Alligator Energy Ltd · ASX:AGE
Alligator Energy — NWR Melbourne (May 2024)
16 slides from Alligator Energy's conference presentation, May 2024

Slide 1: Advancing Samphire Uranium into Trial Production
ASX:AGE NWR Melbourne - Advancing Samphire Uranium into Trial Production May 2024

Slide 2: Disclaimer
Disclaimer Forward Looking Statements This presentation contains projections and forward-looking information that involve various risks and uncertainties regarding future events. Such forward-looking information can include without limitation statements based on current expectations involving a numb

Slide 3: Company Snapshot
Company Snapshot Capital Structure (as at 7 May 2024) Share Price $0.066 Ordinary Shares 3,862.3 M Perf Shares, Listed & Unlisted Options 464.4 M Cash as at 31 March 2024 $ 32.7 M Market Cap $255 M Top 50 Shareholders Brokers & Banks 22% Retail 45% Directors & Executives 5% Institutions 28% 3 Alliga

Slide 4: Fundamentals point to stronger spot and term prices
Fundamentals point to stronger spot and term prices Spot uranium in a multi-year bull market Source: Trading Economics Prices • Spot price doubled in ~12 months from US$50 / lb to recent peak of US$106 / lb. • Long term price now estimated at – US$80 / lb (Trade Tech) – US$75 / lb (UxC) 4 Alligator

Slide 5: Samphire Uranium Project, South Australia
Samphire Uranium Project, South Australia 5 Alligator Corporate Presentation | May 2024 | ASX:AGE

Slide 6: Samphire Highlights
Samphire Highlights 20kms from JORC compliant Regional exploration Whyalla, SA resource opportunities Excellent regional 17.5 Mlbs uranium resource Exploration Target infrastructure and with significant scope for estimates additional skilled labour-force further growth 14 - 75 Mlbs Robust Scoping St

Slide 7: Samphire Uranium project: A highly competitive ISR project
Samphire Uranium project: A highly competitive ISR project • Initial capital cost estimate of US$131 million is low, despite significant contingencies and inflation totalling 35%. • AISC at the lower end of cost curve, due to: In-situ Recovery (ISR) amenable, nature of the deposit, shallow depth

Slide 8: Samphire Uranium Project – Dec 2023 Scoping Study: Key Metrics
Samphire Uranium Project – Dec 2023 Scoping Study† : Key Metrics Study metrics* at US$75 / lb uranium price A$131m 2.45 years 42% A$257m US$33.31/lb US$16.06/lb CAPEX Payback IRR* NPV8* AISC Cash Costs (including contingency) (post-tax, real, (post-tax, real, (A$47.58/lb) (A$22.94 /lb) ungeared) ung

Slide 9: Samphire Uranium Project – Blackbush JORC Resource
Samphire Uranium Project – Blackbush JORC Resource JORC Grade U3O8 Metal U3O8 Metal Mt Category (U3O8 ppm) (KTonnes) (Mlbs) Indicated 7.8 754 5.9 12.9 Inferred 4.6 447 2.1 4.6 Total 12.4 640 7.9 17.5 Ref: ASX Release 7 December 2023 9 Alligator Corporate Presentation | May 2024 | ASX:AGE

Slide 10: Further Extensions outside the Exploration Target Range Envelope
Further Extensions outside the Exploration Target Range Envelope Recent Ground Gravity Survey- April 2024 • Data shows outstanding continuity of the Samphire palaeochannel system by 34 lineal km’s. • 50% increase to the existing 64km of palaeochannel strike length. • Historical drillholes confirm th

Slide 11: Samphire Uranium Project – Field Recovery Trial (FRT)
Samphire Uranium Project – Field Recovery Trial (FRT) • Field Recovery Trial (FRT) construction targeted for Q3, pending regulatory approvals. • In operation for 3-4 months and consists of three producing well patterns and a containerised pilot plant. • FRT is designed to confirm key parameters and

Slide 12: Samphire Uranium Project – Field Recovery Trial Plant
Samphire Uranium Project – Field Recovery Trial Plant • Fabrication of the containerised FRT processing Pilot plant layout plant in Adelaide essentially complete and undergoing Factory Acceptance Testing. • Post completion the plant will be transported to Whyalla ahead of securing the necessary appr

Slide 13: Exploration projects
Exploration projects NT, AUSTRALIA Alligator Rivers ITALY (ARUP) High Grade U Piedmont NW Ni-Co-Cu-Au-PGEs SA, AUSTRALIA Big Lake (Cooper Basin) ISR style U 13 Alligator Corporate Presentation | May 2024 | ASX:AGE

Slide 14: Investment into EnviroCopper Ltd ISR copper, SA
Investment into EnviroCopper Ltd ISR copper, SA • Alligator expanded energy minerals interests with $0.9M strategic investment in private group, Envirocopper (ECL), with option up to 50.1%. • This investment and resultant collaboration is extremely complimentary to our existing and substantial in-ho

Slide 15: 2024 News Flow
2024 News Flow Recent releases 2nd Quarter 3rd Quarter 4th Quarter 2025 • First round extension • Inaugural Big Lake • Commence FRT • Commencement of • Award and commence drilling at Blackbush (BLU) Drilling Program construction (subject field circulation trial Feasibility Study (Samphire) • Samphir

Slide 16: Greg Hall CEO
ASX:AGE Greg Hall CEO +61 (0) 7 3839 3904 gh@alligatorenergy.com.au www.alligatorenergy.com.au
Source: Internet Archive copy of alligatorenergy.com.au
More decks from Alligator Energy Ltd
Shareholder Meeting (November 2026)17 slides · November 2026
IMARC - Sydney 202618 slides · Oct 29, 2026
Investor Presentation (August 2026)25 slides · Aug 6, 2026
Investor Presentation (May 2026)14 slides · May 7, 2026
RIU Fremantle (February 2026)15 slides · Feb 17, 2026
Shareholder Meeting (November 2025)15 slides · Nov 21, 2025