Galilee Energy Limited · ASX:GLL

Galilee Energy — RIU Good Oil Conference 2015

15 slides from Galilee Energy's conference presentation, Sep 2, 2015

  1. Slide 1: Galilee Basin in Focus

    Slide 1: Galilee Basin in Focus

    RIU Good Oil Conference - Perth 2 September 2015 Galilee Basin in Focus Peter Lansom – Managing Director

  2. Slide 2: Corporate snapshot

    Slide 2: Corporate snapshot

    Corporate snapshot Financial information Top shareholders Share price (28-Aug-15) A$0.099 Ecarlate 12.1% Ekco Investments 4.9% Number of shares 152.1M AMP Capital Investors 5.5% Market capitalisation A$15.1M Nero Resource Fund 4.2% Cash (30-Jun-15)1 A$16.0M Directors and management 7.2% Debt (30-Jun

  3. Slide 3: Board and management

    Slide 3: Board and management

    Board and management STRONG LEADERSHIP TEAM ASSEMBLED WITH PROVEN WORLD CLASS EXPLORATION SUCCESS Proven exploration success of Galilee Energy Board and management team  Core Galilee Energy exploration team is ex-Origin – Team was fundamental in building Origin’s portfolio of upstream CSG assets 

  4. Slide 4: Delivering on strategy

    Slide 4: Delivering on strategy

    Delivering on strategy EXECUTION OF OUR STRATEGY IS WELL UNDERWAY WITH STRONG PERFORMANCE IN ALL THREE FOCUS AREAS Maximise the value of the  100% GLL following AGL acquisition foundation asset ATP 529P  New resource assessment Demonstrate commercial gas flow, book 1  Govt. approval of R1 work pr

  5. Slide 5: Galilee Energy global operations

    Slide 5: Galilee Energy global operations

    Galilee Energy global operations GALILEE HAS ASSEMBLED A GLOBAL PORTFOLIO OF DIVERSIFIED EXPLORATION AND DEVELOPMENT ASSETS 1 Maximise the value of 2 Build a strong the foundation asset production base Demonstrate Invest and develop commercial gas flow, USA onshore to book reserves, unlock deliver h

  6. Slide 6: Unlocking the Galilee Basin

    Slide 6: Unlocking the Galilee Basin

    Unlocking the Galilee Basin SUCCESSFUL DEMONSTATION OF COMMERCIAL FLOWS MAY UNLOCK THE FUTURE OF THIS PROJECT  Ingredients in place to become a key supplier to the Location of ATP 529P (Galilee Basin) structurally short east coast gas market  Very large uncontracted resource  High resource concen

  7. Slide 7: 2015 MHA Resource Assessment

    Slide 7: 2015 MHA Resource Assessment

    2015 MHA Resource Assessment 2,508PJ OF 2C CONTINGENT RESOURCES HIGHLIGHT THE LARGE SCALE PRODUCTION POTENTIAL OF ATP 529P* 2015 MHA Resource Assessment overview ATP 529P estimated resources (PJ)  2015 MHA Resource Assessment significantly +387% 5,314 upgraded the ATP 529P contingent resources The

  8. Slide 8: Exploration history of ATP 529P

    Slide 8: Exploration history of ATP 529P

    Exploration history of ATP 529P SUPERIOR GEOLOGICAL UNDERSTANDING BUILT ON COMPREHENSIVE HISTORIC DATABASE  Significant historic exploration activity ATP 529P project map – Commenced in 1992  Historic works provided an excellent geological database across the entire permit – Database focuses on st

  9. Slide 9: CSG properties of Betts Creek

    Slide 9: CSG properties of Betts Creek

    CSG properties of Betts Creek BETTS CREEK COAL EXHIBITS EXCELLENT CSG PROPERTIES  Successful CSG projects require three key parameters: Betts Creek – Resource Concentration (thickness, gas content) ✓ R1 – Productivity (thickness, permeability) ✓ – Pressure drawdown in the coal (well design) ?  Res

  10. Slide 10: ATP 529P pilot performance

    Slide 10: ATP 529P pilot performance

    ATP 529P pilot performance DESPITE LIMITED HISTORIC PERFORMANCE THERE WERE SIGNS OF COMMERCIAL PRODUCTION POTENTIAL  Demonstrating commercial flow is the final element to Previous Glenaras pilot performance booking reserves  Previous pilot well designs have failed to achieve sufficient pressure dr

  11. Slide 11: Pathway to commercial flow

    Slide 11: Pathway to commercial flow

    Pathway to commercial flow BETTS CREEK COAL SHOW Formation Image Log EXCELLENT PERMEABILITY  New completion design formulated to suit the geological setting  Key is accessing the coal and drawing down pressure in the coal and not the sand  Coals have excellent master cleat development and good pe

  12. Slide 12: Glenaras R1 seam pilot

    Slide 12: Glenaras R1 seam pilot

    Glenaras R1 seam pilot THE R1 SEAM HAS NOT BEEN TESTED AND HAS THE POTENTIAL TO PROVE SIGNIFICANT RESERVES  Galilee intend to re-complete the Glenaras wells to test the R1 seam – R1 is thickest seam, never completed in initial pilot testing  Program is to isolate lower coals via bridge plug, perfo

  13. Slide 13: Forward program at ATP 529P

    Slide 13: Forward program at ATP 529P

    Forward program at ATP 529P ASSESSMENT OF R1 SEAM COMMERCIAL PRODUCTION POTENTIAL EXPECTED TO COMPLETE IN 1H 2016  Testing of the uppermost R1 coal seam is planned to commence early in Q4 2015  Cash expenditure will be prudently managed over the next 3 quarters with clear focus  The initial phase

  14. Slide 14: A well funded growth story

    Slide 14: A well funded growth story

    A well funded growth story GALILEE IS WELL FUNDED AND HAS THE EXPERIENCE TO EXECUTE ON OUR CLEAR STRATEGY  ~A$16.0m* of cash and fully funded Strong  Prudent deployment of cash Balance Sheet  Major resource upgrade in Galilee Basin and now 100% ownership and Operator  Glenaras R1 pilot to commen

  15. Slide 15: Disclaimer

    Slide 15: Disclaimer

    Disclaimer Competent Persons Statement & Listing Rule 5 Reporting on Oil & Gas Activities The estimate of Contingent Resources for the ATP 529 as appears on page 8 of this presentation, is based on, and fairly represents, information and supporting documentation determined by Mr Timothy L. Hower of

Source: Internet Archive copy of galilee-energy.com.au

More decks from Galilee Energy Limited

All 43 Galilee Energy decks