Pure Gold Mining — Investor Presentation (May 2017)
31 slides from Pure Gold Mining's investor presentation, May 2017
Slide 1: May 2017 PGM:TSX-V
May 2017 PGM:TSX-V
Slide 2: Forward Looking Statement
FORWARD LOOKING STATEMENT Cautionary Statement on Forward-Looking Information & Statements This presentation contains certain forward-looking information and statements which may not be based on fact, including without limitation, statements regarding the Company’s expectations in respect of its fut
Slide 3: A Fresh Look at a Historic Producer
Pure Gold Mining A FRESH LOOK AT A HISTORIC PRODUCER JURISDICTION Red Lake, Ontario, Canada – an established mining district with more than 28 million ounces of high grade gold produced to date (1) One of the highest grade undeveloped deposits in the world (2) with HIGH GRADE currently defined resou
Slide 4: Direct Red Lake Experience
Pure Gold Mining DIRECT RED LAKE EXPERIENCE Management & Technical Team Board of Directors Darin Labrenz, President, CEO & Director Graeme Currie, Chairman • Former VP Business Development, Terrane Metals Corp. • Former Director, Investment Banking at Canaccord Genuity • Former Chief Geologist, Plac
Slide 5: Capital Structure
Pure Gold Mining CAPITAL STRUCTURE Capital Structure (as at May 10, 2017) Key Shareholders (2) Shares Outstanding 191.5 million Management & Directors 4.9% Options Outstanding 13.0 million Strategic Shareholders 27.3% Weighted average exercise price $0.34 AngloGold Ashanti 10.8% Evanachan Ltd. (Robe
Slide 6: 2017 Focus on Growth
Pure Gold Mining 2017 FOCUS ON GROWTH 70,000m of drilling in fully funded Phase I exploration program Aggressive Drill Program Close to Infrastructure • Plan to grow resource and improve PEA metrics • Four diamond drill rigs active and focused on resource expansion in McVeigh, Austin and A3 targets
Slide 7: Red Lake Mining District
Red Lake Mining District CANADIAN HIGH GRADE GOLD BELT +28 million oz high-grade gold mined in Red Lake to date (1) • Established, mining-friendly jurisdiction with +85 year history • 1.6 million ounces of gold produced in the district at a grade of 18.8 g/t from 2013 to 2016 (2) • 45 km2 contiguous
Slide 8: Focused on Discovery in a Proven District
Madsen Gold Project FOCUSED ON DISCOVERY IN A PROVEN DISTRICT 3rd largest 2.5 million oz 9.9 g/t LAND PACKAGE IN RED LAKE HISTORICAL PRODUCTION (1) AVERAGE HISTORICAL GRADE (1) • Permitted mill and tailings management facility • Second largest historic producer in Red Lake, with continuous historica
Slide 9: Focused on Discovery in a Proven District
Madsen Gold Project FOCUSED ON DISCOVERY IN A PROVEN DISTRICT Russet South Target Tailings Madsen Madsen #2 Shaft Management McVeigh Portal Facility and Decline Site Offices McVeigh Austin Mill Powerline 8
Slide 10: +$200 Million of Existing Infrastructure
Madsen Mine & Mill +$200 MILLION OF EXISTING INFRASTRUCTURE(1) Portal to underground ramp Interior of Madsen mill 1,275 metre deep shaft Permitted tailings facility & 27 levels of workings Madsen mill (1) Management estimate to replace existing infrastructure at current cost estimates. 9
Slide 11: Modern Science Driving Exploration
Madsen Gold Project MODERN SCIENCE DRIVING EXPLORATION • Multiple highly prospective targets currently being drill tested 10
Slide 12: Multiple Gold Zones Open for Expansion
Madsen Target Settings MULTIPLE GOLD ZONES OPEN FOR EXPANSION Note: Mine workings and geologic contacts in this image are schematic. The mineral resource estimate reported herein for the Madsen Gold Project is set out in the NI 43-101 technical report “Technical Report on the Preliminary Economic As
Slide 13: Austin – McVeigh Setting
Madsen Mine Geology AUSTIN – MCVEIGH SETTING McVeigh • Limited near-surface production with a maximum historic mining depth of 230 metres • Recurrent south-plunging mineralized system • Open for expansion – focus of current drill program Austin • Hanging wall horizon mined from surface to a depth of
Slide 14: Targeting High Grade Gold Shoots at McVeigh
Madsen 2017 Drill Program TARGETING HIGH GRADE GOLD SHOOTS AT MCVEIGH A’ B’ 50.0 g/t Au 11.0 g/t Au 4.0 m 4.2 m 133.4 g/t Au 2.0 m 69.0 g/t Au 1.2 m 67.5 g/t Au 1.1 m 21.3 g/t Au 1.5 m 17.7 g/t Au 2.0 m Note: See Pure Gold news releases dated March 1, 2016, April 4, 2016, May 17, 2016, June 14, 2016
Slide 15: Austin Long Section – A3 Target
Madsen 2017 Drill Program AUSTIN LONG SECTION – A3 TARGET • New gold target located within the Austin Horizon, interpreted to be another sub-parallel gold bearing structure that is open in all directions(1) 16.7 g/t Au 1.0 m 25.4 g/t Au 8.0 m 58.8 g/t Au 2.0 m 6.3 g/t Au 3.3 m 14.3 g/t Au 1.0 m (1)
Slide 16: Targeting High Grade Gold Mineralization
Madsen 2017 Drill Program TARGETING HIGH GRADE GOLD MINERALIZATION Resource Growth Close to Mine Infrastructure • Geologic setting genetically and spatially links mineralization in multiple settings • A3 discovery is a direct application of modern exploration geoscience to a data rich project • Mine
Slide 17: +5km Mineralized System
Madsen Property +5km MINERALIZED SYSTEM Fork McVeigh Starratt Austin Significant Gold Mineralized System, Scale Potential • Austin open down plunge - hole AD-11-01 returns 14.3 g/t gold over 2.0m at 2.1km vertical depth • McVeigh open for expansion – drilling expanding gold mineralization outside of
Slide 18: Russet South: Potential for Near Surface Resource
Russet South POTENTIAL FOR NEAR SURFACE RESOURCE • Satellite gold target located ~1.5 km west of the McVeigh horizon and existing infrastructure • New Zone of Mineralization Discovered PG17-335 returns 4.4 g/t gold over 12.0m including 14.3 g/t gold over 2.0m • Continuity of Mineralization – drillin
Slide 19: Russet South: Potential for Near Surface Resource
Russet South POTENTIAL FOR NEAR SURFACE RESOURCE • Gold mineralization associated with multiple geologic contacts (1) See Pure Gold news releases dated May 11, 2017, March 27, 2017, November 14, 2016, April 11, 2016, March 16, 2015 and March 2, 2015 18
Slide 20: Preliminary Economic Assessment
Madsen Gold Project PRELIMINARY ECONOMIC ASSESSMENT • Initial PEA (April 2016) shows total gold 2016 PEA (1) production of ~260,000 ounces over a 6.5 year mine life at an average diluted head grade of Pre-Tax / After-Tax IRR 8.3 g/t gold (1) 74% / 62% Positive base case assessment of developing Pr
Slide 21: Pure Opportunity
Pure Gold Mining PURE OPPORTUNITY High grade deposit with long mining history Large mineral system open for expansion New science has significantly increased understanding of deposit geology providing a framework for exploration success +$200 million of infrastructure (1) Attractive base case PEA wi
Slide 22: Appendix
APPENDIX puregold,, 21
Slide 23: Madsen Gold Project Exploration Targets
Madsen Satellite Zones MADSEN GOLD PROJECT EXPLORATION TARGETS 22
Slide 24: Austin Long Section – A3 Target
Madsen 2017 Drill Program AUSTIN LONG SECTION – A3 TARGET • New high grade gold target located within the Austin Horizon, interpreted to be another sub-parallel gold bearing structure that is open in all directions(1) Note: See Pure Gold news releases dated October 31, 2016 and February 28, 2017 for
Slide 25: Starratt
Madsen Satellite Zones STARRATT • Regional target associated with the historic Starratt Olsen Mine Located ~2.2km south of the Madsen No. 2 Shaft • Open down plunge and along strike, in an analogous geological setting to the McVeigh, South Austin and Austin horizons • Starratt Olsen Mine produced
Slide 26: Current Mineral Resource
Madsen Gold Project CURRENT MINERAL RESOURCE Grade Grade Contained Gold Resource Class Zone Tonnes g/t Au oz/t oz Au Indicated Austin 1,677,000 7.92 0.23 427,000 South Austin 850,000 9.32 0.27 254,000 McVeigh 374,000 9.59 0.28 115,000 8 Zone 335,000 12.21 0.36 132,000 Total Indicated 3,236,000 8.93
Slide 27: 2016 PEA – Additional Details
Madsen Gold Project 2016 PEA – ADDITIONAL DETAILS • Underground mining via mechanized cut and fill, PEA SUMMARY PARAMETERS (1) shrinkage, and long-hole mining methods Gold Price US$1,175/oz • $20.1 million in pre-production capital costs over a Exchange Rate (US$ to C$) 0.80 12-month period Total Re
Slide 28: Benchmarking vs. Peers – Resource Grade
Pure Gold Mining BENCHMARKING VS. PEERS – RESOURCE GRADE M&I Resource Grade 12.0 11.61 10.0 8.93 M&I Resource Grade (g/t Au) 8.88 8.72 8.42 8.0 5.87 6.0 4.91 4.09 4.0 3.50 2.66 1.63 2.0 0.0 (1) Dalradian Pure Gold Integra Harte Osisko Sabina Gold Auryn Eastmain Condor Gold ATAC Midas Gold Inferred R
Slide 29: Benchmarking vs. Peers – Market Cap & P/NAV
Pure Gold Mining BENCHMARKING VS. PEERS – MARKET CAP & P/NAV Price / NAV 1.01x 0.99x 0.95x 1.00x 0.75x 0.59x Price / NAV 0.53x 0.48x 0.50x 0.35x 0.28x 0.25x 0.00x Integra Sabina Gold Osisko Dalradian Pure Gold Midas Gold ATAC Eastmain Market Capitalization $746 $600 $545 $500 $429 $420 Market Cap (C
Slide 30: One of the World's Highest Grade Gold Projects
Madsen Gold Project ONE OF THE WORLD’S HIGHEST GRADE GOLD PROJECTS Select High Grade Gold Assets Hope Bay (TMAC) Back River (Sabina) Brucejack (VOK) Fire Creek Madsen Red Lake Brucejack (VOK) Cocheneur (Pretium) Jerusalem Zaruma Fire Creek & Midas Lamaque (Integra) (Klondex) Madsen Cocheneur & Red G
Slide 31: Corporate Inquiries
Corporate Inquiries: Darin Labrenz President & CEO t: 604.646.8000 info@puregoldmining.ca PGM:TSX-V 1900 – 1055 West Hastings Street Vancouver, BC V6E 2E9 www.puregoldmining.ca