Anglo American Plc · LSE:AAL

Anglo American — FY2021 Earnings Presentation

99 slides from Anglo American's earnings presentation, Feb 24, 2022

  1. Slide 1: 24 February 2022

    24 February 2022 Processing plant, Quellaveco Anglo American

  2. Slide 2: Introductory comments

    Introductory comments Stuart Chambers Chairman 2 Anglo American

  3. Slide 3: Cautionary statement

    Cautionary statement Disclaimer: This presentation has been prepared by Anglo American plc (“Anglo American”) and comprises and undue reliance should not be placed on forward-looking statements. These forward-looking statements speak only as of the written materials/slides for a presentation concern

  4. Slide 4: 2021 results agenda

    2021 results agenda 2021 overview and look ahead Mark Cutifani The numbers Stephen Pearce Positioned for a sustainable future Mark Cutifani 4 Anglo American

  5. Slide 5: 'WeCare' approach: Covid & resilience

    ‘WeCare’ approach: Covid & resilience Responsible & holistic approach protecting lives & livelihoods in our workforce & communities Robust operating protocols & controls Rigorous testing approach Mental health & gender-based violence support Successful vaccine program delivered 5 Anglo American

  6. Slide 6: SHE performance – drive for a safe & healthy future

    SHE performance – drive for a safe & healthy future Safety Health Environment Group TRCFR1,2 Fatalities1 Occupational health – new cases1,3 Level 3 & above significant incidents1,4 5.42 30 209 3.17 101 96 2.66 15 H1: 2.33 2.21 2.14 6 2.24 39 9 30 H2: 2.16 16 2 5 4 1 1 1 2 1 2013 2017 2018 2019 2020

  7. Slide 7: Driving a healthy environment & thriving communities

    Driving a healthy environment & thriving communities Energy GHG emissions Social Way Compliance mGJ CO2 equivalent emissions Social Way Implementation5 106 18 18 17 97 16 16 87 15 49% 84 85 81 23% 91% 96% 89% Social Way 3.0 standards far exceed Social Way 2.0 2013 2017 2018 2019 2020 2021 2013 2017

  8. Slide 8: FY 2021 results

    FY 2021 results Production6 EBITDA7 Mining EBITDA margin8 5% $20.6bn 56% Unit cost, FX neutral9 EPS7 ROCE10 10% $7.22/sh 43% Up 16% including FX 8 Anglo American

  9. Slide 9: 2021 – solid operating performance

    2021 – solid operating performance Diamonds Base Metals11 Ongoing demand recovery Solid Copper performance Business transformation accelerated 2021 water challenges mitigated Solid unit cost performance Stable Nickel performance PGMs Bulks12 Significantly improved production Robust Iron Ore performa

  10. Slide 10: Our improvement journey

    Our improvement journey Portfolio restructuring P101 cost & volume Technical reconfiguration Incremental growth & debottlenecking Operating Model & processes New projects Mining EBITDA margin8 Margin based on long- term consensus commodity prices (which are ~36% lower than the 2021 basket price) 56%

  11. Slide 11: Significant improvement in our cost curve position

    Significant improvement in our cost curve position Average margin adjusted cost curve14 position over time -20% 49% -8% -21% 45% +13% +3% 43% 41% 39% 37% 36% 29% 27% 22% Peer 1 Peer 2 Peer 3 Peer 4 201314 2021F 11 Anglo American

  12. Slide 12: The numbers

    The numbers Stephen Pearce Anglo American Hong Kong, Central District

  13. Slide 13: FY 2021 results

    FY 2021 results EBITDA7 EPS7 Net debt $20.6bn $7.22/sh $3.8 bn Unit cost, FX neutral9 Shareholder returns15 Free cash flow16 10% $6.2bn $9.6bn Up 16% including FX Ordinary & special dividends and buyback 13 Anglo American

  14. Slide 14: Strong margins drive record EBITDA

    Strong margins drive record EBITDA Diamonds Base Metals 12 $1.1bn $4.3bn 47% mining EBITDA margin8 60% mining EBITDA margin8 $20.6bn 17 PGMs Bulks 13 $7.1bn $8.1bn 62% mining EBITDA margin8 55% mining EBITDA margin8 14 Anglo American

  15. Slide 15: Prices, operational recovery/improvement drive earnings

    Prices, operational recovery/improvement drive earnings EBITDA7 $bn 0.3 (0.2) 0.9 (1.5) 1.1 10.2 20.6 19.6 108 9.8 2020 Price18 Currency Covid ACP Cost & Other 2021 & CPI19 recovery recovery volume20 15 Anglo American

  16. Slide 16: Cyclical inflationary headwinds driven by strong prices

    Cyclical inflationary headwinds driven by strong prices 2021 unit cost performance9 2022 unit cost outlook Producer country FX headwinds 6% Inflation & input costs expected to increase in 2022 3% 16% Partly offset by higher expected 4% (4%) 2% volumes 10% 5% CPI Input costs Volumes Maintenance Other

  17. Slide 17: Capex recovering post initial Covid impact

    Capex recovering post initial Covid impact Capex22 $bn 5.2 2021 higher due to partial recovery from Covid delays / supply chain disruptions 4.1 1.8 Growth capex includes $0.8bn for Growth 1.5 Quellaveco & $0.5bn for Woodsmith 2.2 2022 capex to increase by ~$0.9-1.4bn 3.4 due to Covid rollover & high

  18. Slide 18: Strong cash generation drives robust balance sheet

    Strong cash generation drives robust balance sheet Net debt $bn $1.7bn reduction in net debt 5.5 1.1 PGM prices & customer prepayment result in working 3.8 capital reduction 2.4 (1.8) Robust cash generation across all business units Supporting disciplined, value-adding growth 202023 Working Cash Gro

  19. Slide 19: Healthy dividend pay-out with additional returns

    Healthy dividend pay-out with additional returns 499 c/sh 50 c/sh $0.6 bn H2 special dividend $0.6bn 80 c/sh $1.0 bn Buyback Special dividend announced for H2 2021 leading to… 80 c/sh $1.0 bn H1 special dividend 69% Total payout ratio in 2021 289 c/sh $3.6bn Base dividend 40% of underlying earnings

  20. Slide 20: Transparent taxes & royalties in host countries builds trust

    Transparent taxes & royalties in host countries builds trust UK $7.1 bn $0.4bn Taxes and royalties24 Paid in host country Brazil Other Africa Australia/Asia 89%24 increase from 2020 $0.5bn $0.7bn $0.4bn Chile $1.0bn South Africa $4.0bn 20 Anglo American

  21. Slide 21: Balanced capital allocation framework

    Balanced capital allocation framework 2021 allocation of capital Sustaining attributable free cash flow16 2021 dividend at 40% of underlying earnings15 Growth capex22 ($1.8bn) & additional shareholder returns ($2.6bn15) 21 Anglo American

  22. Slide 22: Cost and volume improvements on track

    Cost and volume improvements on track $3.5-4.5bn Projects: 2022-23 Up to $2.0bn Quellaveco Marine Diamonds Namibia 2021 delivery vs 2017 Technology & Innovation: 2020-23+ Predictive Maintenance Bulk Ore Sorting rollout Up to Coarse Particle Recovery $2.5bn Operating Model & P101: 2017-23 $1.4bn Copp

  23. Slide 23: Balanced, disciplined and sustainable approach

    Balanced, disciplined and sustainable approach Cash returns Attractive growth $12.3bn ~18 % Dividends & buybacks since 201715 Production growth by ~20236 Resilient balance sheet Capital employed by geography26 Other Chile 13% & Peru 0.2x Australia 23% 9% Botswana 12% 2021 Net debt:EBITDA7 & Namibia

  24. Slide 24: Positioned for a sustainable future

    Simple conversion of existing divider. Looks a bit old fashioned now I think compared to the rest of the fresh, modern style Positioned for a sustainable future Mark Cutifani Odaiba - Tokyo

  25. Slide 25: Driving towards a sustainable future

    Driving towards a sustainable future Greener World Electrified World Consumer World Cu Eq production6 Met Coal Diamonds Transition enabling High quality Copper Iron Ore ~85% Future enabling Crop Nutrients Nickel & PGMs Manganese 25 Anglo American

  26. Slide 26: By 2040 - operations carbon neutral & 50% cut in Scope 3

    By 2040 - operations carbon neutral & 50% cut in Scope 3 See footnotes 27 & 28 26 Anglo American

  27. Slide 27: Quellaveco video

    Quellaveco video Papujune processing plant Please click here for video 27 Anglo American

  28. Slide 28: Quellaveco on track for mid 2022 delivery

    Quellaveco on track for mid 2022 delivery Operations – Autonomous haul trucks Quellaveco Greenfield copper project On track for mid 2022 delivery despite Covid challenges • First ore delivered October 2021 • Processing plant – Line 1 ~90% complete, pre-commissioning underway • Water dam complete – p

  29. Slide 29: Quellaveco – a world class asset

    Quellaveco – a world class asset Papujune processing plant Growth: ~10% CuEq growth (~300ktpa29) Unit costs: since approval, first 5 years’ unit cost down from ~96c/lb to ~85c/lb (2018 real basis)(nominal: ~105c/lb to ~95c/lb) Production: +400kt29 of production brought forward – significant value en

  30. Slide 30: Portfolio complemented by high value growth options

    Portfolio complemented by high value growth options31 Moranbah-Grosvenor Mogalakwena Collahuasi Phase 2 Sakatti Woodsmith (Metallurgical Coal) (PGMs) (Copper) (Copper) (Crop Nutrients) ~2025 from ~2026 ~2028 ~2028 ~TBC ~$0.3bn capex on Number of options being Next stage expansion, Rich polymetallic

  31. Slide 31: Value-adding, future-enabling growth

    Value-adding, future-enabling growth >90% growth capex ~50 % margin 32 allocated to future-enabling products projects focus on high quality, low-cost assets Cu Eq production6 +35% +21% +18% Baseline portfolio ~2023 ~2025 ~20306 Met Coal Iron Ore PGMs Copper Crop Nutrients 31 Anglo American

  32. Slide 32: Purpose: to re-imagine mining to improve people's lives

    Purpose: to re-imagine mining to improve people’s lives Effectiveness Efficiency Sustainability >10 % 15-20% 7 Free Cash Flow33 ROCE 10 Pillars of Value (on capital employed) 2021 31% 43% Embedded 32 Anglo American

  33. Slide 33: Q&A – Our investment proposition

    Q&A Our investment proposition Competitive Differentiated Sustainable assets capabilities returns Strong cost position Technology-led EBITDA improvement $3.5-4.5bn Long term growth +35%6 Sustainability leader Disciplined capital allocation To ask a question, Standard International Dial-in: UK +44 (0

  34. Slide 34: Footnotes

    Footnotes 1. Recordable incidents. Data relates to subsidiaries and joint operations over which Anglo American has capital expenditure (sustaining/lifex only), net interest paid, dividends paid to minorities and capital management control. Since 2018 data for fatalities, TRCFR and environmental metr

  35. Slide 35: Appendix

    Appendix 35 Anglo American Mogalakwena North Concentrator

  36. Slide 36: Simplified earnings & guidance

    Simplified earnings & guidance 36 Anglo American Papujune Dome at Quellaveco

  37. Slide 37: 2021 simplified earnings by BU

    2021 simplified earnings by BU De Beers $m (unless stated) (Diamonds) Copper Nickel PGMs Iron Ore1 Met Coal Other 2 Total Sales volume (mined share) 33.4Mct3 641kt 42.1kt 3,442koz4 63.3Mt 14.1Mt5 Average benchmark price n/a $9,326/t6 $18,497/t6 n/a $169/t $211/t7 Product premium/discount per unit n/

  38. Slide 38: 2021 simplified earnings by BU - notes

    2021 simplified earnings by BU - notes PGMs basket price Iron Ore realised price Met Coal blended price Own mined Realised PGMs basket price Volume Revenue Total iron ore Kumba Minas-Rio Market price Volume Platinum $1,088/oz 1,546koz $1,682m Market price28 $169/t $160/t $185/t HCC $226/t 10.8Mt Pal

  39. Slide 39: Guidance summary

    Guidance summary Earnings Capex¹ (numbers in brackets are previous guidance) Other Volumes See slide 40-41 2022 $6.1-6.6bn ($6.2-6.7bn) Quellaveco copper project Growth $1.6-2.1bn ($1.7-2.2bn) Unit costs See slide 42 • Includes Woodsmith ~$0.6bn (~$0.7bn) • 2022 capex3: 100% $0.8-1.1bn; our share $0

  40. Slide 40: Production outlook

    Production outlook Units 2019 2020 2021 2022F 2023F 2024F Diamonds1 Mct 31 25 32 30-33 30-33 30-33 Copper2 kt 638 647 647 660-750 910-1,020 910-1,020 Previously 680-760 Platinum Group Metals3 Moz 4.4 3.8 4.3 4.1-4.5 4.1-4.5 4.1-4.5 Iron ore4 Mt 66 62 64 63-67 64-68 67-71 Metallurgical coal5 Mt 23 17

  41. Slide 41: Production outlook – supplementary guidance

    Production outlook – supplementary guidance Units 2019 2020 2021 2022F 2023F 2024F Chile: 560-600 Chile: 590-650 Chile: 590-650 Copper2 kt 638 647 647 Peru: 100-150 Peru: 320-370 Peru: 320-370 Previously 120-160 Pt: 1.8 Pt: 1.99 Pt: 1.9-2.1 Pt: 1.9-2.1 Pt: 1.9-2.1 Platinum Group Metals – M&C by meta

  42. Slide 42: Unit costs performance by Business Unit

    Unit costs performance by Business Unit De Beers (US$/ct)1 Copper (C1 USc/lb)2 PGMs (US$/PGM oz)3 57 58 ~65 ~140 868 ~900 113 120 713 2020 2021 2022F 2020 2021 2022F 2020 2021 2022F Iron Ore (FOB US$/t)4 Met Coal (US$/t)5 Nickel (C1 USc/lb)6 Previously ~$80/t 33 ~35 105 ~450 27 86 ~85 334 377 2020 2

  43. Slide 43: Earnings sensitivities

    Earnings sensitivities Impact of 10% Sensitivity Analysis – 20211 change in price / FX Commodity / Currency 31 December spot Average realised EBITDA ($m) Copper (c/lb)2 440 453 582 Platinum ($/oz) 962 1,083 181 Palladium ($/oz) 1,928 2,439 307 Rhodium ($/oz) 14,150 19,613 443 Iron Ore ($/t) 1193 157

  44. Slide 44: Capex recovering post initial Covid impact

    Capex recovering post initial Covid impact Capex¹ ($bn) Woodsmith ~0.6 (prev. ~0.7) 1.2-1.7 Growth 1.0-1.5 1.5-2.0 Collahuasi ~0.5 ~0.4 desal Collahuasi ~0.8 ~0.2 Lifex ~0.7 desal ~0.6 ~3.0 Baseline ~3.5 + ~3.4 ~3.3 sustaining Lifex 2022F 2023F 2024F Long-term (real) Totals 6.1-6.6 6.0-6.5 5.6-6.1 (

  45. Slide 45: Life extension capex

    Life extension capex Major components of lifex¹ ($bn) Guidance ~0.7 ~0.8 ~0.6 Mototolo – Der Brochen (PGMs) ~0.1 ~0.1 Kolomela (Iron Ore) ~0.2 ~0.2 ~0.1 Venetia (Diamonds) ~0.3 ~0.3 ~0.3 2022F 2023F 2024F Lifex projects – subject to disciplined capital allocation framework Forecast Returns Capex (pa

  46. Slide 46: Breakdown of projects driving growth capex

    Breakdown of projects driving growth capex Major components of growth capex¹ ($bn) Guidance 1.0-1.5 1.2-1.7 1.5-2.0 + 0.6 Woodsmith (prev. + 0.7) ~0.22 ~0.1 ~0.5 Mogalakwena (PGMs) Quellaveco 2 (Copper) ~0.62 ~0.4 ~0.2 Moranbah-Grosvenor (Met Coal) Sishen (Iron Ore) ~0.1 Collahuasi 5th ball mill 3 (

  47. Slide 47: Attractive greenfield and brownfield options

    Attractive greenfield and brownfield options Growth capex¹ ($bn) Long life greenfields and fast returning brownfields Capex Volume (pa) From¹ Forecast Returns Payback IRR Margin Quellaveco (Copper) ~$2.8bn2 +300kt2 2022 ~4 years >15% >50% Marine Namibia (Diamonds) ~$0.2bn3 +0.5Mct3 2022 ~3 years >25

  48. Slide 48: Technology & innovation will transform the physical footprint of mining

    Technology & innovation will transform the physical footprint of mining $0.2–0.5bn pa technology capex to more precisely target metal & mineral with less water, waste & energy Initiative Application Impact Progress • Testing complete at Barro Alto (Nickel) August 2020. ~$35 million capex Deliver imp

  49. Slide 49: Quellaveco financial modelling

    Quellaveco financial modelling Ownership Anglo American 60%, Mitsubishi 40% Fully consolidated with a 40% minority interest Accounting treatment Shareholder loans from minority shareholder consolidated in Anglo American net debt Project capex (nominal)1 $5.4-5.5 billion (previously $5.3–5.5bn) (100%

  50. Slide 50: Quellaveco accounting – ramp up & commercial production

    Quellaveco accounting – ramp up & commercial production First ore, ramp up and commissioning First ore: October 2021, Commissioning: mid-2022 followed by 12-month ramp up 2022 Production 100-150kt1 (previously 120-160kt) C1 unit cost - nominal ~$1.25/lb2 • Inventory recognised when first ore extract

  51. Slide 51: Quellaveco accounting - debt

    Quellaveco accounting - debt After the initial $0.8bn equity injection by Mitsubishi, the project is now funded 60:40 through shareholder debt Group net debt by the end of the project is expected to include ~$1.9bn debt from Mitsubishi (40% of shareholder debt); which is funded from their 40% share

  52. Slide 52: Map of Quellaveco

    Map of Quellaveco 52 Anglo American

  53. Slide 53: Liquidity

    Liquidity 53 Anglo American Quellaveco

  54. Slide 54: Strong liquidity & limited near-term debt maturities

    Strong liquidity & limited near-term debt maturities Liquidity11 Debt repayments ($bn)1 2.6 $17.1bn 1.8 +$9.1bn cash 1.6 +$8.0bn undrawn committed facilities 1.3 1.0 0.9 0.7 Majority of cash held centrally in US dollars 0.6 0.5 0.5 0.4 Strong Investment Grade credit metrics and ratings 2022 2023 202

  55. Slide 55: Business Units results

    Business Units results 55 Anglo American Benguela Gem (AMV3 vessel) outfitted – Cape Town

  56. Slide 56: Diamonds – strong demand recovery

    Diamonds – strong demand recovery Average Realised Underlying Mining Production1 Sales (Cons.)2 price index price3 Unit cost4 EBITDA margin5 Capex 2021 32.3Mct 33.4Mct 115 $146/ct $58/ct $1,100m 47% $565m vs. 2020 29% 56% 11% 10% 2% 164% 7pp 48% Underlying EBITDA ($m) 1,264 (176) 1,100 12 568 (60) (

  57. Slide 57: Copper – solid production & record prices

    Copper – solid production & record prices Realised Underlying Mining Production Sales1 price1 Unit cost2 EBITDA margin3 Capex4 2021 647kt 641kt 453c/lb 120c/lb $4,011m 62% $1,773m vs. 2020 0%  1% 52% 6% 115% 17pp 23% Underlying EBITDA ($m) 3,958 4,011 101 (87) (106) 159 2,080 1,864 2020 Price FX In

  58. Slide 58: Nickel – strong demand and prices

    Nickel – strong demand and prices Realised Underlying Mining Production1 Sales1 price Unit cost EBITDA margin Capex 2021 41.7kt 42.1kt 773c/lb 377c/lb $320m 45% $29m vs. 2020 4% 2% 37% 13% 55% 9pp 12% Underlying EBITDA ($m) 8 (21) 386 (45) (21) 320 193 206 2020 Price FX Inflation Cost & volume Other

  59. Slide 59: PGMs – good operational recovery & record pricing

    PGMs – good operational recovery & record pricing Realised Underlying Mining Production1 Sales2 basket price2 Unit cost3 EBITDA margin4 Capex 2021 4,299koz 5,214koz $2,761/PGM oz $868/PGM oz $7,099m 62% $894m vs. 2020 13% 82% 36% 22% 178% 11pp 57% Underlying EBITDA ($m) (470) 7,099 1,586 (638) 5,098

  60. Slide 60: Iron Ore Total – strong prices for our premium products

    Iron Ore Total – strong prices for our premium products Realised price Unit cost Underlying Mining Production1 Sales1 (FOB)2 (FOB)1 EBITDA margin Capex 2021 63.8Mt 63.3Mt $157/t $33/t $6,871m 62% $628m vs. 2020 3% 1% 41% 22% 51% 4pp 21% Underlying EBITDA ($m) 7,355 (219) (119) 284 (338) 6,871 (146)

  61. Slide 61: Kumba (Iron Ore) – solid production & premium prices

    Kumba (Iron Ore) – solid production & premium prices Realised price Unit cost Underlying Mining Production1 Sales1 (FOB)2 (FOB)1 EBITDA margin Capex 2021 40.9Mt 40.3Mt $161/t $39/t $4,311m 62% $417m vs. 2020 9% 0% 42% 26% 60% 7pp 18% Underlying EBITDA ($m) 4,549 (227) 284 (168) 4,311 (74) (70) 1,864

  62. Slide 62: Minas-Rio (Iron Ore) – strong prices for premium products

    Minas-Rio (Iron Ore) – strong prices for premium products Realised price Unit cost Underlying Mining Production1 Sales1 (FOB)1 (FOB)1 EBITDA margin Capex 2021 22.9Mt 23.0Mt $150/t $24/t $2,560m 61% $211m vs. 2020 5% 3% 40% 16% 37% 1pp 29% Underlying EBITDA ($m) 2,806 8 (45) (170) 2,560 (76) 980 1,86

  63. Slide 63: Metallurgical coal – production recovering & strong prices

    Metallurgical coal – production recovering & strong prices Realised Underlying Mining Production1 Sales1 price2 Unit cost3 EBITDA margin Capex 2021 14.9Mt 14.1Mt $200/t $105/t $962m 33% $649m vs. 2020 11% 16%  83% 22% n/a  30pp 5% Underlying EBITDA ($m) (140) 1,055 (21) 10 (117) 962 34 1,156 50 20

  64. Slide 64: Portfolio overview

    Portfolio overview 64 Anglo American Copper pipes

  65. Slide 65: Portfolio overview – key assets

    Portfolio overview – key assets1  Diamonds (De Beers) Gahcho Kué  Copper 3.2Mcts2 Woodsmith project ~10Mtpa3  PGMs  Iron ore  Metallurgical coal  Nickel  Crop nutrients Barro Alto 34kt Quellaveco Marine Namibia Jwaneng/Orapa project ~300kt4 1.1Mcts2 22.3Mcts2 Moranbah-Grosvenor 3.1Mt8 Collahu

  66. Slide 66: A differentiated portfolio of high quality assets

    A differentiated portfolio of high quality assets Revenue by product1 Capital employed by geography3 % %  PGMs 33  Chile & Peru 23  Iron ore 26  Brazil 22  Copper 15  South Africa 21  Diamonds (De Beers) 13  Namibia & Botswana 12  Metallurgical coal 7  Australia 9  Nickel 2  Other 13  M

  67. Slide 67: High quality diversified portfolio with long term potential

    High quality diversified portfolio with long term potential ~35Mct diamonds (De Beers)1 #1 producer by value, #2 by volume ~1Mt copper1 #10 producer currently, #7 post Quellaveco1 ~5Moz PGMs #2 producer, #1 processor ~75Mt high grade iron ore1 #5 export producer ~30Mt premium met coal2 #3 export pro

  68. Slide 68: Commodity outlook – medium to long term

    Commodity outlook – medium to long term • Global economic recovery and growing disposable income drives higher consumer demand Diamonds • Supply peaking due to existing mine exhaustion and lack of significant recent discoveries • Demand is robust in long term and accelerated decarbonisation presents

  69. Slide 69: De Beers: world leader in diamonds

    De Beers: world leader in diamonds Best-in-class business… …focused on consumers Mining EBITDA margin1 Global Demand3 48%  USA % 51  China 13  Gulf 5 Trading margin (typical level)2  India 9  Rest of world 22 ~7% Self purchases4 Millennials4 LGD price drops continue5 ~34 % ~61 % ~70 % of demand

  70. Slide 70: A growing, world class copper business

    A growing, world class copper business Quality assets with growth High value portfolio with long term potential Collahuasi 277 ktpa 1 (our share) ~1 Mtpa 1 Reserve life 86 years2 from ~2023 at mid to low Q2 cost position Los Bronces 328 ktpa 1 647 ~950 ~1,000 Reserve life 36 years2 20213 2023F Long

  71. Slide 71: World leader in PGMs

    World leader in PGMs Own mined production Own mined production Asset focused - by volume - by revenue 1. Mogalakwena 2. Amandelbult 69% 58% Mining EBITDA margin Mining EBITDA margin 3. Processing purchased concentrate1 18% EBITDA margin1 Improved ACP2 performance % % Daily average tonnes smelted  P

  72. Slide 72: PGMs market

    PGMs market Platinum demand1 Basket price driven by Pd and Rh %  Autocatalyst 39  Jewellery 23  Investment 2  Industrial 36 Rhodium ICE vehicles vast majority of light vehicles2 +587% Global light duty vehicle production outlook (million vehicles) 107  Battery 76  Hybrid (Pt, Pd, Rh)  Gasolin

  73. Slide 73: 5E Platinum group metals

    5E Platinum group metals Platinum Palladium Rhodium Global mined supply1 ~2 ~6 ~2 ~7 ~0.3 ~0.7 Our supply ~90% of demand is autocatalysts demand Industrial Pt & Pd convert harmful See previous slide for demand data carbon monoxide & Pt & Pd interchangeable in autocats 14% hydrocarbons to CO2 ~$2.1bn

  74. Slide 74: Structural trends favouring high quality bulks

    Structural trends favouring high quality bulks Iron ore: high quality products Metallurgical coal: premium products Kumba production Minas-Rio production High quality portfolio ~64 % Fe ~67 % Fe ~80 % of which 69% is lump Pellet feed products Hard coking coal (typical level)2 Production (Mt)1 Produc

  75. Slide 75: Woodsmith: a clear strategic fit

    Woodsmith: a clear strategic fit Quality asset Competitive product Progressing project infrastructure 27 year life1 ~10Mtpa ~$0.8bn4 invested to date Based on Ore Reserves POLY4 produced post ramp up Key permits in place $40-50/t unit cost Low carbon, organic2 ~$0.6bn4 2022 capex >50% margin potenti

  76. Slide 76: Our transformation journey

    Our transformation journey 76 Anglo American Reforestation at Airton Costa, Codemin in Brazil

  77. Slide 77: A transformed business…

    A transformed business… Covid disruption Production index1 Productivity index2 100% Productivity2 Cu Eq unit cost3 Portfolio 19% restructuring 108 Unit costs3 Operating Model and technical improvements ~60% Number of assets 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 1. Copper equivalent produ

  78. Slide 78: Innovation & technology

    Innovation & technology 78 Anglo American FutureSmart Mining

  79. Slide 79: A sustainable future for mining

    A sustainable future for mining 1900 Today Future 40kg Cu: 0.5% Cu 6m 3 water 24t waste 160 KWhr Reduced footprint 4% Cu 3m3 water 1t waste 10 KWhr 1t ore 8t ore Ore-only extraction Carbon neutral Water-less Ever increasing scale Precise. Predictable. Reliable 79 Anglo American

  80. Slide 80: Operational excellence underpins transformation

    Operational excellence underpins transformation Operating Model: delivering stable & predictable outcomes Stabilisation at Work is planned, scheduled and properly resourced higher performance Stable and consistent performance Stabilisation at still Further improvement higher impacting stability perf

  81. Slide 81: Innovative technologies: Bulk Ore Sorting

    Innovative technologies in development & roll-out Bulk Ore Sorting Sensors determine ore content prior to processing Delivers improved feed grade to plants Waste rejected early: • Grade uplift: +5% to 20% • Energy, water & cost savings Capital cost $10m to $80m (volume dependent) Deployed in Copper,

  82. Slide 82: Innovative technologies: Coarse Particle Recovery

    Innovative technologies in development & roll-out Coarse Particle Recovery Flotation process changed An enabler for hydraulic dry stacking Allows material to be crushed to larger particle size: • Throughput increase: +15% to 20% • 20% energy reduction per tonne1 • Up to 85% water recovery with hydra

  83. Slide 83: Innovative technologies: Hydraulic Dry Stacking

    Innovative technologies in development & roll-out Hydraulic Dry Stacking Low cost, safe, geotechnically stable dry tailings • Eliminate risk of liquefaction • Increases water recovery ~ 85% • Can be repurposed, benefiting host communities and biodiversity Hydraulic Dry Stacking demonstration at El S

  84. Slide 84: Innovative technologies: Hydrogen truck

    Innovative technologies in development & roll-out Hydrogen truck – zero emission haulage solution Developing world’s largest hydrogen powered mine haul truck, including associated refuelling infrastructure • 50% to 70% reduction in emissions (scope 1 and 2 for open pit mines), while maintaining oper

  85. Slide 85: Innovative technologies: Advanced Process Control

    Innovative technologies in development & roll-out Advanced Process Control (APC) • Uses process models, replaces manual control of processes • Optimises process performance • Up to 40% improvements in stability & productivity at certain operations • 4% reduction in water consumption at Los Bronces g

  86. Slide 86: Innovative technologies: Integrated Data Solutions

    Innovative technologies in development & roll-out Integrated Data Solutions Industry-first dedicated digital platform to deliver data-driven insights for mining operations Integrated suite of applications across the mining value chain • Creating a set of Digital Twins • Enabling each application to

  87. Slide 87: Innovative technologies: Carbon Neutrality

    Innovative technologies in development & roll-out Sustainability: Carbon Neutrality • Vent-air Methane abatement • Addressing ~10-15% of scope 1 & 2 emissions • Pumped hydro storage • Energy security: 800MW battery ~18 hours • CO2 sequestration • Accelerating path to neutrality Others • Hard rock cu

  88. Slide 88: Sustainability performance

    Sustainability performance 88 Anglo American Rio Do Vento wind farm (Anglo partnering with Casa Dos Ventos)

  89. Slide 89: Our Purpose 'Re-imagine mining to improve people's lives'

    Our Purpose ‘Re-imagine mining to improve people’s lives’ 89 Anglo American

  90. Slide 90: Our Sustainable Mining Plan at the heart of our strategy

    Our Sustainable Mining Plan at the heart of our strategy 90 Anglo American

  91. Slide 91: Active route to a greener world

    Active route to a greener world 2020 2021-22 2030 2040 Carbon 8% SA Thermal Coal demerger completed2 30% 30% energy improvement in absolute reduction neutrality efficiency1 Cerrejón sale of shareholding completed2 energy efficiency3 in GHG emissions3 across our operations4 22% 100% 8 sites Net posit

  92. Slide 92: Operations carbon neutral by 2040

    Operations carbon neutral by 2040 Scope 1 & 2 - GHG emissions South America renewable energy Three Solar PV plants in 2030 goal – 30% reduction of South Africa GHG emissions vs 20161 Hydrogen trucks pilot Regionally integrated solar and Southern Africa wind in South Africa electrical supply Carbon n

  93. Slide 93: Ambition: 50% reduction in Scope 3 emissions by 2040

    Ambition: 50% reduction in Scope 3 emissions by 2040 Scope 3 GHG emissions Production growth in future enabling Thermal coal products mines divested Our ambition: Met coal 50% reduction Iron ore Production growth Steel value chain outpaces steel value decarbonisation chain decarbonisation takes effe

  94. Slide 94: Summary inventory of our Scope 3 emissions

    Summary inventory of our Scope 3 emissions Scope 3 - GHG emissions 115Mt 77% of our emissions driven by Total Scope 3 emissions steel industry Leased Investments Capital Business Transportation Use of sold assets goods travel & distribution products Purchased Transportation Franchises Operational Em

  95. Slide 95: Industry leading dam safety management

    Industry leading dam safety management Managing tailings safely Tailings dams in our portfolio Group Technical Specialists Internal risk assurance Downstream/ Independent Technical Review Panel other BU Technical Standard expert Engineer of Record Upstream Southern Australia Operation Africa 6 level

  96. Slide 96: ESG integrated into management remuneration

    ESG integrated into management remuneration SHE targets in annual bonus 20% + critical tasks All employees incentivised on safety Critical tasks include safety and ESG ESG targets in LTIPs Higher sustainability related weighting vs FTSE 100 average 20% 96 Anglo American

  97. Slide 97: A sustainable, responsible & transparent business

    A sustainable, responsible & transparent business ESG ratings Overall score 78/100 ‘A’ rated ‘Prime’ rated Overall score of 4.5 (out of 5), #4 out of 81 companies assessed On par with peers Industry leader which puts us in the top percentile in the mining & metals category and in joint second place

  98. Slide 98: Measuring our ESG progress: 2021 targets

    Measuring our ESG progress: 2021 targets Pillar of Value Metric 2021 2020 Target Target achieved Safety & Health Work-related fatal injuries 1 2 Zero Not achieved Total recordable case frequency rate per million hours 2.24 2.14 Year-on-year reduction Not achieved New case of occupational disease 16

  99. Slide 99: Investor Relations

    Investor Relations Paul Galloway paul.galloway@angloamerican.com Tel: +44 (0)20 7968 8718 Juliet Newth juliet.newth@angloamerican.com Tel: +44 (0)20 7968 8830 Emma Waterworth emma.waterworth@angloamerican.com Tel: +44 (0)20 7968 8574 Michelle Jarman michelle.jarman@angloamerican.com Tel: +44 (0)20 7

Anglo American — FY2021 Earnings Presentation on 6ix