PDC Energy — Corporate Update (May 2017)
41 slides from PDC Energy's corporate update, May 2017
Slide 1: Company Update
COMPANY UPDATE May 2017
Slide 2: Forward-Looking Statements
Forward-Looking Statements This presentation contains forward-looking statements within the meaning of Section 27A of the PDC urges you to carefully review and consider the cautionary statements and disclosures, specifically Securities Act of 1933 ("Securities Act") and Section 21E of the Securities
Slide 3: PDC Energy – Strategic Overview
PDC Energy – Strategic Overview Strategic Overview Top-Tier Growth Profile 30+% 2,600 4-year Production CAGR ~ Drilling Inventory Capital Efficient Drilling (2016-2020) Technical Innovations 2020 80+% Long-Term Weighted Avg. Marketing & Midstream Corporate Outlook Portfolio IRRs Financial Discipline
Slide 4: Premier Assets Provide Top-Tier Growth
PDC Energy – Premier Assets Provide Top-Tier Growth Core Wattenberg $3.4B Market Cap(1) • 95,500 net acres • 1,800 identified locations(2) • 305 MMBoe proved reserves $4.5B Enterprise Value(1) Utica Shale Delaware Basin • 62,500 net acres 2,600 • 785 identified locations(3) • 33 MMBoe proved reserve
Slide 5: Track Record of Delivering Value
PDC Energy – Track Record of Delivering Value Oil Production (MMBbls) Operating Costs ($/Boe) LOE per BOE TG&P Production Taxes G&A 15 $25 $20 10 $15 $10 5 $5 0 $0 2014 2015 2016 2017e 2014 2015 2016 2017e 9.3 MMBoe 15.4 MMBoe 22.2 MMBoe 30-33 MMBoe 2014 2015 2016 2017e 05/08/2017 5
Slide 6: First Quarter Results
PDC Energy – First Quarter Results 73,866 2017 First Quarter Highlights • Continued Wattenberg execution drives strong production growth (Boe/d) ─ 64,285 Boe/d; 40 TILs (28 in March); 29 spuds ─ Recently updated Wattenberg MRL and XRL type curve EURs 46% ─ 83% average working interest in 1Q17 • Succ
Slide 7: 2017 Production & Capital Guidance
PDC Energy – 2017 Production & Capital Guidance Wattenberg 2017e Production Mix 2017e Production (MMBoe) • 4th rig arrived in May Anticipate Top Third of Range • ~30% annual production growth • 139 Spuds • 139 TILs with ~6,800’ avg. lateral length ~22% • 86% WI NGL ~41% Production Growth Oil Delawar
Slide 8: 2017 Capital Investment Program and Financial Guidance
PDC Energy – 2017 Capital Investment Program and Financial Guidance Capital Investment Details 2017e Capital Investments 2017e Capital Investment • Anticipate capital investment program (millions) in the top half of range • Wattenberg: ~$465 MM • Delaware: ~$290 MM − Includes $35 MM midstream, $30MM
Slide 9: Balance Sheet Strength and Liquidity
PDC Energy – Balance Sheet Strength and Liquidity As of March 31, 2017 Leverage and Liquidity $1,000 • $946 million liquidity Debt Maturity Schedule (millions) • $258 million combined cash balance & short-term investments $750 • Leverage ratio(1) of 2.0x $500 Debt Maturities • $700 million credit fa
Slide 10: Asset Overview
ASSET OVERVIEW '(\) ENERGY
Slide 11: Core Wattenberg – Asset Overview
Core Wattenberg – Asset Overview 2016 Strategic Acreage Trade Located in Kersey Area (2) 2017e TIL Breakdown Net Acres Outer Core Kersey XRL Middle Core Area SRL 36% 35% Inner Core ~ Acreage HBP MRL 29% Horizontal Locations(1) 305 139 139 6,800’ YE16 Proved Reserves (MMBoe) 2017e Spuds 2017e TILs Av
Slide 12: Core Wattenberg – Kersey Area Performance Tracking Updated Type Curves
Core Wattenberg – Kersey Area Performance Tracking Updated Type Curves Type Well Profile Comparison(1) LDS Project (MRL) AD2016 SRL Type Curve AD2017 MRL Type Curve Pad Average (Older Style Completion) 490 MBoePre-Trade SRL Type Curve Post-Trade Pad Average 800 MBoe MRL Type Curve 1,100 MBoe XRL Typ
Slide 13: Core Wattenberg – Continued Type Curve Improvements
Core Wattenberg – Continued Type Curve Improvements • Type curve EUR increases reflect new completion design and flowback techniques • XRL – 30% increase to 1,100 MBoe (from 850 MBoe) • MRL – 15% increase to 800 MBoe (from 685 MBoe) EUR Progression 1,100 • SRL – Remains at 490 MBoe (MBoe per well) ─
Slide 14: Core Wattenberg – Growing Oil Volumes
Core Wattenberg – Growing Oil Volumes Based on Previous Analyst Day Type Curves • Oil volumes per well continue to grow Oil Volume per Well(1) 350 • GOR typically stabilizes after 18-36 months (MBbls) 305 • MRL and XRL wells represent recent completion design improvements ─ SRL 490 MBoe EUR still ba
Slide 15: Core Wattenberg – Base Case Economic Summary
Core Wattenberg – Base Case Economic Summary SRL Performance MRL Performance XRL Performance 490 MBoe SRL Type Curve 800 MBoe MRL Type Curve 1,100 MBoe XRL Type Curve Older PDC Operated Wells Updated Completion & Flowback Type Well CWC EUR F&D Cost(1) IRR(2) PV10(2) ROI SRL MM $2.5 Gross MBoe 490 Pe
Slide 16: Core Wattenberg – Midstream Overview
Core Wattenberg – Midstream Overview Additional Capacity Enables Future Growth Objectives NATURAL GAS • Multiple midstream providers (DCP and Aka-APC) ─ DCP expected to gather and process ~72% of 2017e gas volumes • DCP current capacity ~850 MMcf/d Grand Pkwy OIL Plant 11 • Ample takeaway capacity p
Slide 17: Delaware Basin – Asset Overview
Delaware Basin – Asset Overview Western Central 2017e Spuds Net Acres 6% Eastern 23% Average Working Interest 71% Eastern Central Western Horizontal Locations(1) 31 23 30% 3,000+ 2017e Spuds 2017e TILs YE16 HBP Potential Hz Locations(2) (1) YE16 – Reflects 5,000’ laterals in Eastern and Central area
Slide 18: Delaware Basin – Area Details
Delaware Basin – Area Details Commodity Mixes Represent Mid-Point of Ranges Infrastructure Assets (as of 1/1/17) 10 fresh water pits 5 salt-water-disposal wells ~60 miles of gas gathering lines ~35 miles of water gathering lines Oil Gas NGL (1) Locations are ~10,000’ laterals 18 05/08/2017
Slide 19: Delaware Basin – 2017 Planned Activity
Delaware Basin – 2017 Planned Activity Western Central PDC/Fortuna – HSS State Budgeted Well Costs (millions) • $225 million D&C budget Wolfcamp A (DUC) ~7,500’ laterals Lateral Length 2/28/17 PDC – Phillips State ─ Spud 31 wells Wolfcamp A 1 mile (SRL) $7.1 ~7,500’ lateral PDC/Arris – Greenwich ─ 2
Slide 20: Delaware Basin – Encouraging Recent Well Results
Delaware Basin – Encouraging Recent Well Results Eastern Area – Wolfcamp A Central Area – Wolfcamp A/B • Early production from recent completions performing • Multiple wells currently on flowback (yet to reach above acquisition type curve peak production) ─ 3 wells trending ~25% above acquisition ty
Slide 21: Marketing & Midstream – Gas Throughput and Processing Overview
Marketing & Midstream – Gas Throughput and Processing Overview Gas delivered to both El Paso and Waha markets Added 40 MMBtu/d firm transportation basin to Waha through 2020 3rd Party Midstream Western Central Central Delivery Points Eagle Claw PDC Gas Gathering • Current capacity of ~320 MMcf/d ETC
Slide 22: Long-Term Delaware Midstream Vision – Roadmap to Incremental Value Creation
Long-Term Delaware Midstream Vision – Roadmap to Incremental Value Creation 2017 – 2019 Key Objectives Create separate fee structures for in-field midstream services Build out PDC midstream assets & infrastructure to support development plans – 100% PDC owned Ensure competitive & reliable marketing
Slide 23: Long-Term Delaware Midstream Vision – Value Creation Strategies
Long-Term Delaware Midstream Vision – Roadmap to Incremental Value Creation Long-Term Key Objectives Continue in-field midstream build out for PDC and potential 3rd party volumes Continue to understand ultimate resource potential and future volume projections Evaluate options to operate and/or parti
Slide 24: PDC Energy – 2020 Vision
PDC Energy – 2020 Vision Strategic Overview Top-Tier Growth Profile 30+% 2,600 4-year Production CAGR ~ Drilling Inventory Capital Efficient Drilling (2016-2020) Technical Innovations 2020 80+% Long-Term Weighted Avg. Marketing & Midstream Corporate Outlook Portfolio IRRs Financial Discipline ~1.0x
Slide 25: Investor Relations
Investor Relations Mike Edwards, Senior Director Investor Relations michael.edwards@pdce.com Kyle Sourk, Manager Investor Relations kyle.sourk@pdce.com Corporate Headquarters PDC Energy, Inc. 1775 Sherman Street Suite 3000 Denver, Colorado 80203 303-860-5800 Website www.pdce.com
Slide 26: Appendix
APPENDIX /\ ENERGY
Slide 27: PDC Energy – 2020 Vision Base Case
PDC Energy – 2020 Vision Base Case 8/24/16 Pro Forma Corporate Outlook Range 4/20/17 Corporate Outlook Range Production (MMBOE) ~200 75 Adj. Cash Flow (MM) $1,800 $1,500 MBoe/d Exit Rate in 2020 50 $1,200 $900 $1.5B+ 25 YE Rig Count (Watt./Del.) $600 $300 2020 Cash Flow 0 4/3 5/5 5/6 5/7 $0 2017e 20
Slide 28: 2020 Vision – Key Outlook Factors
2020 Vision – Key Outlook Factors Key Considerations Utilizes Delaware Basin acquisition type curves Potential for Wattenberg SRL type curve improvement from completion enhancements Variability of timing on first production Production range includes estimate of potential midstream constraints in Wat
Slide 29: PDC Energy – 2020 Vision Resilient Case
PDC Energy – 2020 Vision Resilient Case 4/20/17 Resilient Case Range 21% 75 Production (MMBOE) $1,800 $1,500 Adj. Cash Flow (MM) 4-Year Production CAGR 50 $1,200 90% 25 YE Rig Count (Watt./Del.) $900 $600 2020 Liquidity Available $300 ($700MM borrowing base) 4/3 3/3 3/3 3/3 0 $0 2017 2018 2019 2020
Slide 30: Wattenberg Kersey Area – XRL Type Curve
Wattenberg Kersey Area – XRL Type Curve Increasing 30% to 1,100 MBoe Increased Type Curve from 850 MBoe • Approximately 210 currently identified Middle Core (1) locations Base Case Type Well Details ─ Increased inventory driven by 2016 acreage trade 3-Phase EUR: 1,100 MBoe Capital Cost: $4.5MM • Dri
Slide 31: Wattenberg Kersey Area – MRL Type Curve
Wattenberg Kersey Area – MRL Type Curve Increasing 15% to 800 MBoe Increased Type Curve from 685 MBoe • Recently completed wells are outperforming type curve (1) Base Case Type Well Details • Over 380 currently identified Middle Core locations ─ Increased inventory driven by 2016 acreage trade 3-Pha
Slide 32: Wattenberg Kersey Area – SRL Type Curve
Wattenberg Kersey Area – SRL Type Curve of 490 MBoe Type Curve Remains 490 MBoe • Most recent SRL wells completed in 1H16 using (1) historical completion design and flowback techniques Base Case Type Well Details • Potential upside due to new completion design being 3-Phase EUR: 490 MBoe Capital Cos
Slide 33: Reserves – Continued Core Wattenberg Consistency
Reserves – Continued Core Wattenberg Consistency 2,700 Inner Core Represents ~1,900 Middle Core Hz Niobrara wells Outer Core CO DJ Niobrara Represents ~800 Outside Core Hz Niobrara wells ~Wells Included in Study 2.7 Average EUR Variability Ratio for Core Wattenberg 4,200’Normalized Lateral Length No
Slide 34: Delaware Basin Inventory Detail
PDC Energy – Delaware Basin Inventory Detail Acquisition Model Assumes Maximum Density of Only 12 Wells per Section Well Spacing & Inventory Summary Max ACQ Peer Eastern Inventory Central Inventory Western Inventory Bench Spacing Tests (17,600 net acres) (28,900 net acres) (16,000 net acres) Wells/S
Slide 35: Delaware Basin – Long-Term Vision For Driving Value
Delaware Basin – Long-Term Vision For Driving Value Delineation Phase Development Phase 2017 2018 2019 2020 & Beyond HBP program Single well tests Pad development Completion design optimization Pilot holes & additional zone testing Integrated facilities Initial infrastructure investments Delineation
Slide 36: Eastern Area – Wolfcamp A Outperformance Provides Upside
Eastern Area – Wolfcamp A Outperformance Provides Upside • Early production from recent completions performing (1) above acquisition type curve Base Case Development Type Well Details ─ 3 wells trending ~25% above acquisition type curve ─ 11 Wolfcamp A spuds planned in 2017 3-Phase EUR: 1,000 MBoe C
Slide 37: Eastern Area – Wolfcamp B Delivers Strong Early Results
Eastern Area – Wolfcamp B Delivers Strong Early Results • First Wolfcamp B test in Eastern area trending above (1) acquisition type curve of 750 MBoe Base Case Development Type Well Details ─ PDC’s Triangle well currently outperforming acquisition type curve by ~25% 3-Phase EUR: 750 MBoe Capital Cos
Slide 38: Central Area – Encouraging Initial Results
Central Area – Encouraging Initial Results • Multiple wells currently on flowback (yet to reach (1) peak production) Base Case Development Type Well Details ─ Liam State – XRL Wolfcamp B 3-Phase EUR: 1,050 MBoe Capital Cost: $6.0MM ─ HSS State – MRL Wolfcamp A (Fortuna DUC) % Oil: 40% IRR: 34% • Inv
Slide 39: Western Area – Acquisition Economic Summary
Western Area – Acquisition Economic Summary • Drill and complete two Wolfcamp A wells by 2Q17 (1) ─ Using 2017 completion design Base Case Development Type Well Details ─ Will hold entire block through 2018 3-Phase EUR: 1,200 MBoe Capital Cost: $9.0MM • Consolidated acreage block conducive to longer
Slide 40: Reconciliation of Non-U.S. GAAP Financial Measures
Reconciliation of Non-U.S. GAAP Financial Measures Three Months Ended Net income (loss) to adjusted EBITDAX March 31, 2017 2016 Net income (loss) $ 46.1 $ (71.5) Gain on commodity derivative instruments (80.7) (11.1) Net settlements on commodity derivative instruments 0.5 66.8 Non-cash stock-based c
Slide 41: Reconciliation of Non-U.S. GAAP Financial Measures
Reconciliation of Non-U.S. GAAP Financial Measures Three Months Ended Net income (loss) to adjusted net income (loss) March 31, 2017 2016 Net income (loss) $ 46.1 $ (71.5) Gain on commodity derivative instruments (80.7) (11.1) Net settlements on commodity derivative instruments 0.5 66.8 Tax effect o