Alkane Resources Ltd · ASX:ALK

Alkane Resources — Alkane Exploration — Excellence in Exploration and Mining Conference 2005

47 slides from Alkane Resources's conference presentation, Oct 17, 2005

  1. Slide 1: ASX cover letter for presentation

    ‘A /- | ALKANE EXPLORATION LTD ‘em 2 A.B.N 35 000 689 216 wns: 17 October 2005 Manager Announcements Company Announcements Office Australian Stock Exchange Limited 20 Bridge Street Sydney NSW 2000 Dear Sir, PRESENTATION Attached is a copy of a presentation entitled “Advancing Several Projects” being

  2. Slide 2: Advancing Several Projects

    KANE EXPLORATION LTD dvancing Several Projects Excellence in Exploration and Mining . Sydney October 2005 Soin : ET

  3. Slide 3: Corporate Profile

    CORPORATE PROFILE a ASX Code 4 Issued Capital a Cash (30/09/05) 4 Trading Range (12 mths) a Current Market Cap a No Debt ALK (listed since 1969) 156m shares A$2.0m A$0.13 - $0.26 A$30m

  4. Slide 4: Australia location map

    10Nns eam) So is) © — wa) iS) a o) Sam Q. la — Austral

  5. Slide 5: Central West NSW Projects

    Central West [ae «ee NSW [@xemme'st Projects NORTHPARKES sae | Cudal Cu-Au _ vn ilk nger granites Monzonitic intrusions Ordovician are volcanics Fifield complexes

  6. Slide 6: Peak Hill Gold Mine

    PEAK HILL GOLD MINE Conventional Open Cut Mining Agglomeration Heap Leach recovery of gold Production Commenced 1996 at Capital Cost $5 million 100,000-500,000 ounces in sulphide deposit from 100m to 300m moderately refractory ore ~ subject on-going review ALxane

  7. Slide 7: Tomingley Gold Project Regional Outcrop Geology

    Tomingley Gold Project Regional Outcrop Geology Hervey Group Dulladerry Rhyolite Yeoval Granite Forbes Group ELSG75. . aia! Cotton Formation : . Peak Hil. se Py L _ Mine Site| Goonumbia (Mingelo) Volcanics

  8. Slide 8: Bee

    Bee a ee oe es Cd a 8 i oe oe Oe a | on ao : ee i : : Lo oe Lay Lo (ay aay Le ae oD Co / i. i yy ee oe LAG : Oe } Wa ai ot ly, yo ’ Le a) iS a HNC - ae EE Sinn Se eee : i ii ae

  9. Slide 9: Wyoming Geological Summary

    Wyoming Geological Summary CL elitic sediments Feldspar porphyry Volcaniclastic sediments desite lava la Chlorite-talc Mineralisation

  10. Slide 10: Wyoming One Simplified Interpretation

    Wyoming One Simplified Interpretation Cotton Formation Feldspar porphyry sediments Carbonaceous mudstone ; { Mineralisation

  11. Slide 11: Wyoming One North-South Section

    Wyoming One North - South Section 614075mE Alluvium Feldspar porphyry Volcaniclastic sediments Co Volcaniciastic conglomerate Chiorite-talc schist Pa) [ Mineralisation

  12. Slide 12: Wyoming One East-West Section

    Wyoming One East - West Section 6393300mN Alluviurn Cotton Formation Feldspar porphyry sediments Volcaniclastic conglomerate Chlorite-talc schist 5 | Mineralisation Hangingwall zone Contact zone

  13. Slide 13: Tomingley Gold Project Resource Summary

    TOMINGLEY GOLD PROJECT Resource Summary Wyoming One and Three Dec’ 04 0.75g/t gold cut off piel Measured indicated inferred

  14. Slide 14: Wyoming History

    TOMINGLEY GOLD PROJECT Wyoming History Acquisition: Separate production royalties Compass March 2001; Golden Cross August 2001; Climax January 2004 Area: 366km2 Drilling: First intercept May 2001 — Wyoming One 2001 — 13,939m (223) - exploration 2002 — 24,871m (279) — evaluation - Wyo Three discov Ju

  15. Slide 15: Wyoming Development Summary

    TOMINGLEY GOLD PROJECT Wyoming Development Summary Current program: Remodelling of ore system optimise open pit grade Examine u/g options based on high grade shoots Drilling down dip - down plunge extensions at Wyoming One in HWZ, Porphyry Structural modelling with pmd*CRC (CSIRO) Regional assessmen

  16. Slide 16: Wyoming One 3D Model with pit and u/g development

    Wyoming One 3D Model with pit and u/g development S

  17. Slide 17: Wyoming One 3D Model with pit and u/g development

    Wyoming One 3D Model with pit and u/g development S

  18. Slide 18: 3D Model with pit and u/g development

    ith pit and u/g development S 3D Model wi

  19. Slide 19: Tomingley Gold Project Regional Exploration

    Tomingley Gold Project Regional Exploration a My De a DM Lae Lo an oe LD ae es i Von U | Lp oe a. yy ay Ds ue 7 o Lo ue ly

  20. Slide 20: Dubbo Zirconia Project Summary

    DUBBO ZIRCONIA PROJECT SUMMARY * Avery large : and resource (+ 100 million tonnes) ¢ Project based upon large Jurassic aged alkaline volcanic complex with highly metal enriched vertical trachyte intrusive * Feasibility study to produce high quality zirconia-zirconium chemicals; niobium- tantalum con

  21. Slide 21: Project Site and Infrastructure Location

    DUBBO ZIRCONIA PROJECT Project Site and Infrastructure Location

  22. Slide 22: Dubbo Zirconia Project Resources

    DUBBO ZIRCONIA PROJECT RESOURCES Measured Resource : 35.7 million tonnes grading 0 - 55 metres 1.96% Zr0,, 0.04%HFO,, 0.14% YO, 0.46% Nb,O,, 0.03% Ta,0, and 0.75% REO Inferred Resource : 37.5 million tonnes at similar grades 55 - 100 metres 73.2 million tonnes The ore body is weakly radioactive (U a

  23. Slide 23: Uranium Resources

    DUBBO ZIRCONIA PROJECT URANIUM RESOURCES Measured Resource : 35.7 million tonnes grading 0 - 55 metres 0.014% U,0, Inferred Resource : 37.5 million tonnes @ 0.014% U,0O, 55 - 100 metres TOTAL : 73.2 million tonnes @ 0.014% U,0, ~ 23 million pounds

  24. Slide 24: Process Flow Sheet

    DUBBO ZIRCONIA PROJECT PROCESS FLOW SHEET

  25. Slide 25: Structure of the Zirconia Industry

    DUBBO ZIRCONIA PROJECT Structure of the Zirconia Industry RAW MATERIALS PROCESSED PRODUCTS END USES BADDELYITE ZIRCONIA PRODUCTS 5,000 tonnes (Generally increasing purity) FUSED ; Refractories ZIRCONIA Ceramic Pigments CHEMICAL Glass/Gernstones PURIFICATION Catalysts ZIRCON Oxygen Sensors SOF! 100,0

  26. Slide 26: Niobium - Tantalum Market

    DUBBO ZIRCONIA PROJECT Niobium - Tantalum Market 90% HSLA Steels Superalloys - aerospace and gas turbines Optical glass, ceramic capacitors, superconductors (MRI etc) 60% Electronics -- ceramic capacitors Superalloys - turbines hard tools, Ta chemicals

  27. Slide 27: The strategic value of the DZP

    DUBBO ZIRCONIA PROJECT The strategic value of the DZP? Current world zircon production (2004) = 1.165Mtpa, about 10 - 15% converted to higher value zirconia and zirconium chemicals. Significant world zircon supply deficit is developing with 100,000t shortage anticpated by 2008. DZP provides a strate

  28. Slide 28: Current zircon uses

    DUBBO ZIRCONIA PROJECT >, Ceramics CURRENT ZIRCON TV Glass USES Source: fluka Oct 05 A LKANE

  29. Slide 29: Zircon Supply / Demand Outlook

    DUBBO ZIRCONIA PROJECT Zircon Supply / Demand Outlook Surplus / deficit (000s tonnes) w & < < ° £ a 2 = 2 3 < q E é 3 = ® 5 a £ 3 wn x Balance (RHS) o=«x Supply — Demand Source: fluka Oct 05

  30. Slide 30: Possible future advancements

    DUBBO ZIRCONIA PROJECT Possible future advancements Resource size would enable significant scale up from base case 200,000tpa to 500,000tpa or larger Annual revenue stream increased from US$25m to US$60-80m by scale up Additional increase by improved (quality) base case products Production of separa

  31. Slide 31: Process Flow Sheet - Possible developments

    DUBBO ZIRCONIA PROJECT Process Flow Sheet - Possible developments ation | i Retunak Pe Uranium recovery Separated yttrium Zirconium and Separated niobium and HREE’s hafnium metal and tantalum

  32. Slide 32: Possible future developments in zirconium stream

    DUBBO ZIRCONIA PROJECT Possible future developments in zirconium stream Separation of zirconium and hafnium to prepare various metal products: ZIRCONIUM: sponge (~US$20-25/kg) > metal (~US$200-250/kg) Major uses: cladding in nuclear power plants, corrosion resistant piping, special alloys HAFNIUM: m

  33. Slide 33: Current Strategy

    DUBBO ZIRCONIA PROJECT Current Strategy Alkane proceeding to float 50% of AZL (the holding subsidiary) on AIM and ASX, and/or consider new JV with existing producer/end user Raise/inject sufficient capital to complete process optimisations, and construct and operate the Demonstration Pilot Plant ~A$

  34. Slide 34: Wellington Bodangora Regional Geology

    Wellington Bodangora Regional Geology Great Australian Basin Permian sediments Carboniferous granite Devonian ~ Silurian sediments and volcanics Ordovician volcanics and sediment Monzonite intrusives Bodangora mine vein system | Nindethana thrust zone A || Galwadgere Ind’cted Res | +20,000t Cu/+25ko

  35. Slide 35: Galwadgere Geological Interpretation with Recent Resource Drill Holes

    Wellington Project Galwadgere Geological Interpretation with Recent Resource Drill Holes Permian sediments Devonian sediments Urian volcanics

  36. Slide 36: Galwadgere October 2004 RC Drill Holes

    Wellington Project Galwadgere October 2004 RC Drill Holes ce ; — — a Permian sediments Devonian sedim Devinian secrete. oe ae Silurian volcanics ee

  37. Slide 37: Galwadgere Long Section

    Permian sediments Galwadgere Devonian sediments Long Section Silurian volcanics

  38. Slide 38: Galwadgere conceptual pit

    Galwadgere 350mRL Conceptual pit | Permian sediments Devonian sediments Siturian volcanics

  39. Slide 39: Galwadgere - project site

    Galwadgere - project site

  40. Slide 40: Wellington Project Galwadgere Program

    WELLINGTON PROJECT Galwadgere Program Scoping study: Basic open pit concept and flotation concentration To 350mRL (110m deep) 7.8:1 waste ore ratio Recover 1.5Mt @ 1.00% Cu and 0.26q/t Au Met work generated basic clean concentrate 20 — 27% Cu and 1.59 — 3.38g/t Au with 85% recovery of Cu Model gave

  41. Slide 41: Orange Area Regional Geology

    Orange Area Regional Geology Newmont Joint Venture za Quaternary WI t=iary Carboniferous granites Siluro-Devonian granites || Siluro-Devonian sediments Ordovician monzonite and related intr Ordovician Ordovician volcanics

  42. Slide 42: Nullagine

    Nullagine ee ae Ce eg. 7 a LD ; . a fe a a : | Ue i 2A Ee cal yl g (RATA TN ey NE sic, i Mm Jy ae i a : 2 . aaa vs SNM : a de i Mo ‘i le se iis a) Siti, ae a i

  43. Slide 43: Nullagine Project — satellite image

    Nullagine Project — satellite image | ™) Bonnie Creek Palaeochannel

  44. Slide 44: Nullagine Project — Bonnie Creek Palaeochannel

    Nullagine Project — Bonnie Creek Palaeochannel Mesa deposits

  45. Slide 45: Nullagine Project - Tertiary Palaeochannel

    Nullagine Project - Tertiary Palaeochannel Bonnie Well Drill Traverse

  46. Slide 46: Nullagine Project Channel Iron Deposits

    Nullagine Project Channel Iron Deposits Bonnie Creek System | | Tertiary Palaeochannels Potential 150 - 220M tonnes CID pisolite iron Surface sampling Fe Sid, ALO, P LOI Fe(C) 58 3.23 3.95 0.03 9.07 63

  47. Slide 47: Disclaimer

    ILKANE EXPLORATION LTD . Bho soo, yen www.alkane. Disclaimer: This presentation contains certain forward looking staternents and forecasts, including possible or assumed reserves and resources, production levels and rates, costs, prices, future performance or potential growth of Alkane Exploration L