Nexmetals Mining Corp. · TSXV:NEXM

Nexmetals Mining — Investor Presentation (March 2026)

23 slides from Nexmetals Mining's investor presentation, March 2026

  1. Slide 1: Developing Future Supply of Critical Metals

    Developing Future Supply of Critical Metals MARCH 2026 | INVESTOR PRESENTATION

  2. Slide 2: Cautionary Note Regarding Forward-Looking Statements

    CAUTIONARY NOTE REGARDING FORWARD-LOOKING STATEMENTS This presentation (the “Presentation”) is to be used by the recipient for informational purposes only and does not purport to be complete or contain all of the information that may be material to the current or future business, operations, financi

  3. Slide 3: Important Cautionary and Other Information

    IMPORTANT CAUTIONARY AND OTHER INFORMATION Caution Regarding Historic Data Certain scientific and technical information in this Presentation, including historic data compilation at the Selebi and Selkirk projects, are historic in nature. Reference should be made to the full text of the Selebi Techni

  4. Slide 4: Click on image to view site overview video

    Click on image to view site overview video

  5. Slide 5: Safe, Scalable, And In Mining Friendly Botswana

    DISTRICT SCALE CRITICAL METALS CAMP: Safe, Scalable, And In Mining Friendly Botswana PAST-PRODUCING & PERMITTED Cu-Ni-Co-PGE MINES Selebi and Selkirk Mines - proven assets ready to deliver. EACH DEPOSIT OPEN AT DEPTH Strong potential for underground expansion and long-life, scalable production. BOTS

  6. Slide 6: Selebi Mines

    SELEBI MINES SELEBI NORTH SHAFT 4 (733 METRE LEVEL) 6

  7. Slide 7: Established Resource with Expansion Potential

    SELEBI MINES Established Resource with Expansion Potential OPERATIONAL ADVANTAGES EXPLORATION GROWTH POTENTIAL • Mining license and surface rights, with title ownership established • Multiple untested borehole electromagnetic (BHEM) conductors and infill drilling support significant growth • Existin

  8. Slide 8: 2025 HINGE Program Confirms Scale and Expansion Potential

    SELEBI MAIN 2025 HINGE Program Confirms Scale and Expansion Potential GEOLOGICAL MODEL STRENGTHENED BY DRILLING AND BHEM Drilling and down-hole geophysics support resource continuity and expansion potential down-plunge and down-dip of current resource boundaries. Mineralized intercepts aligning with

  9. Slide 9: 2026 Resource Growth Drilling Program

    SELEBI MAIN 2026 Resource Growth Drilling Program PROGRAM FOCUS: DATA-DRIVEN RESOURCE GROWTH • Selebi Main Additional Resource Tonnes (SMART) drill program builds on encouraging 2025 drilling and BHEM results, targeting priority growth areas at Selebi Main • Planned program of ~30,000 metres • Drill

  10. Slide 10: 2025 Drilling Confirms Upside Potential

    SELEBI NORTH 2025 Drilling Confirms Upside Potential RESOURCE CONTINUITY AND GROWTH POTENTIAL VALIDATED Underground drilling since publishing the 2024 NI 43-101 MRE was focused on resource definition and resource expansion. The goal for the 2025 drill program was to enhance the understanding of mine

  11. Slide 11: Selebi Mines Metallurgical Breakthrough

    Selebi Mines Metallurgical Breakthrough UNLOCKING ABILITY TO PRODUCE SEPARATE HIGH-GRADE SALEABLE COPPER & NICKEL-COBALT CONCENTRATES: KEY POINTS: BULK SAMPLES – REAL WORLD TEST MATERIAL • Largest underground bulk sample from Selebi Mines with representative material selected for STRATEGIC ADVANTAGE

  12. Slide 12: Selkirk Mine

    Selkirk Mine Unlocking Polymetallic Value Through Shallow, Scalable Development NexMetals NI 43-101 Technical Report Selkirk Nickel Project dated, Effective date: November 1, 2024

  13. Slide 13: Open-Pit Potential with Significant PGE Exposure

    SELKIRK Open-Pit Potential with Significant PGE Exposure RESOURCE AND DEVELOPMENT POTENTIAL • Mining license covers approximately 14.6 square kilometers, and the four prospecting licenses cover 126.7 square kilometers • Tati Nickel Mining Company mined high grade Cu-Ni massive sulphides to produce 1

  14. Slide 14: 2026 Catalysts: Innovative Value Growth Model

    2026 CATALYSTS: Innovative Value Growth Model RESOURCE EXPANSION DATA DRIVEN RESULTS ONGOING STUDIES Targeted drilling programs advancing BHEM-guided targeting and continuous Metallurgy, modelling, and technical resource growth at Selebi and Selkirk. assay flow supporting efficient studies progressi

  15. Slide 15: Capital Structure

    Capital Structure (as at February 27, 2026) 35,512,606 Issued & Outstanding 880,754 9,428,996 Options Warrants 658,892 14,035,100 17.6% 9.9% Restricted Share Units Tradeable Warrants ($8.00) 90,887 657 Deferred Share Units Preferred Shares Stefan Ioannou Brandon Gaspar sioannou@cormark.com bgaspar@s

  16. Slide 16: Management

    EXPERIENCED, DISCOVERY FOCUSED Management Sean Whiteford CEO & Director • 30+ years in global mining, with multi-commodity expertise across exploration, mining, and project studies. • Held senior roles at BHP, Rio Tinto, and Cliffs, and led business development at Burgundy Diamond Mines (ASX: BDM).

  17. Slide 17: Board of Directors

    TRUSTED, EXPLORATION-DRIVEN Board of Directors Paul Martin Sean Whiteford Chris Leavy CEO & DIRECTOR 20 years of asset management and CHAIRMAN investment leadership, including 30+ years of global mining expertise CIO roles at Oppenheimer Funds Over 30 years of executive leadership and BlackRock. acr

  18. Slide 18: A Proven Mining Powerhouse

    BOTSWANA Resource Potential & A Proven Mining Powerhouse Geological Prospectivity BOTSWANA: A TIER-ONE MINING JURISDICTION Mining-Friendly Policies Long history of rule-of-law, competitive tax rates, no foreign exchange restrictions, and no & Regulations required government free carry. Consistently

  19. Slide 19: The Next Major Critical Metals Player?

    The Next Major Critical Metals Player? PERMITTED & PROVEN: EXPLORATION UPSIDE: TIER-ONE JURISDICTION: BUILT-IN ADVANTAGE: Past-producing Cu-Ni-Co-PGE Untested EM plates along 2 km Botswana – safe, stable, mining- Two shafts, grid power, water, rail Mines corridor between and below Selebi friendly. E

  20. Slide 20: ESG Commitment & Impact

    ESG Commitment & We are committed to a sustainable future, aligning with ESG principles to drive Impact economic prosperity, protect the environment, and enrich our communities. Advancing responsible mining, promoting innovation, and ensuring a brighter future for Botswana and its people. Economic P

  21. Slide 21: Contact Us

    Contact Us Sean Whiteford Phone +1 833-770-4334 Chief Executive Officer Email swhiteford@nexmetalsmining.com TSX-V : NEXM | NAS DAQ: NEXM 21

  22. Slide 22: Initial NI 43-101 Mineral Resource Estimate on the Selebi Mine

    EFFECTIVE DATE: JUNE 30, 2024 Initial NI 43-101 Mineral Resource Estimate On The Selebi Mine Classification Tonnage Grade Contained Metal Deposit Mt % Cu % Ni kt Cu kt Ni Selebi North 3.0 0.90 0.98 27 29 Indicated Total 3.0 0.90 0.98 27 29 Selebi Main 18.9 1.69 0.88 319 165 Inferred Selebi North 5.8

  23. Slide 23: Initial NI 43-101 Mineral Resource Estimate on the Selkirk Mine

    EFFECTIVE DATE: NOVEMBER 1, 2024 Initial NI 43-101 Mineral Resource Estimate On The Selkirk Mine Grade Contained Metal Classification Tonnage (Mt) Cu % Ni % Pd g/t Pt g/t CuEq* % Cu kt Ni kt Pd koz Pt koz Inferred 44.2 0.30 0.24 0.55 0.12 0.81 132 108 775 174 *CuEq% calculated using the formula Cu%

NexMetals Mining — Investor Presentation (March 2026) on 6ix