Stillwater Mining — Merger or Acquisition (February 2017)
51 slides from Stillwater Mining's merger presentation, Feb 15, 2017
Slide 1: Disclaimer: Additional Information and Where to Find It
Disclaimer Additional Information and Where to Find It This presentation does not constitute the solicitation of any vote, proxy or approval. In connection with the proposed transaction, Sibanye Gold (“Sibanye”) intends to post to its shareholders a JSE Limited (“JSE”) Category 1 circular subject to
Slide 2: Overview and strategic recap
Overview and strategic recap
Slide 3: Corporate overview
Corporate overview Share information as at 9 February 2017 * Source: J.P.Morgan Cazenove, January 2017 Shareholder geographic distribution* China South Africa USA Luxembourg United Kingdom Europe excl UK Others 28% 36% 4% 6% 5% 2% * Source: J.P.Morgan Cazenove, January 2017 A FTSE/JSE Top 40 and glo
Slide 4: Location of current operations
Location of current operations ZIMBABWE Mimosa Rustenburg operations Platinum Mile Kroondal South Rand project (Burnstone) West Wits operations and projects: • Cooke • Driefontein • Kloof • WRTRP Free State operations and projects • Beatrix • Beisa project • Bloemhoek project • De Bron Merriespruit
Slide 5: Global gold and PGM rankings
Global gold and PGM rankings 2015A 4E Production1,4 (Moz) 2015 Production (Moz) Barrick 6.1 Newmont AngloGold Gold Corp Kinross Newcrest Gold Fields Agnico-Eagle Source: Bloomberg, Companies’ disclosures, Broker reports Notes: 1. 2. 3. 4. 5. Platinum, palladium, rhodium and gold (together referred t
Slide 6: Our core purpose
Our core purpose SIBANYE’S MINING IMPROVESLIVES SIBANYE’S MINING IMPROVES LIVES
Slide 7: Our vision
Our vision SUPERIOR VALUE CREATION FOR ALL OUR STAKEHOLDERS T h r o u g h m i n i n g o u r m u l t i - c o m m o d i t y r e s o u r c e s i n a s a f e a n d h e a l t h y e n v i r o n m e n t Sibanye cares 5
Slide 8: Value creation focus
Value creation focus Continue to drive operational excellence on existing asset base – A proven operating model – Robust cash flow – Strong balance sheet Investing in organic growth projects in the Gold Division Growth through value accretive transactions – PGM sector a logical step – – – Aquarius a
Slide 9: Gold Division operational track record
Gold Division operational track record 2 500 1750 1500 2 000 1250 1 500 1000 1 000 750 500 500 Gold Fields Sibanye Historical Forecast Production (koz) Gold Price ($/oz) AISC 50 40 28.4 30 20 10 0 Gold Fields Sibanye Turnaround effected and maintained 10 US$/oz Reserves (Moz) Annual gold production
Slide 10: Gold division - Life of mine production profile
Gold division - Life of mine production profile 60 000 50 000 40 000 30 000 20 000 10 000 0 Note: Project profile is based on pre-feasibility and feasibility studies as at December 2015 Based on Reserves declared as at 31 December 2015 Assumptions: Gold price: R430,000/kg, Uranium R1,455/lb (real 20
Slide 11: Expanding PGM platform at attractive point in cycle
Expanding PGM platform at attractive point in cycle Rustenburg transaction: structured to minimise risk – – – Relatively low capital outlay upfront (R1.5bn upfront payment) Downside protection until 2019 Future payments ring-fenced to assets – upside and downside risk sharing Aquarius transaction at
Slide 12: Operating and cost synergies targeted
Operating and cost synergies targeted Turk # (undeveloped) School of Mines Aquarius Rustenburg Operations Care and maintenance Forecast R800m synergies per annum Driving value creation through realisation of regional and operating synergies 13 Shared services and central cost savings •Bathopele/Kroo
Slide 13: What differentiates Sibanye
What differentiates Sibanye Significant free cash generation – underpins dividend commitment Delivery of superior, sustainable returns to shareholders Primary South Africa focused – understand the operating environment A track record of environmentally responsible, sustainable, operational delivery
Slide 14: Industry leading relative dividend yield
Industry leading relative dividend yield Current dividend yield (last twelve months (LTM) dividends paid) 5.9% 5.3% 1.5% 1.5% 0.9% 0.8% 0.8% 0.8% 0.6% 0.4% 0.5% 0.4% Source: Factset and company filings. Market data as of 30 January 2017 Note: 1. Dividend yield calculated using actual dividend paid a
Slide 15: Stillwater transaction overview
Stillwatertransaction overview
Slide 16: Our PGM view is positive over the long-term
Our PGM view is positive over the long-term Platinum: net market balance (koz) vs. price¹ Despite recent conservative outlooks, we believe the PGM market fundamentals remain robust 1 500 1 000 500 0 -500 -1 000 -1 500 -2 000 -2 500 -3 000 2 000 SA supply expected to regress from 2020E onwards 1 500
Slide 17: Transaction summary
Transaction summary issue Source: Factset as of 8 December 2016 Note: 1. US anti-trust condition with respect to HSR Act clearance has been satisfied as announced on 19 January 2017. South African Reserve Bank (“SARB”) and Committee on Foreign Investment in the United States (“CFIUS”) filings have b
Slide 18: Expected transaction timeline
Expected transaction timeline Transaction timeline 9 December 2016: Transaction announcement Conditions precedent satisfied, or waived, including regulatory approvals Proxy / circular dispatched to Sibanye and Stillwater shareholders Sibanye and Stillwater shareholder meetings held to approve transa
Slide 19: Transaction timeline
Transaction timeline 9 December 2016: Transaction announcement Conditions precedent satisfied, or waived, including regulatory approvals Proxy / circular dispatched fo Sibanye and stilwater shareholders sibanye and Stillwater shareholder meetings held to approve transaction! Transaction closing Righ
Slide 20: Portfolio of low cost assets with growth potential
Portfolio of low cost assets with growth potential Stillwater Mine (Montana, USA) East Boulder Mine (Montana, USA) 2016 2E PGM production: 330 koz1 2016 2E PGM production: 210 koz1 – – – 9m 2016 PGM cash cost2: $428/oz3 – 9m 2016 PGM cash cost2: $441/oz3 – 2E PGM reserves: 8.8 moz @19.7 g/t – 2E PGM
Slide 21: Significant untapped resources along strike of orebody
Significant untapped resources along strike of orebody Geographic location Complex, Billings Recycling Facilities 89 Boulder Absarokee 310 Source: Company filings Significant expansion opportunity with 45km orebody strike 17 191 Yellowstone 87 Laurel Sweet Grass Big Timber 89 Metallurgical 90 Living
Slide 22: Creating a mine-to-market business
Creating a mine-to-market business Metallurgical complex overview Geographic location Smelter and base metal refinery located in Montana Processes mined and recycled materials Provides unique insight into secondary market Becoming fully integrated mine-to-market Includes processing & sampling facili
Slide 23: Creating a mine-to-market business
Crea ket business Sibanye Metallurgical complex overview Geographic location ing a mine-to: + Smelter and base metal refinery located in Montana P fenet crae = © Processes mined and recycled materials + Provides unique insight into secondary market = Becoming fully integrated mine-to-market + Includ
Slide 24: Strong transaction rationale
Strong transaction rationale Value accretive, per detailed management due diligence Positioning the Platinum Division further down the global cost curve, with potential for further cost reductions Enhancing cash flow generation to sustain industry-leading dividend Improving access to lower-cost glob
Slide 25: Building a premier global gold and PGM mining company
Building a premier global gold and PGM mining company 2015A 4E Production1 (moz) 2015A Palladium Production (moz) 2015A Gold Production (moz) Barrick 6.1 Amplats ² 3.6 Norilsk ³ 2.7 Newmont 5.0 3.3 Norilsk ³ Amplats ² AngloGold 4.0 Impala Sibanye (Pro Forma) Gold Corp 3.5 Sibanye (Pro Forma) Impala
Slide 26: Quality growth and sustainability
Quality growth and sustainability Expected Gold and PGM LoM production plan (next 20 years) ounces 4 000 000 Sibanye, Gold Rustenburg + Aquarius, PGM 3 500 000 Stillwater ex. Blitz, PGM 3 000 000 Blitz first 5 years, PGM Blitz ramped up, PGM 2 500 000 Gold Fields plan, Gold 2 000 000 1 500 000 1 000
Slide 27: World class assets in an attractive mining jurisdiction
World class assets in an attractive mining jurisdiction High grade (20g/t), palladium biased (78% palladium), long life (+25 years), low-cost(>$500/2E oz),mechanised, operations Near term, organic and low-cost growth through the Blitz Project A mine-to-market PGM business Large PGM recycling busines
Slide 28: Stillwater assets high-grade and long-life
Stillwater assets high-grade and long-life PGM Assets by Reserve Grade and LoM (based on published reserves) Sibanye PGM mines Stillwater PGM mines Other PGM Assets include: 60 Amandelbult Section Bafokeng-Rasimone Bokoni Impala Marikana Modikwa Mogalakwena Pilanesberg Two Rivers Union Section Zimpl
Slide 29: Low-cost assets
Low-cost assets Stillwater All-in-Sustaining costs (“AISC”)1 and realised prices ($/oz) rate benefits 1 000 950 900 850 800 750 in 700 650 600 550 500 Q3 2014 Q4 2014 Q1 2015 Q2 2015 Q3 2015 Q4 2015 Q1 2016 Q2 2016 Q3 2016 Mid-term target (after Blitz ramp-up) AISC Realised basket price (Pt/Pd) Sour
Slide 30: Moving Sibanye Platinum down the cost curve
Moving Sibanye Platinum down the cost curve Global PGM Cash cost + Capex curve (CY16E - At spot) Cumulative Semi-Annual Production (koz) 0 500 1,000 1,500 2,000 2,500 3,000 3,500 4,000 4,500 5,000 5,500 6,000 6,500 7,000 7,500 8,000 8,500 2,000 2,000 1,750 1,750 down the PGM cost curve 1,500 1,500 1
Slide 31: Strong culture fit
Strong culture fit Shared focus on stakeholder engagement and responsibility 27 Stillwater Employees and safety – Focus on proactive safety and health systems to reduce loss and promote improvement Environmental excellence – State-of-the-art systems and treatment facilities – Strive to exceed enviro
Slide 32: Value analysis and financing plan
Value analysis and financing plan
Slide 33: NAV accretive
NAV accretive Broker target share price for Stillwater vs. Offer price $18.00 Offer Price $17.49 Average Nedbank 23-Nov-16 JPM 07-Nov-16 FBR 02-Nov-16 BMO 28-Oct-16 BoAML 28-Oct-16 GS 28-Oct-16 RBC 28-Oct-16 Target price avg. ($/sh) Management NAVPS Estimate¹¹ Target price ($/sh) Offer price ($/sh)
Slide 34: Accretive transaction at favourable point in cycle
Accretive transaction at favourable point in cycle The Transaction is expected to be accretive to cash flow per share following the ramp up of the Blitz Project – Blitz Project under development, ramping up to expected steady state production of 270,000oz – 330,000oz by 2021 / 2022 Increase in low c
Slide 35: Positions Sibanye shareholders for a potential re-rating
Positions Sibanye shareholders for a potential re-rating Price / NAV2 (peer mean shown) Other geographically diversified precious metals companies currently trade at premiums to pure play South African gold peers 1.2x • • PGM producers trade at premium to gold producers in South Africa Sibanye 3 Sou
Slide 36: Acquisition funding with equity raise
Acquisition funding with equity raise Transaction consideration funded by: Sibanye’s will have concluded c.$2.8bn of acquisitions (including Stillwater) in relation to its PGM strategy since 2015 – all cash funded – $2.7bn bridge financing from Citi and HSBC to fund the transaction consideration and
Slide 37: Rights offering supports capital structure flexibility
Rights offering supports capital structure flexibility Net Debt1 / Last twelve months (LTM) EBITDA1 ~2.9x nd FX4 2.5x nd FX4 1.5x <1.0x 0.9x Source: Company filings, FactSet Note: Yamana, Goldcorp, Barrick, Newmont, Kinross, Agnico-Eagle, Acacia and Randgold LTM as of 30 September 2016. AngloGold, N
Slide 38: Transaction Progress Has Been Positive To-Date
Transaction Progress Has Been Positive To-Date Positive interaction with Stillwater workforce and key stakeholders immediately post-announcement • • Investor feedback during roadshows indicated general support and a preference for minimal financial gearing as a result of the Transaction • US anti-tr
Slide 39: Transaction Progress Has Been Positive To-Date
ate Sibanye insaction Progress Has Been Positive + Positive interaction with Stillwater workforce and key stakeholders immediately post-announcement + Investor feedback during roadshows indicated general support and a preference for minimal financial gearing as a result of the Transaction + US anti-
Slide 40: Key takeaways
Key takeaways Transaction complements Sibanye’s strategic vision of creating a premier global gold and PGM mining company • Enhances the asset base - becoming a globally competitive South African mining champion • Being value accretive, per detailed management due diligence • Sibanye well positioned
Slide 41: Conclusion
Conclusion “We believe that this is a transformative transaction at a positive time in the cycle. With world-class operating assets and resource base, we are creating a cash-generative, globally competitive, South African mining champion” - Neal Froneman, CEO of Sibanye Creating a premier, global pr
Slide 42: CED 5242
CED 5242 “We believe that this is a transformative transaction at a positive time in the cycle. With world-class operating assets and resource base, we are creating a cash-generative, globally competitive, South African mining champion” - Neal Froneman, CEO of Sibanye Creating a premier, global prec
Slide 43: Questions
Sibanye we are one Questions
Slide 44: Stillwater financials
Stillwater financials Source: Company filings Note: 1. Other includes: Losses on trade receivable and inventory purchases, (Gain) / loss on disposal of PP&E, Loss on long-term investments, Impairment of PP&E and non-producing mineral properties, Exploration, Proxy contest, Accelerated equity based c
Slide 45: Stillwater mine asset overview
Stillwater mine Asset overview Geographic location 191 Stillwater Sweet Grass 87 89 Complex, Boulder NYE 212 Fishtail Mine Mine site overview M Reef Source: Company filings Notes: 1. Based on Stillwater guidance and approximate production split year to date 2. 840 claims subject to 5% NSR payable to
Slide 46: East Boulder mine asset overview
East Boulder mine Asset overview Geographic location 191 Stillwater Sweet Grass 87 Complex, Absarokee 212 Fishtail Big Horn Mine Mine site overview Source: Company filings Notes: 1. Based on Stillwater guidance and approximate production split year to date 2. 840 claims subject to 5% NSR payable to
Slide 47: Blitz project asset overview
Blitz project Asset overview Mine site overview 2,100m 2,400m PGM 56E10.4 40546 20.9ft @ 1.70oz/t PGM 40547 14.4ft @ 1.19oz/t PGM 1,800m 40552 3.9ft @ 2.49oz/t PGM 40553 2.6ft @ 1.40oz/t PGM 40553 3.5ft @ 0.73oz/t PGM TBM Dr ntional 5 48 Source: Company filings MetersE 70,000’E 10,000’Feet Blitz Pro
Slide 48: Stillwater PGM reserves
Stillwater PGM reserves 2,947 20.39 1,932 2,388 13.78 1,055 5,334 17.40 2,987 Reserves 10,978 19.55 6,900 23,115 13.37 10,024 34,093 15.36 16,924 Reserves Source: Company filings Note: 1 Imperial (short tons) converted to metric (long tonnes) 49 Stillwater MineEast Boulder MineTotal Montana Mines Or
Slide 49: Near-term, low-cost growth
Near-term, low-cost growth Gold equivalent production1 (koz) In addition, Stillwater recycled c.400 koz in 2015A Remaining capex to be spent: c.$150m c.200 c.3,021 2012 2013 2014 2015 Aquarius 2015 Rustenburg 2015 Stillwater 2015 Pro Forma 2015 Blitz c.2021 / 2022 (expected) Pro Forma Blitz 2 Source
Slide 50: Definitions
Definitions Stillwater AISC*: All-In Sustaining Costs (Non-GAAP): This non-GAAP financial measure is used as an indicator from period to period of the level of total cash required by the company to maintain and operate the existing mines, including corporate administrative costs and replacement capi
Slide 51: Definitions
Defi ions Sibanye Stihrater AISC*: + Akin Sustaining Costs Non-GAAP): Thit non-GAAP financialmeature ie used at an indicatorfrom period to petiod of the level of total cath required by the company te maintain and operate the existing miner, including corporate adminétrative cock and replacement capi
Stillwater Mining — Merger or Acquisition (February 2017) on 6ix