    Important Information The release, publication or distribution of this presentation in certain jurisdictions may be restricted by law and therefore persons in such jurisdictions into which this presentation is released, published or distributed should inform themselves about and observe such restric

  3. Slide 3: Investment Highlights

    Investment Highlights Adelong Gold Project Santa Rita do Aracuai Lithium Project  Foundations for a commercial project  An ideal complementary expansion  800k ozs historical production opportunity to Adelong’s project portfolio in a key, demand driven commodity in the massive  68km2 Exploration

  4. Slide 4: Santa Rita do Aracuai Lithium Project

    Santa Rita do Aracuai Lithium Project Highly Prospective Lithium Tenement Package in Brazil’s World Class Lithium Valley • Adelong Gold has entered into a binding agreement to acquire 3 prospective lithium exploration tenements in the prolific ‘Lithium Valley’ of Minas Gerais, Brazil • The region is

  5. Slide 5: Project Geology

    Project Geology • The three Exploration Permits (EPs):  show strong potential to host lithium- bearing pegmatites  cover the Ribeirão da Folha formation that forms part of Neoproterozoic Araçuaí orogeny and are proximate to fertile granite intrusives of the Salinas Formation  are in an area that

  6. Slide 6: Lithium Valley

    Lithium Valley • Lithium valley is situated within Minas Gerais province, rapidly becoming recognised as a world class lithium destination. • Within this province there have been several major discoveries:  Sigma Lithium’s (NASDAQ:SGML) Grota do Cirio Deposit 1: 94.2Mt @1.45% Li2O  Latin Resources

  7. Slide 7: Adelong Gold Project

    Adelong Gold Project Adelong Goldfield (NSW) Significant Resource Permitted with Processing Scoping Study confirms a 188K Total JORC Resource 1 Projects Potential Options viable project 800k ozs Challenger Adelong Gold has Mining permit in place The initial Scoping Study Historical production 8

  8. Slide 8: Scoping Study

    Scoping Study An attractive project based on mining only existing measured and indicated resources Various mining and processing Study relates to only Table 1 - Summary of the financial analysis options were considered with the final selection (Base Case) <50% (Based on A$2,650oz) presented in the f

  9. Slide 9: Additional Potential to Increase Adelong Project Returns

    Additional Potential to Increase Adelong Project Returns Resource Expansion Underground Mining Gold Price Regional Potential • The Scoping Study shows any • Around 50% of the current • The Scoping Study was based • The Adelong Mine Site is additional shallow resources resources have not been on a go

  10. Slide 10: Resource Expansion

    Resource Expansion Historic production from the Adelong Goldfield more than 800,000oz • Existing resources are largely open at depth and along strike and recent drilling at Perkin’s West, Caledonian and Sawpit all show immediate potential for additional resources. • Many multiple vein systems exist

  11. Slide 11: Regional Potential

    Regional Potential Potential to truck ore into the Adelong Processing Plant • The Adelong Gold Project Processing Plant is located just 1.5km from the Snowy Mountain Highway • This plant is the only processing plant approved for use of cyanide in +100km radius • This gives it a major advantage that

  12. Slide 12: adelonggold.com

    Peter Mitchell Ian Hastings Mark Flynn Managing Director Chairman Investor Relations +61 400 880 309 +61 408 581 022 +61 416 068 733 peter.mitchell@adelonggold.com ian.hastings@adelonggold.com mark.flynn@adelonggold.com adelonggold.com Released with the Authority of the Board – November 2023

  13. Slide 13: Appendix: Resources Statement (JORC 2012)

    Appendix Resources Statement (JORC 2012) for Adelong Project based on 1g/tAu Cutoff Resources Statement (JORC 2012) for the Adelong Gold Project based on 1g/tAu Cutoff • Adelong Gold has substantially CHALLENGER deposit Tonnes (t) Au (g/t) Au (oz) increased the project resources since Measured Indic