture companies. In 2002, he founded Nexvu Capital Corp. which is a venture

  23. Slide 23: Contact Us for More Information

    CONTACT US FOR MORE INFORMATION Address Our Website 2110 - 650 West Georgia Strteet www.homerunresources.com Vancouver, British Columbia, Canada CEO - Brian Leeners Business Development brianleeners@gmail.com info@homerunresources.com WhatsApp: +1 604-862-4184

  24. Slide 24: Thank You

    CAD-TSXV: HMR USA-OTC: HMRFF GDR-WKN: 5ZE / A3CYRW Thank You BUSINESS PLAN PRESENTATION APRIL 2024 WWW.HOMERUNRESOURCES.COM

Homerun Resources — Investor Presentation (April 2024) on 6ix