Aris Mining Corp · TSX:ARIS

Aris Mining — Investor Presentation (November 2026)

41 slides from Aris Mining's investor presentation, Nov 12, 2026

  1. Slide 1: Building a Major Gold Producer in South America

    Building a Major Gold Producer in South America On the road to 1 million ounces a year Corporate Presentation November 2026 TSX & NYSE: ARIS TSX & NYSE: ARIS

  2. Slide 2: Disclaimer

    Disclaimer This presentation contains “forward-looking information” or “forward-looking statements” within the meaning of The forward-looking statements and forward-looking information are made as of the date hereof and Aris Mining Canadian securities legislation. All statements included herein, oth

  3. Slide 3: Overview

    OVERVIEW Long-life Assets | Financial Strength | Experienced Leadership TSX & NYSE: ARIS

  4. Slide 4: Aris Mining at a Glance

    Aris Mining at a Glance Four high-quality gold assets: targeting gold production of 1 Moz/year1 from operating mines and projects. 2 SCALE & GROWTH OPERATING DEVELOPMENT 2 Operating mines, with expansions underway Development projects 257koz 300 - 350koz MINES PROJECTS Corporate offices 2025 GOLD 20

  5. Slide 5: On the Road to One Million Ounces

    On the Road to One Million Ounces Organic growth focused strategy to create a major gold producer in South America. 1 LONG-LIFE ASSETS Targeting 1Moz/year from four assets1 2 3 FINANCIAL EXPERIENCED STRENGTH LEADERSHIP Clean capital structure. Track record of Strong liquidity and success building go

  6. Slide 6: Four Assets Advancing, Creating a Path to Moz/year

    1 Four Assets Advancing, Creating a Path to 1 Moz/year1 Long-life assets. Clearly defined milestones in 2026 and beyond. ANNUAL GOLD PRODUCTION POTENTIAL ~500 + ~500 = ~1 Moz koz/year koz/year per year Operating mines after expansions Development projects Combined longer-term potential OPERATING MIN

  7. Slide 7: 15.6 Moz of Gold Reserves Across Four Properties

    1 15.6 Moz of Gold Reserves Across Four Properties1 Significant deposits underpin our long-life operating mines and projects. FOUR ASSETS. ALL MOVING FORWARD. RESERVE SCALE BENCHMARKED TO ESTABLISHED PRODUCERS 2 operating mines | 2 advancing projects Attributable P&P gold reserves (Moz)1,2 0 5 10 15

  8. Slide 8: Financial Strength

    2 Financial Strength Increasing profitability. Significant cash flow generation. Strong liquidity, low leverage. INCREASING REVENUE, PROFITABILITY AND OPERATING CASH FLOW (US$)1 REVENUE ADJUSTED EBITDA ADJUSTED NET INCOME (LTM) (LTM) (LTM) $1.3B $702M $387M STRONG BALANCE SHEET (US$) LOW GROSS DEBT

  9. Slide 9: Financial Strength – YTD Performance

    2 Financial Strength – YTD Performance Stronger production and higher realized prices translated into record revenue, EBITDA, and earnings. Gold Ounces Sold Gold Revenue (US$M) & Adjusted EBITDA Adjusted Net Earnings Per (koz) Avg. Realized Gold Price (US$/oz) (US$M) Share1 (US$/share) $5,000 215.3

  10. Slide 10: Experienced Leadership

    3 Experienced Leadership Board of Directors Management A blend of prominent mining industry leaders and influential business figures, Our executives have years of experience working together, with demonstrated ability including three former Colombian government ministers and a leading Colombian to s

  11. Slide 11: Aris Mining and Contract Mining Partners (CMPs)

    Aris Mining and Contract Mining Partners (CMPs) A partnership model that expands gold production and creates shared value. Aris Mining Contract Mining Partners ✓ More gold production with attractive ✓ Better economics and access to financing economics ✓ Safer processing and technical training ✓ Long

  12. Slide 12: Key Investment Considerations

    Key Investment Considerations Cash generating gold producer with transformational growth. LONG-LIFE ASSETS 15.6 Moz of gold reserves1 across four properties Clear, well sequenced pathway to 1 Moz/year2 FINANCIAL STRENGTH Record YTD financial results, significant cash flow Strong balance sheet suppor

  13. Slide 13: Asset Portfolio

    ASSET PORTFOLIO TSX & NYSE: ARIS

  14. Slide 14: Toroparu Prefeasibility Results

    TOROPARU Prefeasibility Results Published November 12, 2026 TSX & NYSE: ARIS

  15. Slide 15: Toroparu Long-Life Open Pit Gold Project in Guyana

    TOROPARU Long-Life Open Pit Gold Project in Guyana PFS completed. Targeting construction decision in early 2027. MINERAL RESERVES AND RESOURCES1 PRODUCTION POTENTIAL 5.9Moz 9.3Moz 5.6Moz 258koz 29 years P&P M&I PLANNED GOLD ANNUAL AVERAGE PROCESSING GOLD RESERVES2 GOLD RESOURCES3 PRODUCTION (LOM) (Y

  16. Slide 16: Toroparu PFS Results: Mine Design, Costs & Returns

    TOROPARU PFS Results: Mine Design, Costs & Returns Conservative mine design delivering robust returns at $3,600/oz gold. MINE AND PLANT DESIGN INITIAL CAPITAL, AISC & RETURNS1 7.0Mtpa 3.3:1 $1,005M $1,494/oz $588M MILL LOM STRIP INITIAL FUNDING AISC (LOM) AVG. ANNUAL EBITDA CAPACITY RATIO REQUIREMEN

  17. Slide 17: Toroparu PFS Results: Execution Strategy

    TOROPARU PFS Results: Execution Strategy Project characteristics drive execution model. CONTRACTOR MINING STRATEGY PROJECT LOCATION ✓ Planned use of experienced third-party mining contractors ✓ PFS mining cost estimates supported by quotations from multiple international contractors ✓ Gain access to

  18. Slide 18: Segovia

    SEGOVIA TSX & NYSE: ARIS

  19. Slide 19: Segovia: One of the World's Highest-Grade Gold Mines

    SEGOVIA One of the world’s highest-grade gold mines MINERAL RESERVES & RESOURCES1 1.9Moz 3.9Moz P&P GOLD RESERVES M&I GOLD RESOURCES AT 13.3 g/t AT 19.8 g/t ANNUAL GOLD PRODUCTION 265-300koz 300koz 2026 GUIDANCE STEADY STATE SIGNIFICANT MARGINS $1,729/oz $636M OWNER MINING LTM AISC AISC YTD2 MARGIN2

  20. Slide 20: Segovia Expanding High-Grade Reserve Base

    SEGOVIA Expanding High-Grade Reserve Base Exploration continues to add to the reserve base despite 150 years of mining in the Segovia district. PROVEN & PROBABLE GOLD RESERVES (koz) 2026 RESERVE BASE 2,000 1,920 1.9 Moz Proven & Probable Gold Reserves 1,503 1,500 1,320 1,343 YEAR-OVER-YEAR RESERVE G

  21. Slide 21: Segovia Focus on U/G Infrastructure and Development

    SEGOVIA Focus on U/G Infrastructure and Development • Underground development focused on increasing mining rates and improving haulage efficiency through EL SILENCIO SANDRA K o new surface ramps at El Silencio and Providencia o a main underground haulage circuit connecting the El Silencio, Providenc

  22. Slide 22: Marmato

    MARMATO TSX & NYSE: ARIS

  23. Slide 23: Marmato Production Ramp-Up throughout 2027

    MARMATO Production Ramp-Up throughout 2027 MINERAL RESERVES & RESOURCES1 MINERALIZATION CROSS SECTION 3.2Moz 6.0Moz Narrow Vein Mining Zone Bulk Mining Zone P&P GOLD RESERVES M&I GOLD RESOURCES AT 3.2 g/t AT 3.0 g/t Fortaleza and Northern prospects ANNUAL GOLD PRODUCTION 35-50koz 200koz 2026 GUIDANC

  24. Slide 24: Marmato Transforming into a Larger-Scale Operation

    MARMATO Transforming into a Larger-Scale Operation 2026 EXECUTION PROGRESS ✓ New Bulk Mining Zone: operational Los Indios crosscut completed in April 2026. Mill feed stockpiles building ahead of first gold from the CIP plant in December 2026. ✓ Flotation plant upgraded in Q3 2026 Primary ball mill r

  25. Slide 25: Marmato Construction Update: CIP Plant

    MARMATO Construction Update: CIP Plant Watch the latest construction update video on our website. TSX & NYSE: ARIS 25

  26. Slide 26: Soto Norte

    SOTO NORTE TSX & NYSE: ARIS

  27. Slide 27: Soto Norte: One of the Most Attractive Gold Projects in the Americas

    SOTO NORTE One of the Most Attractive Gold Projects in the Americas PFS confirmed Soto Norte as a large-scale, long-life and high-grade development project. DESIGNED FOR THE DISTRICT MINERAL RESERVES & RESOURCES (Au Moz)1 • Location: Santander, Colombia (~350 km from Bogota) • Right-sized undergroun

  28. Slide 28: Soto Norte Prefeasibility Study Results

    SOTO NORTE Prefeasibility Study Results KEY METRICS1 ANNUAL PROCESSED GOLD GRADE AND GOLD PRODUCED IN CONCENTRATES1,2 350 10.29 22 years 9.62 9.82 8.74 8.92 9.05 8.75 8.44 8.17 7.64 10.0 300 MINE LIFE2 5.32 250 Gold Production (koz) (MINERAL RESERVES) 5.0 200 Au (g/t) 150 308 - $625M 294 262 268 271

  29. Slide 29: Soto Norte: A Sustainably Designed Project for Colombia

    SOTO NORTE A Sustainably Designed Project for Colombia Responsible mining practices were front and center in designing Soto Norte. COMMUNITY PROCESSING CAPACITY MINIMAL WATER USE AND SURFACE A processing plant with 20% excess capacity (750 tpd) TAILINGS STORAGE to facilitate local, small scale miner

  30. Slide 30: Well Sequenced Growth Pipeline to Moz/year

    Well Sequenced Growth Pipeline to 1 Moz/year1 Near-term Growth from Longer-term Growth from Strong Financial Operating Mines Development Projects Foundation (US$) Colombia Guyana ADJUSTED EBITDA (LTM)2 $702M SEGOVIA TOROPARU ADJUSTED NET INCOME (LTM)2 $387M Colombia Colombia CASH ON HAND3 $419M MARM

  31. Slide 31: Appendix

    Oliver Dachsel – SVP, Capital Markets Appendix odachsel@aris-mining.com Lillian Chow – Director, Investor Relations & Communications info@aris-mining.com | www.aris-mining.com lchow@aris-mining.com TSX & NYSE: ARIS

  32. Slide 32: Aris Mining's Origin

    Aris Mining’s Origin Unlocking value through scale and diversification. CALDAS SOTO NORTE EXPANSION SOTO NORTE SEGOVIA MILL TWO MAJOR NYSE TOROPARU GOLD (20%) PROJECT (51%) EXPANSION STUDIES UPLISTING PFS Acquired Aris Gold (PFS/PEA) Uplisted from PFS for Acquired an Commissioned control of acquired

  33. Slide 33: Capital Markets Profile

    Capital Markets Profile Clean capital structure. Dual listed on NYSE and TSX. Significant trading volume. Growing institutional support. MONTHLY TRADING VALUE & TOP 15 SHAREHOLDERS KEY METRICS (US$) SHARE PRICE PERFORMANCE (LTM)1,2 1 VanEck 7.3% Trading in Canada (US$M) MARKET AVERAGE DAILY Trading

  34. Slide 34: Capitalization Overview

    Capitalization Overview Current x EBITDA 1 (US$ million) (adjusted) Price Yield Coupon Maturity Rating Cash2 419 Corp: B1 / B+ / B+ Gold-Linked Secured 7.5% Notes3 16 0.02x 275 n/a 7.500% 26-Aug-27 -- Senior Unsecured 8.000% Notes3 450 0.6x 102.149 7.183% 8.000% 31-Oct-29 B1 / B+ / B+ Total debt 466

  35. Slide 35: Q3 & YTD 2026 Operating Performance

    Q3 & YTD 2026 Operating Performance Q3 2026 Q2 2026 Q1 2026 YTD 2026 Consolidated Gold produced (ounces) 69,257 73,710 74,339 217,306 Segovia Tonnes milled (t) 208,030 202,480 175,370 585,880 Average gold grade processed (g/t) 9.77 10.23 12.41 10.72 Gold produced (ounces) 63,445 64,424 66,567 194,43

  36. Slide 36: Q3 & YTD 2026 Financial Results

    Q3 & YTD 2026 Financial Results Q3 2026 Q2 2026 Q1 2026 YTD 2026 (in US$ millions, unless stated otherwise) Gold revenue 287.4 320.9 363.8 972.2 Income from mining operations 130.1 167.1 203.7 501.0 EBITDA 130.7 162.5 181.9 475.2 Adjusted EBITDA 143.9 178.6 212.1 534.5 Net earnings1 66.7 94.2 97.6 2

  37. Slide 37: Production Growth and 2026 Guidance

    Production Growth and 2026 Guidance Significant production growth ahead. Production Growth (koz Au) 2026 Guidance1 GOLD PRODUCTION ~500 CONSOLIDATED SEGOVIA MARMATO 200 300-350 koz 265-300 koz 35-50 koz 300 - 350 35 - 257 50 29 SEGOVIA COST GUIDANCE 211 23 265 - 300 CASH COST (US$/oz) AISC (US$/oz)

  38. Slide 38: Segovia Significant Margins and Cash Flow Generation

    SEGOVIA Significant Margins and Cash Flow Generation LTM AISC Margin by Quarter (US$ million) Total AISC and Realized Gold Price Trends (US$/oz) $636 AISC Margin/oz Realized Gold Price/oz $629 Combined AISC/oz Owner Mining AISC/oz $559 $4,898 $4,489 $4,237 $4,205 $421 $328 $3,494 $3,303 $250 $2,855

  39. Slide 39: Toroparu 2026 PFS vs 2025 PEA

    TOROPARU 2026 PFS vs 2025 PEA1 Attractive project economics. KEY CHANGES FROM 2025 PEA 2026 PFS 2025 PEA Change Larger Resource Base2 RESOURCE BASE2 M&I gold resources up 74% to 9.3 Moz; inferred up 115%. P&P gold reserves 5.9 Moz – New M&I gold resources 9.3 Moz 5.3 Moz +74% Inferred gold resources

  40. Slide 40: Mineral Reserves & Resources

    Mineral Reserves & Resources Property Proven Probable Proven & Probable Tonnes Gold grade Contained Tonnes (kt) Gold grade Contained Tonnes (kt) Gold grade Contained (kt) (g/t) gold (Moz) (g/t) gold (Moz) (g/t) gold (Moz) Marmato 2.2 4.31 0.3 29.1 3.08 2.9 31.2 3.16 3.2 Soto Norte 2.6 8.78 0.7 17.7

  41. Slide 41: Technical Disclosure

    Technical Disclosure Unless otherwise indicated, the scientific disclosure and technical information included in this presentation are based upon information included in the following documents and NI 43-101 compliant technical reports: 1. Technical report entitled “Technical Report for the Marmato

Aris Mining — Investor Presentation (November 2026) on 6ix