Alpha Hpa Limited · ASX:A4N

Alpha Hpa — Augur Resources — Shareholder Meeting (November 2016)

27 slides from Alpha Hpa's shareholder meeting presentation, Nov 29, 2016

  1. Slide 1: Cover letter to ASX

    ABN 79 106 879 690 29 November 2016 The Manager Companies ASX Limited 20 Bridge Street Sydney NSW 2000 (27 pages by email) Dear Madam, PRESENTATION TO ANNUAL GENERAL MEETING I attach a PowerPoint presentation which is to be delivered to the shareholders present at today’s Annual General Meeting whic

  2. Slide 2: Emerging Gold and Copper Producer AGM Presentation 2016

    AUGUR RESOURCES LTD ABN 79 106 879 690 Emerging Gold and Copper Producer AGM Presentation 2016

  3. Slide 3: Disclaimer

    Disclaimer This presentation has been prepared by Augur Resources Ltd (ABN 79 106 879 690) (‘Augur’) based on information available to it from its own and third party sources and is not a disclosure document nor any other form of offer to invest in Augur securities. This presentation does not purpor

  4. Slide 4: 2016 Highlights

    2016 Highlights ™ Finalising Wonogiri flow sheet, previous metallurgical testing (2012) on a high‐grade composite sample reported up to 89.0% recovery of gold and 94% recovery of copper via flotation. Potential for up to 55% recovery of gold by gravity prior to flotation . ™ Updated JORC 2012 compli

  5. Slide 5: 2016 Highlights

    2016 Highlights ™ Issue of Aggregate licence covering 99 hectares within Wonogiri IUP to Rajawali subsidiary PT Anugerah Agung Perdana. ™ Feasibility study completed on aggregate and currently converting to initial 5 year operation production licence (4 X 5 year extensions) with Aggregate mining pla

  6. Slide 6: Indonesian Project Locations

    Indonesian Project Locations www.augur.com.au 5

  7. Slide 7: Wonogiri - Updated Internal Scoping Study

    Wonogiri ‐ Updated Internal Scoping Study ™ Updated internal scoping study announced 30 August 2016 (previous study released 11 March 2014) evaluated an open cut mine with material treated by gravity concentration to produce a gold (+ silver) rich gravity concentrate and a copper (+gold, silver bear

  8. Slide 8: Wonogiri - Open Pit Design

    Wonogiri – Open Pit Design Section 9138150mN Looking North Stage 1 Pit Stage 2 Pit Randu Kuning deposit cross section showing contained metal value above base case C1 operating cost using $1,350 per ounce gold and $5,500 per tonne copper. Stage 1 pit contains 60% of total in‐pit gold and copper. www

  9. Slide 9: Wonogiri - Resource Model

    Wonogiri – Resource Model Higher grade Au occurs close to surface and captured in Stage 1 pit with a strip ratio of 1.4:1. Combined Stage 1 and 2 pits have a total 3:1 strip ratio. Deposit remains open at depth with drillhole IWG 02 returning 37 metres of 1.77 g/t Au and 0.23% Cu from 458 metres dow

  10. Slide 10: Wonogiri - Regional Prospects

    Wonogiri – Regional Prospects JANGGLENGAN PROSPECT AREA KEPIL PROSPECT AREA ™ Located about 1.0 kilometre south of ™ Located about 500 metres south west of Randu Kuning. Randu Kuning. ™ Initial scout hole WDD56 intersected: ™ Scout hole WDD58 intersected 36.0 metres at 0.28% Cu from 25.0 metres. • 3

  11. Slide 11: Wonogiri - Metallurgy Finalising Flowsheet

    Wonogiri – Metallurgy Finalising Flowsheet Currently testing sulphide composite at run‐of‐mine average grades to further evaluate gravity recoverable gold (GRG) and flotation recovery of Cu (Au‐Ag) with leach tests of gravity concentrate and flotation tails. Results from current testing have returne

  12. Slide 12: Wonogiri - Conceptual Flowsheet

    Wonogiri – Conceptual Flowsheet ROM sulphide ore 0.9 g/t Au, 0.19% Cu & (1 ppm Ag) Flotation Circuit Grind to ‐106um Regrind ‐30um Gravity (~50% Au recovery) Falcon Shaker Est. Total Recovery >85% Cu, >88% Au Table Tailings Storage Gravity concentrate to Intensive Leach Reactor at off‐site location.

  13. Slide 13: Wonogiri - Aggregate Potential

    Wonogiri – Aggregate Potential 67.7 hectares outside Randu Kuning pit, potential 50+ million tonnes of high quality aggregate. www.augur.com.au 12

  14. Slide 14: Wonogiri - Aggregate Potential

    Wonogiri – Aggregate Potential Randu Kuning Aggregate sourced from hard, intrusive rock (diorite) www.augur.com.au 13

  15. Slide 15: Wonogiri - Aggregate Potential

    Wonogiri – Aggregate Potential ™ Areas to the south of the Randu Kuning pit where some land already owned. ™ Natural topographic high which would mean lower mining costs. ™ Start with low capex aggregate mine and then use funds to self fund development of Randu Kuning pit. Randu Kuning deposit Quarr

  16. Slide 16: Wonogiri (Aggregate) Summary

    Wonogiri (Aggregate) Summary ™ Wonogiri contains one of the few legal, large, high quality aggregate deposits in Central Java (14 million tonnes for Randu Kuning only). ™ Potential for the current known aggregate deposits to be significantly expanded. ™ Close proximity to major infrastructure projec

  17. Slide 17: Wonogiri - Development Schedule

    Wonogiri ‐ Development Schedule www.augur.com.au 16

  18. Slide 18: Tapadaa Project

    Tapadaa Project TAPADAA PROJECT ‐ INDONESIA ™ Scout drilling at Tapadaa project intersected 0.61 g/t Au over 22m from surface (including 3m at 1.23 g/t Au from 0‐3m) within oxidized volcanics, with a further 0.14% Cu over 12m (27‐42m) and a further 0.13 g/t Au and 0.14% Cu over 8m (116‐124m) to end

  19. Slide 19: Tololudu Project

    Tololudu Project TOLOLUDU PROJECT ‐ INDONESIA ™ Scout drilling at Tololudu returned 0.22% Cu over 60m (12‐72m) including 12m of 0.34% Cu, hole ended in 0.13% Cu in potassic breccia with abundant magnetite. Further drilling is warranted to evaluate defined targets further. ™ Currently in discussions

  20. Slide 20: Collerina

    Collerina ™ 16.3 million tonnes at 0.93% nickel and 0.05% cobalt (cut off 0.7% nickel). ™ Total resource estimated to contain 151,000 tonnes of nickel and 8,100 tonnes of cobalt. ™ Mineralisation is at surface in some areas and has an average depth of only 10 metres. ™ Initial counter‐current atmosp

  21. Slide 21: Augur - A Value Proposition

    Augur ‐ A Value Proposition ™ Advanced Projects: Wonogiri (Au/Cu) and Homeville (Ni). ™ Wonogiri aggregate project potential for near term cashflow (2017). ™ Wonogiri gold – copper project potential for low capex profitable open pit mine. ™ Randu Kuning porphyry remains open at depth with 2 epitherm

  22. Slide 22: Strong Local Partner - Rajawali Corporation

    Strong Local Partner – Rajawali Corporation ™ Rajawali Corporation through its subsidiary PT Archi 35% shareholder in Augur through placement of A$6.75m in 2013. ™ Rajawali founded in 1984, is one of the largest privately owned conglomerates in Indonesia with operations in mining, plantations, hotel

  23. Slide 23: Experienced Board and Management

    Experienced Board and Management Norman B.Ec (University of Sydney) Seckold 30+ years in the full time management of natural resource companies. Past Chairman and Director of Chairman listed companies including Bolnisi Gold NL, Timberline Minerals Inc., Perseverance Corporation Limited, Valdora Mine

  24. Slide 24: Corporate Summary

    Corporate Summary Directors Projects Wonogiri (Indonesia) ‐ gold, copper, aggregate • Norman Seckold ‐ Chairman • Justin Werner ‐ Managing Director Gorontalo (Indonesia) ‐ gold, copper • Peter Nightingale ‐ Director and CFO Collerina (Australia) ‐ nickel, cobalt Capital Structure Share Price – 52 we

  25. Slide 25: Statement of Compliance

    Statement of Compliance The information in this report that relates to Mineral Exploration is based on information compiled by Augur staff and contractors and approved by Mr Michael Corey, PGeo., who is a Member of the Association of Professional Geoscientists of Ontario (APGO) in Canada. Michael Co

  26. Slide 26: JORC (2012) Summary - Randu Kuning

    JORC (2012) Summary – Randu Kuning COG M AuEq CLASS AuEq g/t tonnes g/t Au g/t Cu % • At a 0.5 g/t AuEq cut‐off grade the total resource is 21Mt at 1 4.88 1.36 1.28 0.23 0.79 g/t gold and 0.16% copper. 0.8 7.73 1.18 1.11 0.21 0.6 12.74 0.99 0.91 0.18 MEASURED 0.5 15.65 0.91 0.83 0.17 • 533,000 oz of

  27. Slide 27: Thank you

    Thank you Augur Resources Ltd Level 2, 66 Hunter St, Sydney, NSW 2000, AUSTRALIA Phone: +61 2 9300 3310 ASX code: AUK www.augur.com.au 26

Augur Resources — Shareholder Meeting (November 2016) on 6ix