  1. Slide 1: Developing the third-largest copper mine

    Scotiabank Mining Conference DECEMBER 1-2, 2015 Developing the third-largest copper mine

  2. Slide 2: Forward-looking statements

    Forward-looking statements This presentation includes certain “forward-looking information” within the meaning of applicable Canadian securities legislation and “forward-looking statements” within the meaning of the “safe harbour” provisions of the United States Private Securities Litigation Reform

  3. Slide 3: Investment summary

    Investment summary Oyu Tolgoi: Tier 1 asset in production from open pit • Concentrator performance improving; currently averaging above nameplate capacity • All-In Sustaining Cost $1.29 per pound of copper (September 2015) • Cash of $1.3 billion (September 2015) • Investment to date of > $6.5 billio

  4. Slide 4: Production highlights

    Production highlights Concentrator throughput ('000 tonnes) Concentrate production and sales (‘000 tonnes) 262.7 9,025 8,632 226.0 215.5 210.3 7,505 7,512 189.8 186.7 167.7 Production 130.9 Sales Q4'15 Q1'15 Q2'15 Q3'15 Q4'15 Q1'15 Q2'15 Q3'15 Throughput averaging 2-3% above capacity post-July shutd

  5. Slide 5: Financial highlights

    Financial highlights Cash position ($'000,000) Operating cash flow ($'000,000) $1,310.4 $417.5 $1,200.0 $954.2 $862.8 $239.2 $171.7 $105.3 Cu: $2.97* Cu: $2.66 Cu: $2.77 Cu: $2.39 Au: $1,200* Au: $1,219 Au: $1,194 Au: $1,124 Q4'14 Q1'15 Q2'15 Q3'15 Q4'14 Q1'15 Q2'15 Q3'15 Growing cash position, debt

  6. Slide 6: Underground: next steps

    Underground: next steps Project Finance Feasibility Study • Signing expected by end of 2015 • Revised development schedules submitted August 2015 • MIGA signed September 2015 • Updated CAPEX estimate expected Q1’16 • Drawdown expected Q2’16 after board approvals • Incorporates productivity improveme

  7. Slide 7: Project financing – flow of funds

    Project financing – flow of funds Today1 At project financing drawdown Payable to Turquoise Hill* Receivable from Oyu Tolgoi* Proceeds: $4.2 billion2 $4.2 billion $4.2 billion Shareholder loan: $6.8 billion Shareholder loan: $6.8 billion Payable to Turquoise Hill* Receivable from Oyu Tolgoi* Deposit

  8. Slide 8: Shaft and underground development status

    Shaft and underground development status Shaft 1 completed in 2008, 1,385m Off-shaft lateral development 16km 2008 – Aug 2013 Shaft 2 currently 1,167m, ~100m left Shaft 5 currently 208m, ~1,000m left Extensive geotechnical data collection program Demonstrated performance and quality 8

  9. Slide 9: Ore flow

    Ore flow APEX LEVEL Lateral Development lg UNDERCUT LEVEL ~-@ > eC Lateral Development Undercutting Undercut Mucking & Ground Support EXTRACTION LEVEL \vaa"/ «>t PB paid: Lateral Development & Ground Support Drawpoint / Drawbell Production Construction Secondary Breaking \ rere Foe: DUMP AT Fill Tru

  10. Slide 10: Medium-term timeline

    Medium-term timeline 2015 – 2016 2016 – 2021 2021 – 2026 2026 + • Sign project finance • Hugo North Lift 1 Construction • First draw bell production • Hugo North Lift 2 • Complete feasibility • Additional $1.8 billion project • Ramp-up to full production • Hugo South study financing debt • Hugo Nort

  11. Slide 11: Highly-attractive economics

    Highly-attractive economics Reserve Case (Feasibility Study) 2014 Reserve Case Total Processed (Bt) 1.5 Plant Copper Grade (%) 0.85 Gold Grade (g/t) 0.32 Oyut Open Pit Silver Grade (g/t) 1.94 Hugo North Copper Recoverable (B lb) 24.9 Lift 1 Gold Recoverable (M oz) 11.9 Silver Recoverable (M oz) 78.0

  12. Slide 12: Multiple development options

    Multiple development options Production creep targeted along with expansion Actual operating performance will inform choice of expansion path A decision to expand the concentrator is not required for a couple years 12

  13. Slide 13: Copper industry overview

    Copper industry overview Post-2020 copper mine C1+sustaining cost curve (c/lb, 2015$) 400 Third largest copper Oyu Tolgoi mine after planned Other Mines expansion1 300 Top 10 copper deposit by contained reserves 200 and resource2 One of the largest gold 100 deposits by contained reserves and resourc

  14. Slide 14: Long-term copper fundamentals strong

    Long-term copper fundamentals strong Copper mine supply/demand outlook (Mt) Small surplus likely over next few years Base Highly Probable Primary Demand 30 Ongoing attrition at existing Forecast mines driven by declining 25 grade 20 Continued demand growth requires new capacity in the 15 medium-term

  15. Slide 15: Turquoise Hill – a long-term growth opportunity

    Turquoise Hill – a long-term growth opportunity Pure copper and gold exposure Positive operating cash flow and focusing on asset optimization Agreed path forward for development of the high-grade underground mine Significant growth, development and expansion opportunities Resources located near Chin

  16. Slide 16: Appendix

    Appendix

  17. Slide 17: Probable development schedule

    Probable development schedule Complete Convey to Surface Sustainable Underground Production Complete Concentrator Project Start Upgrade Complete Ramp-up 1st Draw Bell Firing 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 Set-Up Excavation (Lateral / Mass / Vertical) Undercutting Ex

  18. Slide 18: Oyu Tolgoi at China's doorstep

    Oyu Tolgoi at China’s doorstep 18

  19. Slide 19: Made in Mongolia

    Made in Mongolia Mongolians now occupy 95% of Oyu Tolgoi roles Since 2010, in-country spend of $5.1 billion (Mongolian suppliers, salaries, taxes and other Government payments) Partnered with more than 800 local suppliers in 2015, accounting for over 50% of procurement spend In April 2015, Oyu Tolgo

  20. Slide 20: Summary of Underground Development Plan

    Summary of Underground Development Plan Concludes outstanding shareholder matters Resolves initial development costs Maintains Investment Agreement tax stability principles Tax settlement of $30 million Clarifies sales royalty calculation Eliminates 2% net smelter royalty Provides path forward for r