  1. Slide 1: Community Liaison Committee Meeting #31

    Community Liaison Committee Meeting #31 December 10th, 2019

  2. Slide 2: Agenda

    Agenda 1. Review of September 10th, 2019 meeting notes 2. Membership Items 3. Site Specific Standards / Technical Standards 4. Public Complaints 5. Environmental Compliance Approval updates 6. Legacy Environmental Action Plan 7. Climate Change 8. Public Open House 9. Next Meetings December 10th, 201

  3. Slide 3: Membership Items

    Membership Items Current Members and Alternates Representation Primary Member Alternate Algoma Steel Fred Post Chris Galizia Ministry of Environment, Conservation & Parks Lori Greco Ron Dorscht Public David Trowbridge Peter McLarty Public Patt Marquis SSM Tribe of Chippewa Indians Kathie Brosemer Al

  4. Slide 4: Site Specific Standard for Particulate and BaP

    Site Specific Standard for Particulate and BaP • On March 27th, 2015 Algoma received a Site Specific Standard for Particulate which sets specific emission limits in cokemaking: – Certified observers (per EPA Method 9 and Method 303) – 5 days per week, 10 Saturdays and 10 Sundays each year – Must obs

  5. Slide 5: Site Specific Air Quality Standard - Particulate & B(a)P

    Site Specific Air Quality Standard - Particulate & B(a)P Identifies Key Performance Indicators related to Cokemaking Emissions: o average intensity of pushing emissions o average duration of charging emissions o % lid leaks Conformance calculated daily for o % off-takes leaks each battery o % door l

  6. Slide 6: Improved Air Quality - Cokemaking Emissions Performance

    Improved Air Quality - Cokemaking Emissions Performance All batteries performing below the 2020 limit ahead of schedule.

  7. Slide 7: Progressive Improvement - Cokemaking Opacity Performance

    Progressive Improvement - Cokemaking Opacity Performance • Continuous corrective actions being undertaken on all batteries • Part of the investment plan to achieve compliance with SSS limits also focuses on reducing stack emissions from cokemaking • Intensive Masonry maintenance continues to be requ

  8. Slide 8: Public Complaints

    Public Complaints There were no public complaints received since the last CLC meeting that related to a matter addressed in the SSS Order. The following public complaints were received by the company since the last CLC: • 9 Odour • 3 Particulate • 0 Noise An internal investigation into each public c

  9. Slide 9: Prevailing Winds

    Prevailing Winds The following link shows a visual representation of local predominant winds https://weatherspark.com/y/16136/Average-Weather-in-Sault-Ste.-Marie-Canada-Year-Round Each of the following diagrams show annual site specific wind measurements from the past five years 9

  10. Slide 10: Prevailing Winds

    Prevailing Winds The following diagrams show site specific wind measurements taken over the past five years 10

  11. Slide 11: Technical Standard

    Technical Standard Regulatory Instrument to replace existing SSS’s • A new Technical / Site Specific Standard for multiple air contaminants is under development • Contaminants include: Particulate, B(a)P, Benzene, Sulfur Dioxide, Total Reduced Sulfur and Metals (x4) Next steps – Algoma Steel partici

  12. Slide 12: Larger Baghouse Proposed

    Larger Baghouse Proposed Application for amendment to existing Compliance Approval Algoma Steel is applying for approval to install a larger baghouse on its No. 2 Ladle Metallurgy Furnace to improve capture efficiency at both ladle metallurgy treatment stations and at the basic oxygen furnaces (stee

  13. Slide 13: LEAP - Addressing Legacy Environmental Issues

    LEAP - Addressing Legacy Environmental Issues Legacy Environmental Action Plan (LEAP) • The LEAP is a risk-based environmental management plan with the objectives of identifying, assessing, managing and mitigating off-site adverse environmental effects caused by Legacy Environmental Contamination at

  14. Slide 14: Addressing Legacy Environmental Issues

    Addressing Legacy Environmental Issues PCB Removal and Tire Recycling Destruction 454 tonnes of All known legacy oversize remaining PCB tires were materials were recycled removed and destroyed Hydrogeological Sediment Dredging Investigation from Boat Slip Site wide ground and 6200 tonnes of surface

  15. Slide 15: Addressing Legacy Environmental Issues

    Addressing Legacy Environmental Issues New Secondary New Secondary Containment on Containment on Raw Waste Oil Storage Liquor Storage Tanks Tanks Ground & Surface Engineering design to Water Treatment re-route an effluent Facility Engineering discharge to a Design treatment facility 15

  16. Slide 16: Climate Change Action

    Climate Change Action Algoma Steel continues to find opportunities to reduce greenhouse gas emissions. In 2019 we earmarked $47 million for three projects that will deliver a targeted 79,000 tonne reduction. 79,000 TONNE REDUCTION 16,773 PASSENGER VEHICLES DRIVING FOR ONE YEAR OR 9,460 HOMES’ ENERGY

  17. Slide 17: Public Open Houses

    Public Open Houses Next open house scheduled for: TUESDAY, DECEMBER 10, 2019 4:00 PM – 7:00 PM NORTHERN COMMUNITY CENTRE KORAH BRANCH LIBRARY COMMUNITY ROOM – 556 GOULAIS AVENUE 17

  18. Slide 18: Next Meeting

    Next Meeting • Proposed 2019 Schedule: • December 10th, 2019 (today) • March 10th, 2020 18