Sosandar PLC · LSE:SOS

Sosandar — Orogen Gold — UK Investor Show 2016

14 slides from Sosandar's conference presentation, Apr 30, 2016

  1. Slide 1: Orogen Gold plc – Exploring for Gold

    Orogen Gold plc AIM:ORE Exploring for Gold Developing opportunity driven strategy UK Investor Show 30 April 2016 1

  2. Slide 2: Disclaimer

    DISCLAIMER This document is issued by Orogen Gold plc (the “Company”), has been prepared solely for information purposes and is the sole responsibility of the directors of the Company. To the best of the knowledge and belief of the directors of the Company, who have taken all reasonable care to ensu

  3. Slide 3: Orogen Gold Plc - Board

    Orogen Gold Plc - Board Experienced Board and specialist management team with a track record of discovering and enhancing value of mineral assets Colin Bird, Chief Executive • Chartered mining engineer with extensive multi-commodity mine management experience • Founder of Kiwara plc which discovered

  4. Slide 4: Exploring for Gold – Developing opportunity driven strategy

    Orogen Gold Plc (AIM:ORE) Exploring for Gold – Developing opportunity driven strategy  Company believes that gold will retain and most likely increase in value over the coming years.  Strategy to identify and secure access to low entry cost gold projects with strong upside potential  Focused on p

  5. Slide 5: Project overview

    Orogen Gold Plc (AIM:ORE) Project overview Mutsk Project, Armenia  Orogen focus on near-surface epithermal gold discovery close to 5Moz Amulsar mine (under development)  2.4km strike with high gold grades along steep structure feeding to wider zones of lower grade  2015 drill programme extends ta

  6. Slide 6: Mutsk Project – Geology and Targets

    Mutsk Project – Geology and Targets  Near-surface epithermal gold discovery just 30km from 5Moz Amulsar deposit where construction is planned for Spring 2016  Zones of gold mineralisation within large (>2.4km long) hydrothermal system - only a limited portion explored to date  Broad, low-grade go

  7. Slide 7: Mutsk Drill plan & selected assay intervals

    Mutsk Drill plan & selected assay intervals Mutsk diamond drilling - significant gold assay intervals* Hole No. Hole direction From (m) To (m) Interval (m) Au g/t OG13-01 Vertical 37.00 48.00 11.00 5.56 OG14-25 -50 degrees to E 108.00 132.00 24.00 1.25 OG14-27 -50 degrees to E 12.00 72.00 60.00 1.21

  8. Slide 8: Mutsk – Drill Cross-section

    8 Mutsk – Drill Cross-section

  9. Slide 9: Operating in Armenia

    Operating in Armenia  Good infrastructure – extensive road network and plentiful hydropower  Tarred road from capital Yerevan to 15km from Mutsk; road to project area open all year round  Snow cover typically from late November through to early April  Mining-friendly country – industry already w

  10. Slide 10: Silverton gold-silver project, Nevada

    Silverton gold-silver project, Nevada  Orogen earning initial 51% interest for US$400,000 exploration spend  Targeting high grade structurally-hosted gold-silver veins and/or large, low grade, open-pittable deposit.  Geologic environment analogous to 10Moz Round Mountain gold mine 10

  11. Slide 11: Silverton - Potential

    Silverton - Potential  Bedrock sampling yields values >0.5g/t Au over 1km x 0.5km zone within 6km2 mineralised area  Past RC drilling returned gold intervals up to 7.62m@ 2.29g/t & 10.67m @ 1.0g/t, incl. 1.52m @ 5.01g/t  Historic underground silver/gold mine on Silverton Shear  High grade vein t

  12. Slide 12: Operating in Nevada

    Operating in Nevada  One of the world’s best gold-endowed regions – 73% of US gold production  Stable, mining friendly jurisdiction, with a well-established regulatory system  Reasonable time frame from discovery to production  Several of the world’s top gold miners currently operating in Nevada

  13. Slide 13: Corporate Details

    Orogen Gold Corporate Details  Shares in issue • 5,507.7 million  Main shareholdings • Directors 617.7 million (11.21%)  Options in issue • 180 million exercisable at 0.035p • 160 million exercisable at 0.60p • 40 million exercisable at 0.95p  Share price and market cap (at mid April 2016) • 0.0

  14. Slide 14: Orogen Gold - Contacts

    Orogen Gold - Contacts Contacts E-mail/web Orogen Gold Plc +353 1 6628395 www.orogengold.com 14

Orogen Gold — UK Investor Show 2016 on 6ix